Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
E Huedem, Nov ILC VALUE ENGINEERING SESSION of POWER & COOLING (Focus on Main Shaft 7) November 27, 2007 INFORMATION PHASE Conventional.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
ILC Energy Efficiency Marc Ross and Ewan Paterson, SLAC CFS-ADI Joint Meeting ICEPP University of Tokyo 9 April 2014 Three examples: 1) higher quality.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
August 11, 2011 FNAL Meeting Global Design Effort 1 DR-CFS Discussion Mark Palmer GDE.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
E Huedem, June RDR PROCESS WATER & VALUE ENGINEERING ITEMS June 5, 2008 GDE Meeting-ILC CFS Workshop in Dubna, Russia Emil Huedem, Fermilab.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facilities and Siting Global Group (ARCFS)
Installation Global System
Conventional Facility & Siting (CF&S) Overview for the Positron Source
CFS EDR KICK OFF MEETING Process Water August 23, 2007
Americas KlyCluster Cost Analysis Overview
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
Tom Lackowski Revised 10/12/2011
Presentation transcript:

Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne, Vic Kuchler Jerry Aarons, Clay Corvin, Emil Huedem, Lee Hammond, Maurice Ball, Tanaka Masami, Fred Asiri

DR-KOM-CFS 2 Nov. 07 RDR General Layout

DR-KOM-CFS 3 Nov. 07 RDR Baseline Damping Rings are an integral part of the Central Area Shaft and Cavern

DR-KOM-CFS 4 Nov. 07 Underground Structures Allocation Scheme

DR-KOM-CFS 5 Nov. 07 RDR Cost Overview Damping Ring Cost Distribution Americas Cost Distribution

DR-KOM-CFS 6 Nov. 07 DR Underground Structures

DR-KOM-CFS 7 Nov. 07 RDR TUNNEL SECTIONS

DR-KOM-CFS 8 Nov. 07 Injection / Extraction

DR-KOM-CFS 9 Nov. 07 Items Included in Civil Engineering for DR

DR-KOM-CFS 10 Nov. 07 Cont.

DR-KOM-CFS 11 Nov. 07 In RDR, this system at Shaft 7 serving ML, is what we used In RDR, we used simplified distribution by Area System RDR Surface Water Plant locations

DR-KOM-CFS 12 Nov. 07 RDR Process Water- WBS in Schematic x 26 skids x 26 qty Water Plant at Shaft 7

DR-KOM-CFS 13 Nov. 07 x 26 skids x 26 qty LCW SKID Ignore the size NO process RDR Process Water- WBS in Schematic

DR-KOM-CFS 14 Nov. 07 Process Water for DR (includes LCW and chilled water) Cost is (partially) scaled from ML shaft 7, using only total KW heat load to air/water. Cost scaling is adjusted to reflect air-cooled chillers used for damping ring area (No cooling tower/pump/tower piping for chillers) Cost scaling is adjusted to reflect no cavern HX/pump for chilled water. Chilled water fancoils located in the cavern. No chilled water fancoils in the tunnel. Chilled water piping scaled using length of cavern. Cost scaling is adjusted to reflect no cavern HX/pump for process water. Model used large LCW skid is at the shaft cavern. Its HX/pump also is for static pressure break. Cost scaling is adjusted to reflect no process water piping (similar to ML). Model used LCW is distributed from cavern to the tunnel. Cost scaling is not used for LCW distribution. Costed separately based on some assumptions (see next few slides) Used Oct heat load from A.Wolski, no updates since then (expected to have large change in loads to air)

DR-KOM-CFS 15 Nov. 07 Load to air in alcove is handled by large chilled water airhandler Load to air in tunnel is handled by large numbers of fancoils rejected to 90F LCW (placeholder, there will be less load to air). Fancoil cost is in air treatment. Air system can pick up about 400 KW total in tunnel or about 60W/m (~if allowed 30delta T air). Not considered in costing. Ignored heat absorption to rock Tunnel air is about 104F?? LCW is 95Fsupply and 115 F insulation return. alcove air at bottom of shaft is about 75 to 80F Include Fluorinert LCW skid to handle kickers (wag on cost, Maurice Ball, FNAL) used vendor’s preliminary fancoil selection using 90F water, 104 F Air in, each handles 3.5 ton at this condition (placeholder)

DR-KOM-CFS 16 Nov. 07 Items Included in Air Treatment and Process Water for DR COST PER METER USED EACH LINE SCALED FROM SHAFT 7

DR-KOM-CFS 17 Nov. 07 RDR Process Water: Heat Load Basis- Total Loads Snapshot Nov

DR-KOM-CFS 18 Nov. 07 The whole DR cooling is a placeholder and partially scaled from ML. here is the load used and concept

DR-KOM-CFS 19 Nov. 07 ½ Damping Ring LCW Shaft Cavern

DR-KOM-CFS 20 Nov. 07 Discussed at Fermilab Tunnel air temperature =below 90F, preferred 85F (due mainly to survey/alignment work? and laser tracker do not operate reliably over 90F) This means chiller needed to cool portion of the process/LCW water. It is assume the ambient will become the average of the LCW supply/return temperature. (see item 5 below) air stability C (over ???? Hrs) We don’t know the relative cost to maintain this but it expensive both first cost and operationally (air system reheat will be needed) The existing model of using LCW cooled fancoils (without reheat) can help trim space temperature to ( but at less stability of + - ????C over 24 hrs) or 0.2 C LCW supply temperature stability (the requirement is at one point ) near pump/skid at Is This doable (Maurice to confirm)?????? Need constant fresh air ventilation to remove tunnel ozone that will eat away cabling, 1mph is acceptable. This is doable in current scheme (that is neutral, conditioned. Dehumidified air will be injected in one shaft and out the other shaft at 1mph air speed. Supply LCW at 70F, return at 105F, average 85F, 30 F (average) water delta T Same as item 1, chiller will be needed to partly cool process/LCW water (cost of chiller, but less pipe cost due to higher delta T) Humidity (no specific numbers given) Assume there will be no minimum humidity??? Power supply in the alcove (with no shaft) will be LCW cooled This is needed, so as not to run separate chilled water main to the other shaft cables/bus will be water cooled

DR-KOM-CFS 21 Nov. 07 CFS Needs Heat Loads (water and air), agreed upon average delta T, pressure drop (average?), and locations (or relative locations) of the components. There is an upward sign for the cost impact for temperature control for the water and air systems as discussed at Fermilab.

DR-KOM-CFS 22 Nov. 07 Generic Approach for EDR General Approach - Based on a Sound System Engineering Management Approach Functional Requirements Identification –Defining physics requirement to engineering requirements –Defining boundaries, interfaces, utility needs and functional environment for each major components Design Configuration Control Management Optimization Studies –Design Alternatives Trade-Offs –Trade Studies –Constructability Studies –Value Engineering Study

DR-KOM-CFS 23 Nov. 07 Tentative CF&S- EDR Plan Generic Goal: –To Provide Facility Design that Meets Requirements at the Lowest Cost Conventional Facility Global: –To provide general conventional facility design and planning support and the development of cost estimates for the ILC EDR. Elaborated Activities for Work Packages Review and adapt civil engineering requirements Design development works Verify unit costs Cost estimates Time Schedules EDR writing

DR-KOM-CFS 24 Nov. 07 Establish A “Dimensional Envelope” Needs for Each major component of DR system for during;Establish A “Dimensional Envelope” Needs for Each major component of DR system for during; InstallationInstallation CommissioningCommissioning OperationOperation MaintenanceMaintenance “Dimensional Envelope” Should Include all Supporting Utility as well as Functional Environment Requirements“Dimensional Envelope” Should Include all Supporting Utility as well as Functional Environment Requirements Exiting Requirements Need to be Revisited from Installation, Maintenance and Operation Point of ViewExiting Requirements Need to be Revisited from Installation, Maintenance and Operation Point of View Identification of Clear Boundaries Between CFS and Each Major Components Needs to be clearly IdentifiedIdentification of Clear Boundaries Between CFS and Each Major Components Needs to be clearly Identified Evolving Constraints and CriteriaEvolving Constraints and Criteria –Life Safety Egress Requirements –Construction Configuration Requirements –Operational Configuration Requirements Tentative EDR Plan for DR

DR-KOM-CFS 25 Nov. 07 Deliverables The CF&S will not package deliverables to the Damping Rings. The design drawings, reports, EDR write-up and cost estimates will be provided for information similar to what we did for the RDR. Many of the CF&F efforts for the Damping Rings will be accomplished as part of the overall design efforts…..Life Safety Studies, Option Studies, Excavation Cost Models Where warranted specific designs for the Damping Rings will be made…..Power and Cooling

DR-KOM-CFS 26 Nov. 07 Planned Activities and Products Life Safety Study –Confirm that two shafts are adequate –Verify that second exit path required or if “Refuge Areas” will be acceptable. Studies –Near Surface Central Region –Value Management (Will focus on Power and Cooling) Engineering Designs

DR-KOM-CFS 27 Nov. 07 Preliminary Drawing List –Civil Composite Plans at Shaft Cavern, Service Alcoves, RF Straight, Typical Arc, Injection and Extraction Areas. Composite Cross Sections Plans at Surface Campus. –Electrical Single line electrical for medium voltage distribution. Typical Lighting and Power Plan –Process Water / Air Treatment Criteria Drawings Schematic Diagrams

DR-KOM-CFS 28 Nov. 07 Conclusion The RDR cost estimate included a factor to account for the immaturity of the design. We need to develop our understanding of the requirements so that the EDR will not require the inclusion of this factor. –Point on Contact –Fostering of formal and informal lines of communications –Reviews and feedback