22 September 1998 LAr WeekM. Lefebvre Signal Feedthrough Progress Report Pin Carriers FEA Update Presented by Terry Hodges TRIUMF and University of Victoria.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

1 Isabel Trigger ACOT March 13 th, 2009 ATLAS at the LHC …and at TRIUMF CANADA’S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
Randall Sobie The ATLAS Experiment Randall Sobie Institute for Particle Physics University of Victoria Large Hadron Collider (LHC) at CERN Laboratory ATLAS.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
Preliminary Design Review 1: Project Plan Senior Design: Team Burja ___________________________________________________________________________________________________________________________________________________________________________________________
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Richard KeelerDepartment Review, April Particle Physics Group Faculty and Researchers Research directions –Overview –OPAL, ATLAS, BaBar Infrastructure.
October 2003, Particle Physics Visit of Dean of Science, Dr. T. Pedersen 1 Particle Physics Department of Physics and Astronomy Introductions Overview.
24 Oct 2001, M. LefebvreVisit of TRIUMF Director, Dr A. Shotter1 Particle Physics Department of Physics and Astronomy Visit of TRIUMF Director Dr Alan.
TRIUMF and the University of Victoria Joint meeting of Operations Committee and the Board of Management June 28, 2002 Overview of Victoria particle physics.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
Particle Physics at UVic Research directions and initiatives Ministry of Advanced Education/UVic Round Table Friday 27 February 2004 M. Lefebvre Physics.
October 16th 2000 NSERC Site Visit M. Lefebvre1 ATLAS at the University of Victoria M. Lefebvre NSERC Site Visit October 16th 2000 The ATLAS Experiment.
Large Hadron Collider and ATLAS in Canada First beam circulation 10 September 2008 Rob McPherson Canadian Institute of Particle Physics and the University.
UVic Rob McPherson UVic/IPP GSC-19 Site Visit to UVic 13 October 2006  Physics  Very brief overview of the motivation for the LHC and ATLAS 
22 Oct 2001, M. LefebvreVisit of VPA, Dr J. Cassels1 Particle Physics Department of Physics and Astronomy Visit of Vice-President Academic Dr Jamie Cassels.
19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
Refurbished Booster RF John Reid October 24, 2012.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Vrije Universiteit amsterdam Milan, September 25, 2000 VELO System J.F.J. van den Brand LHCb Vertex Detector System: Status Report J.F.J. van den Brand.
CLAS12 Drift Chamber Prototyping
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Sponsored By: Freescale Sponsor: Kevin Kemp Faculty Advisor: William Stapleton Project # 1.3.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Dec
NUMI Update on Steel, Coils, Fixtures, and Prototyping J.K. Nelson 12/98 MINOS Meeting.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
Installation of the T600 at Fermilab Fermilab, February 15,
March 01 st, 2010 LAr sLHC Engineering – March 01 st, 2010 Prepared by Michel RAYMOND Follow up of the action list.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Installation of the T600 at Fermilab
Production at Victoria University of Victoria
Medium beta cryomodule demonstrator M-ECCTD
Teleconference ACS – FREIA 10th May 2017
SUPER - T6 (Short slide version)
Garage Parking Indicator
Preparation of Components for the Mounting of
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
ATLAS Canada Collaboration
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
X-ray Pump-Probe Instrument
Canadian National Railway
Prototype cryomodule development
Teleconference ACS – FREIA 19th June 2017
ATLAS Liquid Argon Calorimeter Signal Feedthroughs
East Hall under construction
Presentation transcript:

22 September 1998 LAr WeekM. Lefebvre Signal Feedthrough Progress Report Pin Carriers FEA Update Presented by Terry Hodges TRIUMF and University of Victoria British Columbia, Canada ATLAS LAr Week 22 September 98

22 September 1998 LAr WeekM. Lefebvre Pin Carrier Order for Prototypes at Victoria Glasseal 3 out of 20 received by Sept 15th 1998 all leak tested at room temperature Pacific Coast Technologies 9 out of 10 received by Sept 15th 1998 all leak tested at room temperature Reminder on Costs Glasseal 448 pins: US$ 1455 each for 20 + US$ 40 for Au 512 pins: US$ 1621 each for 20 + US$ 47 for Au 448 pins: US$ 593 each for pins: US$ 659 each for 500 PCT 448 pins: US$ 3872 each for 10 + US$ 1400 for Au 512 pins: US$ 3961 each for 10 + US$ 1400 for Au 448 pins: US$ 1997 each for US$ 200 for Au 512 pins: US$ 2027 each for US$ 200 for Au

22 September 1998 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Canadian Responsibilities Design Fabrication Signal Pigtails purchased from Orsay Low Voltage Pigtails purchased from MPI Commissioning Transport Assistance during installation: Cover the cost of an orbital cutter Assistance during welding on the cryostat Assistance for leak testing during installation DC Electrical tests during the installation

22 September 1998 LAr WeekM. Lefebvre Endcap Signal Feedthrough Team Paul Birney Senior Technologist, TRIUMF Leak test station Assembly tooling Margret Fincke Research Associate, Victoria Electric test station Vacuum cable development Terry Hodges Chief Engineer, TRIUMF Feedthrough unit design Finite element analysis Aaron Dowling Junior Technologist, Victoria Richard Keeler Faculty, Victoria Test stations Vacuum cable development Roy Langstaff Senior Draftsman, TRIUMF Feedthrough unit design Procurement issues Michel Lefebvre Faculty, Victoria Project leader Mark Lenckowski Draftsman, TRIUMF Ernie Neuheimer Research Scientist, CRPP Carleton Vacuum cable development Paul Poffenberger Production Manager, Victoria Leak test station Vacuum system Greg Vowles Junior Technologist, Victoria On a consultant basis: Randy Sobie Faculty, Victoria DAQ