Conclave on India –Africa Project Partnership FINANCING OF BIOMASS POWER PROJECTS - EXPERIENCE OF IREDA B. Venkateswara Rao G M (TS), IREDA

Slides:



Advertisements
Similar presentations
Pakistans Power Sector Need for Reforms By Kalim A. Siddiqui President-Petroleum Marketing Byco Petroleum Paksitan Limited 4 th International Power Generation.
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Ministry of New & Renewable Energy B- 14, CGO Complex, Lodhi Road New Delhi Biomass Power in India – An Overview by VK JAIN Director & NPC Ministry.
Subsidised Studies – BOOTs and All Mark Berger – Director E+PC Engineering & Projects Company Limited South Africa Canada – South Africa Chamber of Business.
1 Presentation on Investment Opportunities in Indian Power Sector and Cooperation with IEA By R.V. SHAHI Secretary, Ministry of Power Government of India.
Dairy Entrepreneurship Development Scheme (DEDS).
Power for All by 2012 We Create Possibility of a Better Tomorrow November 25, 2014 Financing Renewable Energy Projects by PFC.
1 Growth of Micro, Small & Medium Enterprises in India.
Wind Energy – H.R Scenario KIIT University 27 th Nov 2013 KIIT University 27 th Nov
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Mr. Phuong Hoang Kim Energy Efficiency Office Ministry of Industry REVIEW OF VIETNAM ENERGY EFFICIENCY & CONSERVATION POLICY.
Donors’ Conference on Sustainable Energy for Kosovo
Hydropower Development: Experience of Nepal
1 Framework Required to Ensure Long-term Sustainability - Environmental and Socio- cultural concerns.
Indian Renewable Energy Development Agency Ltd. April 26, MNRE’s Solar Off-Grid Scheme May 6, Solar Off-Grid Scheme Scheme of MNRE for Promotion.
Promoting Energy Efficiency In Buildings in Developing countries.
Renewable Energy in Africa: UNEP’s Initiatives Climate Change Kiosk, UNEP Event, COP12/MOP2 Sami Kamel, UNEP RISOE Centre Nairobi, Kenya November 17t h,
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
E NERGY, E NVIRONMENT AND S USTAINABILITY Gaurav Shukla CUTS International.
China Thermal Power Efficiency Project WB support to the improvement of coal-fired power generation efficiency in China Jie Tang Energy Specialist East.
Feed-in Legislation World Future Council Nairobi 2006 Miguel Mendonca The world’s most effective environmental policy?
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Lakshman Wijeyewardena Director General Industrial Services Bureau Role of Business Development Service Providers – Implementation of Technology.
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy March 2005.
Renewable Energy Scenario in Gujarat R. N. Pandya, Sr. Project Executive Gujarat Energy Development Agency Gandhinagar.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
Chinese TAIPEI 1 Private Sector Activities in Domestic New and Renewable Energy Technologies in Chinese Taipei Asia-Pacific Economic Cooperation (APEC)
The Opportunities for Green Investment. Role Mission: “ To stimulate, facilitate, and promote investment opportunities for foreign and local investors.
OPPORTUNITIES AND CHALLENGES OF POLICY AND REGULATORY REFORMS IN THE POWER SECTOR IN UGANDA (Cogeneration Development and the Private Forestry Sector Participation.
EIB and the energy sector financing Krzysztof Szyszko Warsaw, 23 rd November 2005.
GEF UNFCCC Asia & Pacific Regional Workshop on Transfer of Technology 17 January 2000, Cebu, Philippines Johan Wide, GEF Secretariat.
KPGM-TiE Report.  Availability of finance. unavailability of easy and sufficient finances.  Policy framework from Government. Bureaucracy, Corruption,
Imran Ahmad Additional Director Infrastructure, Housing & SME Finance Department State Bank of Pakistan.
1 Priority Energy Initiatives for Tanzania Developed by the Tanzanian Delegation at an EU Energy Initiative Workshop in Maputo April 2005.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
Union SME Financing – Is it Really a …. ?. SME Definition (SBP) Type of Business a) Fixed Assets Excluding Land & Building (Rs.M) b) Employment.
[Legislative] [American policy] Passing of the Public Utility Regulatory Policies Act (PURPA) in Introduced competition within the supply sector.
1 RENEWABLE ENERGY MARKET TRANSFORMATION PROJECT.
Biofuels at the level of the Common Market for Eastern and Southern Africa (COMESA) Presented to First High Level Biofuels Seminar in Africa Addis Ababa,
1 Synergies Between Climate Change Financing Mechanisms: Options for China The PCF/CC Synergy Workshop.
Energy Conclave 2006 Presentation by Debashish Majumdar, Managing Director Indian Renewable Energy Development Agency Limited New Delhi July 27, 2006 Implementing.
Can Financial Innovation Promote Energy Efficiency? An Impact Analysis for China November 13, 2009 Hiroyuki Hatashima Independent Evaluation Group-IFC.
Financing Guidelines of IREDA.  Incorporated on March 11, 1987 as a Public Limited Government Company  Administrative Ministry - Ministry of Non- Conventional.
CAI-Asia is building an air quality management community in Asia Investment Implications of the Action Plan Sustainable Urban.
Markets, Barriers and Opportunities for Renewable Energy in APEC Economies Lydia La Ferla Energy & Security Group May 14, 2004.
RENEWABLE ENERGY POTENTIAL IN INDIA
B.V. Rao GM,IREDA 21 st September 2010, Hotel Lalit, New Delhi Conference on Solar Energy Institutional Finance for Solar Projects.
1 Per capita Energy Consumption National Energy Policy Declaration 1. Providing Basic Energy Needs 2. Ensuring Energy Security 3. Promoting Energy.
Suzlon Energy Ltd 1 Clean Technology Opportunities in India -Chintan Shah Suzlon Energy Ltd 30 th March, 2016.
Eng Salma Hussien Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy Plan.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Seite 1 Seite Seite 1 Renewable Energy & Efficiency Energy open the pathway to affordable sustainable energy Presentation by Dr.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Supporting Scaled Up Private Investments in Clean Energy Infrastructure. Washington, D.C., October 6&7, 2014.
Energy Efficiency Opportunities for Manufacturing Industries
UNDP Social Good Summit Sustainable Development Goal#7 Ensure access to affordable reliable sustainable and modern energy sector for all Local Challenges.
IREDA Workshop on PMS/PRP at Visakhapatnam
Financing of solar power projects Presentation by Abhilakh singh general Manager ireda 28th July, 2016.
Engaging the private sector
by Imran Ahmad Additional Director, State Bank of Pakistan
Financing of Solar power plants
Challenges in Financing Renewable Energy
EU-RUSSIA Cooperation in Energy Efficiency
Rural Partnerships between Small Farmers and Private Sector
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Overview of Energy efficiency sector
Presentation transcript:

Conclave on India –Africa Project Partnership FINANCING OF BIOMASS POWER PROJECTS - EXPERIENCE OF IREDA B. Venkateswara Rao G M (TS), IREDA Hotel Taj Place, New Delhi

Power Scenario in India Total Installed Power Capacity – 1,87,000 MW (as on ) Per Capita Consumption – 779 units RE Installed Capacity – 23,000 MW Share of RE in Installed Capacity – 12% Share of RE in Power Generation– 3.5% Annual CO2 Emissions Contribution– 3 rd Largest Energy Generation (p.a.)– 727 bn kWh (till Jan’12) Supply Demand Gap – 13.8 % Peak – 10.9 % Energy Access to Electricity (Rural) – 43% households Target for Capacity Addition during XI Plan ( 2007 – 2012) : MW Energy for Ever

Power Sector at a Glance Thermal 1,23,758 Hydro 38,848 Renewable 20,162 Nuclear 4780 Total Installed Capacity : 1,87,000 MW Renewable Energy accounts 31.5% of the installed capacity in India

P OTENTIAL & A CHIEVEMENTS OF RE IN I NDIA SectorApprox. Potential (MW) Cumulative up to (MW)% Achieved Wind % Small Hydro % Bagasse Cogeneration % Biomass % Waste to Energy % Solar Power4-7 kWh/Sq.M/Day) Total Energy for Ever

Drivers for developing RE & EEC Renewable EnergyEnergy efficiency Rising energy demandCompetitive Advantage Energy securityLegislative Mandate Access to energyBottom Line Climate changeRising Energy Costs Energy for Ever

About IREDA INCEPTION Incorporated under the Companies Act on 11th March, 1987 to promote, develop and extend financial assistance for Renewable Energy and Energy Efficiency/ Conservation Projects. OBJECTIVE Extend financial support to Renewable Energy, Energy Efficiency & Conservation projects MOTTO Energy For Ever Energy for Ever

Highlights Dedicated FI for RE Financing – Unique in the World Specialized knowledge of RE / EE sector Recognized internationally – High Brand Equity All Multilaterals/ Bilateral prefer working with IREDA Leader in the sector Profit earning & dividend paying Rated Excellent for FY , FY NBFC as per RBI Classification ISO 9001:2000 Certified Company Energy for Ever

Cumulative Performance No. of Projects :2012 Loan Sanctions:Rs Cr Loan Disbursements:Rs Cr Sanctioned Power Capacity: 6280 MW Commissioned Capacity: 2200 MW(approx.) As on Energy for Ever

Impact of IREDA funded projects Created awareness in the country. Encouraged entry of private sector investments in RE sector. Catalyzed market development by showcasing success stories - encouraging other lenders to support the sector. Helped in creating manufacturing, design & engineering, operation and maintenance capabilities. Encouraged several states to declare policies and incentives to encourage private investments in RE sector. Assisted in policy shift from technology demonstration to commercialization making RE development demand driven. Helped in creating direct and indirect employment generation, economic development and improving living conditions. Energy for Ever

RESOURCE BASE ( Rs. in crores ) Authorized Share Capital Paid up Capital Net Worth Domestic Borrowings International Borrowings As on date Energy for Ever

SECTORS BEING FINANCED Sectors being financed:  Wind  Small & Medium Hydro  Biomass Power & Cogeneration  Solar  Waste to Energy  EE & Conservation  Bio Fuels/ Alternate Fuels Other Activities  Intermediary for providing financing facilities for various MNRE Schemes.  Implementing Agency for GBI Scheme – Wind & Solar Energy for Ever

F INANCING S CHEMES  Project Financing Schemes  Equipment Financing Schemes  Financing Through Intermediaries Quantum of Assistance - Upto 70% of Project Cost Rate of Interest % to 12.75% Repayment Period - Upto 13 Years Energy for Ever

12th PLAN OUTLAY ( )- IREDA Energy for Ever Physical Target:4769 MW Loan Sanctions: $US 4363 Million Disbursement: $US Million

IREDA - GRID CONNECTED BIOMASS ENERGY PROGRAMMES JBiomass Cogeneration & Industrial Cogeneration (including sugar Industry) J Biomass Power Generation (Direct Combustion mode up to 10 MW) JBiomass Gasification/Bio-gas (through Biomethanation) Energy for Ever

OBJECTIVES BIOMASS /COGENERATION SECTOR(Including Sugar Industry) Market Development Programme To provide financial assistance to the developers to set up the projects which have techno-economic viability. Adoption of high efficiency Co-Gen scheme. To facilitate development of indigenous capability and capacity for high efficient cogeneration plant. Energy for Ever

Biomass / Cogeneration (Including Sugar Industry) Market Development Programme OUTLINE OF THE SCHEME  Eligible capacity of Biomass plant – 10MW & below.  The minimum steam pressure 63 kg/cm2.  Use of high energy efficient equipment in Sugar / Paper mills.  Minimum size of sugar plant should be 2500 TCD, to establish Co- Gen plant.

IREDA’ S CONTRIBUTION IN FINANCING BIOMASS /BAGASSE BASED COGENERATION (A S ON ) Energy for Ever ParticularsCOGENERATIONBiomass Power No of projects5142 Cumulative sanctionsRs Crores ($US 501 Million) Rs Crores ( $US 168 Million) Cumulative disbursements Rs Crores ( $US 273 Million) Rs crores ( $US Million) Sanctioned Capacity919.6 MW MW Commissioned Capacity601 MW MW

IREDA’S FINANCING NORMS BIOMASS /BAGASSE BASED COGENERATION SECTOR  Debt Instruments -Project Financing Schemes  Quantum of assistance - Up to 70% of Project Cost ( 90% In case of SDF supported projects- Existing and Profit making for last 3 years)  Rate of Interest % to 13.25% and % to % for Biomass Power & Cogen Sec. depending on credit risk rating grade  Moratorium (Max) - Up to 3 Years  Repayment period - Up to 10 Years after moratorium  Minimum Promoter’s - 30% of the Project Cost Contribution Energy for Ever

SPECIFIC ADVANTAGES with IREDA over Other FI/Banks JRepayment period 10 years with grace period of 1 year after commissioning JImplementation period of 3 years JQuantum of Assistance is up to 70%-90% ( for SDF supported projects) JKnowledge/ Experience sharing with respect to best process of Project Implementation including Technical Guidance. Energy for Ever

L ESSONS LEARNT IN FINANCING B IOMASS / B AGASSE BASED COGENERATION P ROJECTS

L ESSONS LEARNT IN FINANCING B IOMASS / B AGASSE BASED COGENERATION P ROJECTS BY IREDA POLICY/ REGULATRY:  Absence of consistant and long term policy at state level.  Non uniform tariff without linking to fuel prices/ supply position.  Non availability of strong grid / evacuation facilities.  Mismatch between capacity of biomass power plant and realistic fuel supply position.

L ESSONS LEARNT IN FINANCING B IOMASS / B AGASSE BASED COGENERATION P ROJECTS BY IREDA TECHNICAL:  Improper assessment of biomass resources without considering likely competition uses.  Non availability of consistent quality of adequate biomass  Vide fluctuation in fuel cost in relation to seasons.  Lack of proper fuel handling/transportation facilities.  High plant down time due to frequent break down of boilers/turbines.  Frequent power tripping/fluctuations in rural areas.  Limited availability of qualified technical manpower for operations.  Improper assessment of characteristics of biomass fuels leading to lower PLF.

FINANCIAL:  Limited accessibility of working capital for biomass procurement.  Non availability of low cost funding  Lack of information exchange on operational performance of biomass projects amongst FIs/Banks  Improper operation of Trust and Retention Account by the promoters/likely diversion of funds L ESSONS LEARNT IN FINANCING B IOMASS / B AGASSE BASED COGENERATION P ROJECTS BY IREDA

MANAGERIAL:  Inadequate experience of developers in management of power plants.  Low capacity to raise equity/working capital in time.  Improper long term planning on biomass procurement.  Non implementation of new methods/techniques in biomass collection/storage/handling systems  Mismanagement of funds. L ESSONS LEARNT IN FINANCING B IOMASS / B AGASSE BASED COGENERATION P ROJECTS BY IREDA

GENERAL:  Delays in conversion of land from agriculture to non- agriculture.  Absence of single window clearances in many States.  Delays in getting approvals from Banks/FIs and State Agencies.  Lack of professional management with promoters. L ESSONS LEARNT IN FINANCING B IOMASS / B AGASSE BASED COGENERATION P ROJECTS BY IREDA

SUGGESTIONS FOR REMOVAL OF BARRIERS / RISKS IN DEVELOPMENT/ FINANCING OF BIOMASS POWER  To announce long term consistent policy for biomass power development at both central and state levels  To conduct detailed survey on realistic biomass availability and restrict new project licenses based on practical fuel supply position.  To provide single window clearance at state level to reduce project implementation delays.  To strengthen the existing grid and to provide proper evacuation facilities.  To fix biomass power tariff linked to increase in fuel costs.

SUGGESTIONS FOR REMOVAL OF BARRIERS / RISKS  To encourage biomass plantation to supplement the existing fuel sources.  To consider realistic Capital cost based on the cost of equipment for fuel preparation/transportation.  To provide low cost funds for biomass sector through national and international agencies.  Need to provide adequate working capital from the Banks.  Frequent exchange of information from Banks and FIs on biomass power plants performance.  Need for proper assessment of promoters capability to raise adequate WC..

SUGGESTIONS FOR REMOVAL OF BARRIERS / RISKS  To consider financial support for fuel procurement, transportation equipments with latest technology.  To encourage setting up of fuel depots and transportation systems as business entity.  Strict monitoring of TRA accounts to avoid mismanagement of funds.  To take up capacity building programme to train manpower.

SUGGESTIONS FOR REMOVAL OF BARRIERS / RISKS  To assess the realastic potential for cogeneration in existing sugar mills under expansion and also under the cooperative sectors.  To insist on Energy Conservation practices in biomass power plants.  To encourage biomass gasifiers on off-grid mode based on the local resources on entrepreneurship basis.

W AY FORWARD FOR BIOMASS P OWER DEVELOPMENT Energy for Ever  Development of organized market for biomass energy resources.  Level Playing ground ( implicit environmental subsidy allowed to fossil fuels).  Increasing realization among policy makers about positive externalities for biomass to make inroads into energy market.  Reliability and cost competitiveness of Modern Biomass technologies.  New financing models for funding cogen in cooperative sugar plants ( state government/ private)

Name of the Project: M/s. Renuka Sugars Ltd. Sector: Cogeneration Capacity: 30 MW Project Cost: Rs Lakhs Loan Amount: Rs Lakhs Status: Commissioned

Name of the Project: M/s. Dhanalakshmi : Srinivasan sugars Ltd Sector: Cogeneration Capacity: 23 MW Project Cost: Rs Lakhs Loan Amount: Rs.7980 Lakhs Status: Commissioned

Name of the Project: M/s Ind-Barath Bio Energy Ltd Sector: Biomass Power Capacity: 6 MW Project Cost: Rs 2440 Lakhs Loan Amount: Rs 1827 Lakhs Status: Commissioned

Name of the Project: AA Energy Ltd. Sector: Biomass Power Capacity: 10 MW Project Cost: Rs 4650 Lakhs Loan Amount: Rs 1625 Lakhs (50%) Status : Commissioned

B IOMASS P LANTATION

THANK YOU