1 Confidential PCR Process Change Request Mike Rizuto Supplier Development Technologist March 16, 2015 Rev 3.

Slides:



Advertisements
Similar presentations
BOS Supplier Mangement
Advertisements

PQR / PPAP GUIDE Teaching Aid Last Revised March 17, 2014 (SCARs are not addressed in this guide)
Teaching Aid Last Revised February 18, 2015
Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Copy Exact Training For SMC Suppliers
Global Supplier Quality Manual PPAP Requirements
PPAP Requirements Training
SESSION TWO SECURITY AND GROUP PERMISSIONS Security and Group Permissions.
First Article Inspection Report
ISO 9001 : 2000.
Overview of the Automated Supplier Change Notification System Last update: 08-Apr-2015.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
8-Aug-15 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this work.
First Article Inspection
Supplier Product & Process Change Request. Flow Diagram: Supplier Product & Process Changes Requests Change notification form completed by supplier then.
Indian Tender Offer Process. The Process May Be Intimidating But the Rewards Can Be High For Your Efforts.
From Research Prototype to Production
Requirements Engineering CSE-305 Requirements Engineering Process Tasks Lecture-5.
Supplier Change Request Portal
Rev 6.1.  Lack of collaboration is a major risk  Late engagement is a risk  How much is new?  How much time?  How many resources?  Design Collaboration.
OEM SCR Expectations in a Zero Defects Environment Leading Edge Ceramic and Tantalum Capacitors May 22-24, 2007 Perspectives from you Supply Base Automotive.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
QUALITY MANAGEMENT STATEMENT
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Supplier Capacity Worksheet User Instructions September 2015 Revised December 2, 2015.
Comparability Protocols Lore Fields MT(ASCP)SBB Consumer Safety Officer DBA/OBRR/CBER September 16, 2009.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
Suppliers without a Contract Purchase Order for Services.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
©© 2013 SAP AG. All rights reserved. Product Development Scenario Overview Open Legend Project Manager Scenario Description The following business roles.
UnionPay Card Manufacturer Certification Introduction.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
External Provider Control
Production Part Approval Process
Part Approval / Compliance Data Submission via Jotform.com
Engineering Change Request (ECR) Process Change Request (PCR)
Internal Auditor Training
First Article Inspection Reports (FAIRs) Instructions for Suppliers
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
Supplier Portal Self-Registration
Program Management Portal: Request Management, PCRs and the Client
Microsoft 365 powered device offers Execution Guidance
DSQR Training Supplier Quality Manual
Appearance Approval Report (AAR)
Part Approval / Compliance Data Submission via Jotform.com
ISO 9001 Awareness Training.
CDRL E003 CFAT REPORT TEMPLATE
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Product Development Scenario Overview
Supplier Request for Engineering Approval
SQA01 Guidance Material: FAI Review
Lockheed Martin Canada’s SMB Mentoring Program
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
RISK REDUCTION PROCESS
First Article Inspection
Production Part Approval Process
DMAIC STANDARD WORK TEMPLATE
AS 9100 Awareness Training.
Specialty Heat Treating, Inc. Internal Auditor Training
DMAIC STANDARD WORK TEMPLATE
SUPPLIER ELECTRONIC PCR TRAINING
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Presentation transcript:

1 Confidential PCR Process Change Request Mike Rizuto Supplier Development Technologist March 16, 2015 Rev 3

2 Confidential Overview We are at a supplier and we notice that one of the operations does not match the Control Plan. When the supplier is asked they state, “Yeah we used to run that operation on a vertical machining center but due to capacity constraints we moved it to our horizontal machining center. We haven’t updated the Control Plan yet.” “Really? I noticed the features have KPCs attributed to them have you established related Cpk values? Have you updated the Work Instructions? When did this change take place and was the process change PPAP’d through our PQR system?” Unfortunately the scenario above is not so uncommon. Suppliers not fully in tune with Polaris requirements do not know that most changes require a PPAP submission as defined by our PQR or at least a form of Polaris acknowledgement and approval. Most suppliers are not aware that unapproved changes put liability squarely with them. Once they are shown the PCR and approval by the customer removes the consequences from them to the customer they are usually very willing to comply (CYA). SQEs want to know that all processes are controlled including those of Tier I and II suppliers. Engineers want to know their prints and specifications are adhered to, Buyers cost opportunities realized and will review suggestions from the supplier which will enable that. Schedulers want to know if scheduled deliveries are going to be affected and Service Parts wants to know the gasket kits they purchased will continue to work with implemented changes. What does Polaris have which will communicate the above, route it and document the results? The PCR (Process Change Request) described in this presentation achieves those goals. Typically few know the processing capability of our supply base better than the SQE. SQEs have received training and related publications associated with PPAP implementation and have audited the supplier’s processes. It is usually the SQE who assists the supplier in understanding PQR/PPAP requirements. Who better to control the PCR process and subsequent PQR/PPAP submission? Rev 3

3 Confidential Rev 3

4 Confidential 1st Tab of the PCR Workbook Polaris Industries, Inc. must control the products and services provided by our supply base based on approved and validated products and processes. Polaris requires notification and right of approval of any proposed changes BEFORE implementing such change including rework which is done outside of the previously approved process (Control Plan/Flow Chart). Notification is achieved by completing and submitting, to the assigned Polaris Supplier Quality Engineer (SQE), a completed Process Change Request (PCR) spreadsheet. Changes as defined in the two tabs (When PCR is Req. & When PCR is Not Req.) includes but not limited to: material (purchased parts only), location of production, new or modified non-perishable tools, method of manufacture, subcontractor, services, drawings (revisions - purchased parts only), testing, inspection, or processing should require approval by Polaris Industries, Inc. Changes are not to take place without prior PCR acceptance. A PCR is a process change not a substitute for a Deviation Request or a Design Change Request (DCR). All requests associated with the Design Record will continue to be channeled through Deviations or DCRs. PCR’s shall be submitted through the supplier’s assigned Polaris Supplier Quality Engineer (SQE) or Supplier Development Engineer (SDE). To avoid delays in reviewing and approving include all supporting documentation such as timelines, drawings, photos, etc. the PCR should be as complete as possible when submitted. Accepted PCRs may require a Production Part Approval Process (PPAP) submission subject to the requirements noted on the PCR/PQR. When submitting PPAP’s based on PCR acceptance please include the approved PCR in element 2: Engineering Change Documents within your PQR/PPAP submission. An accepted PCR only grants permission to proceed with the change under the control of the supplier. Polaris PQR approval is required before any affected product is allowed to ship to Polaris. In the event this procedure is not properly followed Polaris will take appropriate actions needed to recover any costs associated with complications caused by unapproved changes to the products and services provided by suppliers. This will include, but not limited to, scrap, rework, production downtime, warranty, etc. If you have any questions feel free to contact your Polaris SQE or SDE. We appreciate your attention to this important matter.

5 Confidential 2nd Tab of the PCR Workbook Supplier completes white fields, Polaris completes grayed area of the cover sheet

6 Confidential Tabs of the PCR Workbook Subsequent tabs are used to support the change request. The more complete the data the faster the request is reviewed. The last tab “Polaris Notes” is where Polaris responses will be noted including content from reviewers.

7 Confidential Routing If the supplier is requesting only a process related change the PCR can be evaluated by the SQE/SDE or plant QE for dispositioning If the requested change may influence Design Record requirements or technical information the PCR should be routed to Engineering for approval If cost or delivery will be impacted then the Buyer and/or Scheduler should be included for approval Sometimes it is a good idea to consult with SMEs prior to approval Some changes may be internal to the product where Service Parts should be advised, i.e. internal seal kits Polaris will list names of internal personnel PCR is routed to for approval

8 Confidential Accepted/Rejected and PPAP Requirements If the PCR is accepted submission requirements noted here will match the PQR Note: If we accept the supplier is responsible for compliance and Polaris is responsible for the consequences of the change