2014-04-03 DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT-13-612 1 Breakthroughs in Applying Systems Engineering.

Slides:



Advertisements
Similar presentations
Global Congress Global Leadership Vision for Project Management.
Advertisements

1 Open PepsiCo 2009 Ian Noble R&D Director Foods Innovation.
Web Development Engineering Processes Introduction to Web Development Outsourcing Processes.
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
Space Technology Programs James Reuther Office of the Chief Technologist March 28, 2012 Office of the Chief Technologist.
Ohio Improvement Process (OIP) Your Local School District District Team Orientation Date Time.
Chris Reisig, Task Group Chairman December 17, 2009 NDIA EHM Committee EHM Technology Transition Study Report.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
A Navy Business Initiative Defense Daily OA Summit 12 November 2013 Nickolas H. Guertin, PE Director for Transformation DASN RDT&E
Chapter 10 Schedule Your Schedule. Copyright 2004 by Pearson Education, Inc. Identifying And Scheduling Tasks The schedule from the Software Development.
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
1 Perform Assess Policy and Guidance Acquisition Program Improvement Model Acquisition Programs Acquisition Workforce Human Capital Strategic Planning.
Iterative development and The Unified process
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
IS&T Project Management: How to Engage the Customer September 27, 2005.
The New Product and Services Development Process By SK Winning Innovations for Tomorrow (WIT)
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
What is Business Analysis Planning & Monitoring?
Developing Enterprise Architecture
Challenges Faced in Developing Audit Plans and Programs 21 st March, 2013.
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
CLEANROOM SOFTWARE ENGINEERING.
THE REGIONAL MUNICIPALITY OF YORK Information Technology Strategy & 5 Year Plan.
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
Best Practices in Defense Technology Development and Technology Maturity Assessments Systems & Software Technology Conference (SSTC) 28 April 2010.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
A Project ’ s Tale: Transitioning From SW-CMM to CMMI-SE/SW Warren Scheinin Systems Engineer, NG Mission Systems CMMI Technology Conference & User Group.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1 1 “Secure the High Ground” Jeff Craver Project Manager Space and Missile Defense Technical Center Jeff Craver Project Manager.
IRM304 CDR Course Manager: Denny Involved Competency Leads: 26 (Cybersecurity)-Denman, 19 (Measurement)-Denny, 7 (DBS)-Corcoran [Capability Planning],
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
Managing CMMI® as a Project
SWEN 5130 Requirements Engineering 1 Dr Jim Helm SWEN 5130 Requirements Engineering Requirements Management Under the CMM.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Quality Management.
Introduction to the Continual Service Improvement Toolkit Welcome.
The Value Driven Approach
Click to add text SUITE SEM Implementation Process Training.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 Managing New Product Introduction: Life Cycle Phases Team Members: Jhon Benavides Sabrina Patino Russ Watt June 5, 2009 Solar Plus.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Risk Community of Practice (CoP) Status from Defense Acquisition University (DAU) Project Risk Symposium 2004 May 04 By: John Driessnack
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
Continual Service Improvement Methods & Techniques.
Class-oriented metrics – Weighted methods per class, depth of the inheritance tree, number of children, coupling, response for class, lack of cohesion.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
CMMI Certification - By Global Certification Consultancy.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Mgt Project Portfolio Management and the PMO Module 8 - Fundamentals of the Program Management Office Dr. Alan C. Maltz Howe School of Technology.
MDD to Milestone A Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Technology Program Management Model (TPMM)
Milestone A to Milestone B Requirements Management Activities
Identify the Risk of Not Doing BA
Improving Mission Effectiveness By Exploiting the Command’s Implementation Of the DoD Enterprise Services Management Framework - DESMF in the [name the.
MDD to Milestone A Requirements Management Activities
Stage Gate Process Template
Presentation transcript:

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Breakthroughs in Applying Systems Engineering to Technology Development for International Council on Systems Engineering (INCOSE) Systems Engineering Conference in DC (SEDC) Ms. Melanie Klinner US Army Space and Missile Defense Command/ Army Forces Strategic Command Mr. Jeffrey Craver Defense Acquisition University Mr. Mike Ellis Senior Systems Engineer (Formerly with Intrepid)

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Overview Describe the problem space of managing the maturation of technology for transition from the perspective of the Program Manager, User, and the Technologist Provide an overview of the Technology Program Management Model (TPMM) solution set in terms of Processes, Systems Engineering, and Transition Management Describe the Breakthrough in terms of the Systems Engineering Module (SEM) that provides online implementation of TPMM Describe how the SEM exists within an S&T Enterprise and for the Management of Technology Programs/Portfolio’s/Project’s Describe how the DTRA TPMM Project has applied the model to improve current processes and add-value to the enterprise Provide the Way Forward and the extension of the TPMM process into the Technology Development Domain from Basic Research to Program Management. 2

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT The Problem 3 Fact: There are diminishing resources and belt tightening ongoing in DoD Unfortunate Reality: Warfighter Needs are increasing at a significant rate in an attempt to outpace an Asymmetric Threat

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Faced With this Reality, What Needs to Be Done? If we can't get adequate funding,  We need to make smarter choices in what to fund. If we can't build things faster,  We need to build them more efficiently with less re-work. If we can't afford the full set of performance,  We should focus on the highest priority needs. If we can't afford to fail,  We must effectively identify and manage the risk. Culture Change: Adopt a Stage-Gate Process in the Development Phase and Incorporate a Systems Engineering-Based Criteria Set for Assessing Technology Maturity 4

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Consistency in Technology Development Planning  Requirements definition and plans for maturity advancement are not developed consistently or effectively.  No common set of tools and standards to gauge technology maturity. Improve the rate for Transitioning of Technologies  Transition not always considered as a part of Technology Development  Limited Customer/User identification/involvement 5 Establish “a management methodology that balances the portfolio by Incorporating Discipline and Rigor through the use of clear, well-defined and Measurable Metrics!” J. Heusmann DTRA-J9 (7 May 09) Technology Development Challenges

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT USER Threat Driven Soldier-Proof Fieldable Meets Mission Needs DOTMLPFDOTMLPF I’m governed by the JCIDS Hey Buddy - I OWN The Requirements! I Want it All!! I Want it Cheap! I Want it Now! Gotta be small, lightweight, and 99.99% reliable PM Value Added Capability Probability of Success Acquisition Strategy Budget (LLC/POM) Schedule - WBS The System “ approach” My prime can do that!! Your next chance for funding is 5 years down the road – stud! I NEED a REQUIRMENT (CDD)! You forgot about the “illities”!!! I am governed by DoD S&T If you “Push” long enough – they will come! You don’t understand - This project is different from everyone else S&T does not require a process – I have been doing it for years Customer role is to integrate Technical “break- through” Performance Goals Risk Cost Estimate. Program Plan Build a prototype Perspectives 6 Budget???

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT TPMM Collaboration The TPMM Collaboration was formed to improve and expand the TPMM methodology and jointly develop a tool-based process intent on reducing the risk to technology development. DTRA DAU USASMDC 7

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Minimize the Risk in Misalignment

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT SMDC/DAU/DTRA Collaboration Project Breakthroughs A paradigm shift in Project and Portfolio Management has begun with the use of a SharePoint capability to : Plan Execute Communicate progress Assess technical maturity Manage risk A significant advance in the consistent SE product set (SE artifacts, metrics, Exit Criteria, & online SEM reports). Revolutionary changes to cultural norms evident by Increasing interest from (Senior-DoD) early-adopters to a software tool that can overcome resistance from the S&T community to apply SE principles. Enterprise Adoption facilitated by the pervasiveness of SharePoint throughout the DoD which allows for easy adoption and simplified IA requirement. DAU has recommended TPMM as a Systems Engineering best practice since DTRA Process Improvement effort has been recognized by AT&L Value Engineering Achievement Award. Best Practice

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Recipient of a USD(AT&L) 2012 Value Engineering Achievement Award 10 TPMM-based SharePoint Solution Application: Systems Engineering Module (SEM)

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT A TRL-Based, Stage Gate Model Designed for Technology Development and Transition Functions Performed by TPMM 11 Legend: TTA = Technology Transition Agreement TDS = Technology Development Strategy Program Definition oIdentify Activities to consider oIdentify Deliverable Documents oProvide guidance for Tailoring oEmploy “Best Practice” Tools oIdentify and Mitigate Risk Transition Management oTechnology Transition oTechnology Transfer oTechnology Marketing Maturity Assessments oEstablishes Entry/Exit Criteria oProvides a Framework for Technology Maturity Assessments (TMA)

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Systems Engineering in TPMM Systems Engineering principles are embodied in the activities and associated documentation in each stage of maturity development Lab Test Strategy IDD Updated Technology Development Strategy (TDS) Preliminary System Spec Updated TTA - Technology Transition Agreement (Intent) Update Tech Requirements Functionality Analysis Operational Prototype Validation Final TTA (Commitment) TDS/Acq Strategy Roadmap Final System Spec Manufacturing Plan Initial “-ilities” Plan Design Codes Exit Criteria Relevant Environment Test Design Risk Mitigation Strategy Brassboard Relevant Environment Test Results Interface Spec System Configuration formally controlled and documented “-ilities” Documented Breadboard Laboratory Test Results CTE Identification Integration & Qualification Decomposition & Design

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Tech Program Events Gates/TDP’s [With Sample Entry/Exit Criteria] 13

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Systems Engineering Module (SEM)

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Staff Meeting Review Graphic

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT TPMM Capabilities for Decision Support

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Way-Ahead Use Systems Engineering-Based (TPMM) process to change the culture: Balance Technology Portfolio’s so that Priorities are aligned to Mission Strategy and Customer Needs are clearly identified and understood Improve Project Management Performance in the areas of requirements traceability, system engineering rigor, transition focus, maturity assessment, and in planning/execution/reporting Exchange “informational” calendar-driven Project Technical Reviews with “decisional” event-driven Reviews where technical progress is examined "as-needed" in accordance with a Project’s Lifecycle Plan. Increase Successful Transition of Technology by engaging Early Systems Engineering and aligning with Acquisition Authorities. Promote consistency in technical interpretation of TRL Maturity levels throughout the DoD S&T Enterprise and with Program Managers. Extend SE-Based practices for use in SBIR and IRAD Programs by tailoring the TPMM as applicable to that purpose. 17

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT US Government Personnel can request a link to the TPMM Web Site at: Contact/Consultation Information Mr. Jeffrey Craver Defense Acquisition University South Region Huntsville, AL Ms. Melanie Klinner USASMDC/ARSTRAT TPMM Product Manager Technical Center/Cyberspace Technology Division Redstone Arsenal, Huntsville, AL Mr. Mike Ellis Systems Engineering Consultant (Formerly with Intrepid) Mr. Alan Barclay TPMM Industry Project Manager Intrepid 18

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT BACKUP 19

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT TPMM Capabilities for Decision Support

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Project Planning For Execution

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Prepare and Execute TRL Checklists

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT TPMM Capability Applicability Matrix

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Automatically Produce Project Quad

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Risk Drill-Down from Project Quad

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT TPMM Capability Applicability Matrix

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Portfolio Reports/Views Collaboration: Type Innovation: Type Performer:

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT TPMM Capability Applicability Matrix

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Portfolio Matrix Analysis

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT TPMM Capability Applicability Matrix

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Capability Needs Coverage Matrix TECH PORTFOLIO PROJECTREQUIREMENTS/CAPABILITY NEEDS Gaps NOT Covered Gaps Potentially Duplicated Gaps Partially Covered

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT TPMM Capability Applicability Matrix

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Staff Meeting Review Graphic

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT TPMM Capability Applicability Matrix

DISTRIBUTION A.: Approved for public release; distribution unlimited. SMDC #3139. DTRA #NT Project Gate Review Manager