The ARC 3.5 Meter Telescope The 2.5 Meter Sloan Telescope The 0.5 Meter ARCSAT Telescope The 1.0 Meter NMSU Telescope Apache Point Observatory Latitude.

Slides:



Advertisements
Similar presentations
WIYN Planning Meeting, February 28, 2013 Wisconsin, Indiana Yale, NOAO 0.9m Half Degree Imager – First Light.
Advertisements

OU & APO John Wisniewski Department of Physics & Astronomy University of Oklahoma APO 20 th Anniversary.
Jim Peterson October 13, 2007Swinburne Astronomy Online AstroFest 2007 A Brief History of the Astrophysical Research Consortium and the Apache Point Observatory.
Introduction By the 1950s, the biggest and best astronomy tools in the US were concentrated in a handful of universities. AURA national observatories.
Pisgah Astronomical Research Institute. Introduction  Pisgah Astronomical Research Institute (PARI) is  A public not-for-profit public foundation 
SPECTROSCOPY GROUP Photonics West February 3, 2013 Brian C. Smith, Ph.D.,Princeton Instruments Jason McClure, Ph.D. Princeton Instruments Dan Heller, Ph.D.
“Riding the Hub”: The MMT Adaptive Secondary Douglas Miller University of Arizona The AO System Current Performance of the MMT AO System Ongoing Development.
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
The SOAR Telescope MSU’s Laboratory for Astronomical Discovery.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
Data-Intensive Science (eScience) Ed Lazowska Bill & Melinda Gates Chair in Computer Science & Engineering University of Washington August 2011.
1 Aurélien Barrau LPSC-Grenoble (CNRS / UJF) A few words on the LPSC The LPSC in few words: The scientific environment : Grenoble 4 Universities.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
The Nearby Supernovae Factory: Spectrograph Calibration Ben Dilday Advisor: Rick Kessler, CfCP Physics 335 Autumn 2003.
ISSAT “Telescope Alpha” Richard Berry Astronomical League.
TMT Instrumentation Canadian capabilities and interests David Loop, NRC-HIA June 26, 2010.
Micro and Nano Characterization Facility
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
1 m – APOGEE Feed Jon Holtzman Diane Feuillet (NMSU)
Agile: A Time-Series CCD Photometer to Study Variables Anjum Mukadam, Russell Owen, Ed Mannery University of Washington, Seattle.
The evolution of ARC/3.5m Current ARC Partner Institutions University of Washington New Mexico State University Princeton University (until June 2014)
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
Conceptual Design Review Design Requirements The Systems Perspective Rob Hubbard Systems Engineering.
Fick Observatory - Boone, IA. Observatory Automation ongo02e March 26, 2002 Faculty advisor: Dr. John P. Basart Client: Joe Eitter ISU Physics Department.
1 1 AST Committee of Visitors February 2011 National Solar Observatory Overview Craig Foltz Program Officer NSO.
SDSS Supernova Survey Josh Frieman Fermilab and University of Chicago.
Big Bear Solar Observatory NST Main Features  All reflecting, off-axis Gregory optical configuration  PM: 1.6 m clear aperture with f/2.4  Figuring.
Sternberg Astronomical Institute of Lomonosov Moscow State University.
An Ultrafast Review: Decades of the 3.5 m Telescope 1960s: several of the eventual ARC members realize that the Palomar 200” and Lick 120” should not.
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
APO and the Adler Planetarium Mark Hammergren APO 20 th Anniversary Celebration May 13, poster.
1 Measurement, Integration and Test Section (376) Environmental Test Laboratory Group 3765 Themis Pre-Environmental Review 3/06.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
YunNan One Meter Infrared Solar Tower Jun Lin. Why is YNST? After Solar-B launch, what can we do by using of ground-based telescope ? Detailed chromosphere.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
SNAP Integration Model V. S14 The SNAP Integration Model Mechanical [ SC4 Breakout ] Robin Lafever LBNL Engineering.
is transparent ERAU Astronomical Observatory Meade inch Schmidt Cassegrain Reflecting Telescope.
Suggested Subaru-NAOJ/Princeton Consortium: Overview Michael Strauss, Ed Turner, Jim Gunn January 25, 2007.
Pg 1 Spherical Grating Spectrographs CALSYS Upgrade Darragh O’Donoghue Why? Unacceptably low light throughput resulting in loss of science time while getting.
The Case for a New CONCAM3 Robert J. Nemiroff for the CONCAM Collaboration.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
EScience: Techniques and Technologies for 21st Century Discovery Ed Lazowska Bill & Melinda Gates Chair in Computer Science & Engineering Computer Science.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Oxford Technologies Facilities Stephen Sanders
Incoming instruments. New instruments IMACS MOEMultiobject echellette LDSS upgradeMultiobject optical spectroscopy CorMASSLow-res visiting NIR spectrograph.
Robo-AO Overview: System, capabilities, performance Christoph Baranec (PI)
The APO 3.5m at UW Suzanne Hawley University of Washington Many scientific programs including: –chemical abundance studies (Wallerstein) –planetary nebulae.
Oct. 19, 2006V. Scarpine1 DES Posters to AAS 2007, Seattle 1.Brenna Flaugher – “The Dark Energy Survey instrument” 2.Tom Diehl – “Characterization and.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
York Laboratory Information Systems Restructuring Proposal IEM 5303 Term Paper Fall 2000 Chris M. Forth Senior Project Engineer York International.
AST3-NIR camera for the AST3-3 telescope for the Kunlun Infrared Sky Survey (KISS) Progress Meeting Jon Lawrence 14 August 2015.
Pg 1 15 September 2015 ACTR Meeting SOAR: Resources & Priorities Jay Elias.
Observatories: Local & Remote
Technical resources schedule
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Indian Astronomical Observatory
SOFIA — The Observatory
Keck Observatory Status
Facility Concept Design and Study
Need for the ATA SKA Development Facility
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
SLAC DOE Program Review
Launch and On-orbit Checkout
EVLA Operations Jim Ulvestad
Presentation transcript:

The ARC 3.5 Meter Telescope The 2.5 Meter Sloan Telescope The 0.5 Meter ARCSAT Telescope The 1.0 Meter NMSU Telescope Apache Point Observatory Latitude 32° 46' 49" N Longitude 105° 49' 13" W Elevation 9250 ft

Apache Point Observatory Now and Then May 2014May Telescopes (all operational)( 1 operational) 1 Lab Building1 Lab Building 3 Office Buildings1 Office Building 1 Machine Shop/Garage1 Shop/Garage 2 Dormitory Buildings (17 beds) 2 Dormitory Buildings (12 beds) 1 3 bedroom House Trailer1 NSO house rental 10,000 sq ft storage rented

Apache Point Observatory Staff Now and Then (does not include ARC/SDSS institutional support) May 2014May Administration2 Administration 2 Programming - IT1 Programming - IT 6 Engineering1 Engineering 4 Technicians1 Observer 14 Observers (8 PhD’s ) 5 Total Staff 29 Total staff (includes SDSS) 29 Includes SDSS staff

The ARC 3.5 Meter Telescope

ARC 3.5m Telescope Now and Then Last Year (2013)First Year of Operation (94/95) Observing hours Scheduled : 4047 hours2850 hours Observed : 2796 hours1585 hours Equip loss : 29 hours 275 hours Engineering : 310 hours 395 hours Instrument Suite DIS, ARCES, SPICam, NICFPS, Agile, TSpec, GIFS DSC, GRIM, DIS* (ARCTIC in Development) + 4 guide cameras, wavefront sensor, engineering camera and APOLLO

ARC 3.5m Telescope (2) Now and Then Last Year (2013) First Year of Operation (94/95) Image Quality Visible : Median 1.1” Best 0.6”Median 1.7” Best 1.1” NIR:Median 1.0” Best 0.5”Median 1.4” Best 0.9” 3.5m Staff 8.5 FTE external7 FTEs + 2 external Operations Budget (2014 Dollars) $1,160,000 $656,707 ($415 per Obs Hour) ($416 per Obs Hour)

ARC 3.5m Telescope Staff Mark Klaene – APO Site Manager Bill Ketzeback – 3.5m Chief Telescope Engineer Gretchen Van Doren – Program Manager Fritz Stauffer, Jon Brinkmann – Software Engineers Ed Leon – Electronics Technologist Ben Harris – Facilities Supervisor Russet McMillan – 3.5m Night Ops Mgr, Telescope Scheduler Jack Dembicky, Alaina Bradley, Alysha Shugart – Observing Specialists Remote (at U. Washington) Russell Owen, Conor Sayres – Software Engineers Nick MacDonald, Joe Huehnerhoff – Mechanical Engineers

ARC 3.5m Telescope Improvements There have been numerous improvements and additions over the past two decades. See poster in back of room for details! Major improvement projects New Graphical Telescope User Interface (TUI) Modern Axis Control System New Direct Drive Motors on all axes New Mirror Support, Control and Actuators New Light Baffles New Top End Assembly New Telescope Control System software (in progress)

ARC 3.5m Instruments Dual Imaging Spectrograph (DIS, Princeton, Jim Gunn) ARC Echelle Spectrograph (ARCES, Chicago, Don York) Optical Imaging Camera (SPICam, Washington, Chris Stubbs) NIR Imaging Camera (NICFPS, Colorado, John Bally) High Speed Imaging Camera (Agile, Washington, Anjum Mukadam) Triplespec NIR Spectrograph (TSpec, Virginia, Mike Skrutskie) Goddard Integral Field Spectrograph (GIFS, NASA/GSFC, Bruce Woodgate/Michael McElwain) ARC Telescope Imaging Camera under development (ARCTIC, APO, Joe Huehnerhoff/Bill Ketzeback)

ARC Small Aperture Telescope (ARCSAT, 0.5m) Originally from JHU for SDSS photometric calibrations Upgrade project just completed, led by APO staff Joe Huehnerhoff and Bill Ketzeback. Now in shared-risk operations with remote user interface, two imaging cameras High interest and usage from ARC partners!