Strategic Process Engineering Liquid Treatment Processes at the Blue Plains Advanced Wastewater Treatment Plant Tier 1 Workshop Blue Plains Users October.

Slides:



Advertisements
Similar presentations
Accommodating CSO Flows /Loadings in the Chesapeake Bay Nutrient TMDL
Advertisements

creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Sewage and Effluent Treatment 2-4 November 2002 Seán Moran -The first few slides.
Nutrient Issues at the Blue Plains WWTP February 2004.
Anne Arundel County Department of Public Works
w-fn005 1 Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008.
Water Quality Trading Claire Schary Water Quality Trading Coordinator U.S. Environmental Protection Agency, Region 10, Seattle, WA Region 10, Seattle,
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 17, 2012 DC WATER Hosted by: DBIA-MAR Monthly Luncheon Water Wastewater.
Community Water Supply Resources Implementation Strategy Lane Auditorium Albemarle County Office Building September 13, 2007.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
Nutrient Trading Framework in the Coosa Basin April 22, 2015.
Update on the District of Columbia’s Watershed Implementation Plan (WIP) for the Chesapeake Bay Total Maximum Daily Load (TMDL) November 18, 2010.
Wastewater generation
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion.
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
Tom Singleton Associate VP, Director, Integrated Water Resources an Atkins company Linking TMDLs & Environmental Restoration.
Update on Chesapeake Bay Issues Presentation to the Chesapeake Bay and Water Resources Policy Committee July 17, 2009 Ted Graham & Steve Bieber COG Department.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Biosolids Management Program Update Briefing for Environmental Quality and Operations Committee July 19, 2007 Briefing for Environmental Quality and Operations.
 MT DEQ PARTNERING WITH LOCAL COMMUNITIES TO AVOID OR MINIMIZE CAPITAL IMPROVEMENT PROJECTS TO HELP MEET NUTRIENT REDUCTION OBJECTIVES.
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
DC Position on IMA Negotiations Presented to the Blue Plains Regional Committee September 29, 2008 Government of the District of Columbia Adrian M. Fenty,
Department of the Environment Maryland’s Nutrient Trading Program Phase I- Trading between point sources and trading involving connecting on-site septic.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
2008 Facility Plan Update May Purpose  Comprehensive Plan through 2033 –Builds on Past Work –Adjust for Changing Conditions  Identify Capacity,
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager August 29, 2012 Revised August 30, 2012 Operating Agency Workgroup.
Briefing on IMA Negotiation Issues Presented to: Blue Plains IMA Negotiating Team Operating Agency Work Group March 11, 2010 District of Columbia Water.
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Status Report on Chesapeake Bay Clean Up Plan Wastewater Sector June 2, 2010.
1 Briefing Materials Flow and Nitrogen Issues By: D.C. Water and Sewer Authority February 28, 2008 Blue Plains Regional Committee Presented to: District.
1 Discussion Points for IMA Participants – Flow Studies December 19, 2006 District of Columbia Water and Sewer Authority.
2004 Tributary Strategies: Assessment of Implementation Options Steve Bieber Water Resources Program Presented at: COG Chesapeake Bay Policy Committee.
John Kennedy VA DEQ - Ches. Bay Program Mgr Tributary Strategies: Point Source Nutrient Controls Potomac Watershed.
1 Briefing for IMA Participants on Results of Flow Studies October 31, 2006 District of Columbia Water and Sewer Authority.
Multi-Jurisdictional-Use Facilities Capital Cost Allocation Study Update Presented to Blue Plains Regional Committee December 20, 2010 District of Columbia.
Delon Hampton and Associates, Chartered EPMC 3B Joint-Use Facilities Capital Cost Allocation Study Presented to Environmental Quality & Operations Committee.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
1 The Asset Reinvestment Logic Diagram End of Asset Life Reinvestment Decision Support Tool.
November 17, 2015NC AWWA-WEA Annual Conference Planning for the Future --- MSD’s Facility Plan Update Peter Weed and Hunter Carson, MSD Mary Knosby, HDR.
November 17, 2015 NC AWWA-WEA Annual conference
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Strategic Process Engineering Liquid Treatment Processes at the Blue Plains Advanced Wastewater Treatment Plant Introductory Workshop for Blue Plains Users.
Water Resources Technical Committee Chesapeake Bay Program Overview & Updates July 10, 2008 Tanya T. Spano.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Point Sources Progress Reporting Management Board Conference Call February 9, 2012.
Slide 1 Drinking Water Subcommittee Greg Gartrell, Chair CALFED Bay-Delta Public Advisory Committee SWRCB Periodic Review Presentation January 2005.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
A quantification of groundwater seepage during drought and its importance for water quality modeling in the St. Vrain watershed Hannah Chapin Thomas Gerber.
LOW D.O. OPERATION: EFFECTS ON BIOLOGICAL PHOSPHORUS REMOVAL, OXYGEN TRANSFER EFFICIENCY, DENITRIFICATION, AND ENERGY SAVINGS.
1 Briefing for Blue Plains Regional Committee on Potomac Interceptor Capacity Analyses June 28, 2007 District of Columbia Water and Sewer Authority.
Public Information Meeting Wastewater Treatment January 26, 2016.
Multi-Jurisdictional-Use Facilities Flow Analysis Study Update Presented to Blue Plains Regional Committee March 24, 2011 District of Columbia Water and.
COMPARISON OF MBBR AND Suspended growth BNR Performance at the HRWTF
BioWin3 ® – An Introduction Michael D. Doran, P. E. DEE Adjunct Professor of Civil & Environmental Engineering CEE 426.
Blue Plains IMA Suburban Position February 22, 2007.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
CTC 450 Review WW Sludge Processes.
Framework for CSO Control Planning
Update on PI Modeling and Nitrogen Removal at Blue Plains
LTCP and TN Cost Allocation
Wastewater Treatment.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Wastewater Facilities Upgrade Project
Hidden Capacity How Proper Maintenance and Cleaning of Sewer Systems Can Have Huge Benefits! Presentation by the Jersey Water Works CSO Committee For the.
Presentation transcript:

Strategic Process Engineering Liquid Treatment Processes at the Blue Plains Advanced Wastewater Treatment Plant Tier 1 Workshop Blue Plains Users October 18, 2004 Tier 1 Workshop Blue Plains Users October 18, 2004

2 Today’s Agenda Scope of Strategic Planning Blue Plains BNR Performance Planning Issues and Constraints Policy Issues Stakeholder Involvement Plan Wet Weather Treatment Options Nitrogen Removal Options Scope of Strategic Planning Blue Plains BNR Performance Planning Issues and Constraints Policy Issues Stakeholder Involvement Plan Wet Weather Treatment Options Nitrogen Removal Options

3 Current Regulatory Environment - Uncertainty Chesapeake Bay Program goals for 2010? Tributary Strategies released, not yet final Maryland – Nitrogen goal of 3 mg/l? DC - Nitrogen goal of 7.5 mg/l? Virginia - Nitrogen goal of 4 mg/l? Long Term Control Plan? Treat 193 MG tunnel pump out at Blue Plains over 2 days Complete Treatment Required? Implementation date? (>2010) Draft Blending Policy? Goal to protect biological processes if water quality is met May require more stringent permit limits on 001 Implementation date? (>2010?) Chesapeake Bay Program goals for 2010? Tributary Strategies released, not yet final Maryland – Nitrogen goal of 3 mg/l? DC - Nitrogen goal of 7.5 mg/l? Virginia - Nitrogen goal of 4 mg/l? Long Term Control Plan? Treat 193 MG tunnel pump out at Blue Plains over 2 days Complete Treatment Required? Implementation date? (>2010) Draft Blending Policy? Goal to protect biological processes if water quality is met May require more stringent permit limits on 001 Implementation date? (>2010?)

4 Need for Planning Blue Plains now at 90% of capacity BNR process now degrades during storm flows Chesapeake Bay Program calls for higher N removal Cost effective approach - limit peak flows to BNR LTCP Tunnel Pump out increases peak flow duration Sustained flows at 450 MGD for 2 days after storm Back to back storms could extend high flows one week BNR performance will degrade further Goals introduce conflicting treatment requirements BP Users flow management - Ave/Peak Capacity Holistic approach to planning is needed Blue Plains now at 90% of capacity BNR process now degrades during storm flows Chesapeake Bay Program calls for higher N removal Cost effective approach - limit peak flows to BNR LTCP Tunnel Pump out increases peak flow duration Sustained flows at 450 MGD for 2 days after storm Back to back storms could extend high flows one week BNR performance will degrade further Goals introduce conflicting treatment requirements BP Users flow management - Ave/Peak Capacity Holistic approach to planning is needed

5 WASA’s Implementation of Low Cost BNR Use existing tankage Operational changes Use existing tankage Operational changes Denit Demonstration Full scale 7.5 DC 1 st to achieve goal Waste Nitrification WAS to Secondary Improve process control – Nit/Denit Upgrade contract Ongoing DWT Research

6 Monthly Flow into Blue Plains

7 Nitrogen Removal Performance

8 Nitrogen Removal Performance Nitrogen Removal Performance

9 Performance Summary Blue Plains has met CBP goals BNR performance is most influenced by: Temperatures Groundwater infiltration Storm flows BUT, peak flows have been limited by: Construction – lower peak wet weather flows Upstream pump station capacity ENR Design Challenge: Blue Plains has to handle years with above average rainfall and expected temperature range Blue Plains has met CBP goals BNR performance is most influenced by: Temperatures Groundwater infiltration Storm flows BUT, peak flows have been limited by: Construction – lower peak wet weather flows Upstream pump station capacity ENR Design Challenge: Blue Plains has to handle years with above average rainfall and expected temperature range

10 Advanced Wastewater Treatment Plant at Blue Plains Rated Capacity 309 MGDRated Capacity 370 MGD Rated Capacity 370 MGD with half-plant denitrificationRated Capacity 370 MGD with full plant denitrification

11 CHALLENGES FOR ENR Blue Plains is at 90% capacity Primary clarifier capacity limits performance Biological Clarifier capacity also limited Full scale BNR has reduced plant safety factor New digesters will increase N load to BNR process by 30% Pump station rehabilitation will result in higher peak storm flows to Blue Plains LTCP tunnel pump out brings higher sustained flows to Blue Plains after the storm event Blue Plains is at 90% capacity Primary clarifier capacity limits performance Biological Clarifier capacity also limited Full scale BNR has reduced plant safety factor New digesters will increase N load to BNR process by 30% Pump station rehabilitation will result in higher peak storm flows to Blue Plains LTCP tunnel pump out brings higher sustained flows to Blue Plains after the storm event

12 Blue Plains New Digestion Facility Existing Solids Processing Building Proposed Digestion Facility

13 WASA Needs Answers How does WASA respond to CBP initiatives for higher nitrogen removal? (2010) How does WASA achieve LOT for N removal, if a goal and if a permit requirement? What facilities are needed to treat combined sewer tunnel pump-out flow? (>2010) How does WASA achieve higher levels of treatment for excess flow? What are roles of nutrient trading and creative permitting? What is the impact of BP User wet weather flow reduction strategies? How does WASA respond to CBP initiatives for higher nitrogen removal? (2010) How does WASA achieve LOT for N removal, if a goal and if a permit requirement? What facilities are needed to treat combined sewer tunnel pump-out flow? (>2010) How does WASA achieve higher levels of treatment for excess flow? What are roles of nutrient trading and creative permitting? What is the impact of BP User wet weather flow reduction strategies?

14 Policy Issues Treatment level for wet weather flows Excess flow CSS Tunnel pump out Peak flow ratio to complete treatment Bubble permit for Outfalls 001 and 002 Blue Plains NPDES Permit Relative to varying state Tributary Strategies TN removal – goal versus permit requirement Permit limits – daily, weekly, monthly requirements Nitrogen equivalency – still on the table? Treatment level for wet weather flows Excess flow CSS Tunnel pump out Peak flow ratio to complete treatment Bubble permit for Outfalls 001 and 002 Blue Plains NPDES Permit Relative to varying state Tributary Strategies TN removal – goal versus permit requirement Permit limits – daily, weekly, monthly requirements Nitrogen equivalency – still on the table?

15 Planning Approach Define Performance-based alternatives for nutrient levels and wet weather flows Define new facilities/costs for alternatives Define Worst-Case Scenario CS tunnel pump out requires complete treatment Excess flow requires complete treatment Limit of technology for nitrogen removal Define cost-effective approaches Expert Technical Advisory Group Stakeholder input to focus alternatives Define Performance-based alternatives for nutrient levels and wet weather flows Define new facilities/costs for alternatives Define Worst-Case Scenario CS tunnel pump out requires complete treatment Excess flow requires complete treatment Limit of technology for nitrogen removal Define cost-effective approaches Expert Technical Advisory Group Stakeholder input to focus alternatives

Goal of the Facilities Plan: Identify & define projects for inclusion in the CIP

Goal of the Strategic Plan: Provide WASA with a blueprint to cost-effectively meet regulatory requirements

18 Two-tier Stakeholder Involvement Plan Tier I – Blue Plains Users BP Technical Committee and Regional Committee Loudoun County, invited to BPTC/RC for strategic planning topics Tier II – Blue Plains Users and Regulators DCDOH (nutrient, CSO) EPA Region III(nutrient, CSO, capacity) EPA CBP (nutrient, CSO, capacity) EPA Headquarters(nutrient, CSO, capacity) MDE/ MD DNR (nutrient) VA DEQ (nutrient) Tier I – Blue Plains Users BP Technical Committee and Regional Committee Loudoun County, invited to BPTC/RC for strategic planning topics Tier II – Blue Plains Users and Regulators DCDOH (nutrient, CSO) EPA Region III(nutrient, CSO, capacity) EPA CBP (nutrient, CSO, capacity) EPA Headquarters(nutrient, CSO, capacity) MDE/ MD DNR (nutrient) VA DEQ (nutrient)

19 Tier 1-Blue Plains User Involvement Provides: WASA an opportunity to provide information on technologies, benefits, and costs to the users. A forum for BP User input on the process and technical issues and relative merits of the alternatives. A forum to discuss the cost and benefits of alternatives and set priorities WASA an opportunity to provide information on technologies, benefits, and costs to the users. A forum for BP User input on the process and technical issues and relative merits of the alternatives. A forum to discuss the cost and benefits of alternatives and set priorities

20 Tier 2 Stakeholder Involvement Provides: WASA an opportunity to provide information on technologies, costs and tradeoffs to the regulators. WASA with information from the regulatory agencies on acceptability of options. A forum to discuss the cost and benefits of alternatives and set priorities. WASA wants to be proactive in the “creative regulatory” process WASA an opportunity to provide information on technologies, costs and tradeoffs to the regulators. WASA with information from the regulatory agencies on acceptability of options. A forum to discuss the cost and benefits of alternatives and set priorities. WASA wants to be proactive in the “creative regulatory” process

21 Outreach Activities Purpose: To inform the public and interested groups. Target Audience: ANCs and environmental groups. Information Available: On WASA’s Website At public meetings Draft Facilities Plan for public review. Purpose: To inform the public and interested groups. Target Audience: ANCs and environmental groups. Information Available: On WASA’s Website At public meetings Draft Facilities Plan for public review.

22 Stakeholder Activities Plan OctJulAugSepDecJanFebMarAprMayJunNov Technical Stakeholder Workshops Technical Stakeholder Workshops Technical and Policy Stakeholder Workshops Technical and Policy Stakeholder Workshops Public Meetings Introductory Draft Plan Alternatives/costs Draft Plan

23 Inputs to WASA’s Decision Making Process REGULATORS Chesapeake Bay Program Tributary Strategies Bay Water Quality Model NPDES Permitting REGULATORS Chesapeake Bay Program Tributary Strategies Bay Water Quality Model NPDES Permitting DC WASA Strategic Planning Facilities Costs Pollutant/Nutrient Loads Strategic Planning Facilities Costs Pollutant/Nutrient Loads COG Nutrient Analysis studies Nutrient Trading Opportunities Non-Point Sources of Nutrient COG Nutrient Analysis studies Nutrient Trading Opportunities Non-Point Sources of Nutrient DC WASA BOARD PUBLIC

Discussion Wet Weather Treatment Options

25 POSSIBLE OPPORTUNITIES Blue Plains has “Overhead” Wet Weather Flows Sludge Digestion Recycles Gravity Thickener Overflow Filter Backwash Reducing the “Overhead” Could: Improve BNR performance Reduce future BNR capital cost Reduce O&M cost Better manage wet weather flows Blue Plains has “Overhead” Wet Weather Flows Sludge Digestion Recycles Gravity Thickener Overflow Filter Backwash Reducing the “Overhead” Could: Improve BNR performance Reduce future BNR capital cost Reduce O&M cost Better manage wet weather flows

26 Policy Issues Treatment level for wet weather flows Excess flow CSS Tunnel pump out Peak flow ratio to complete treatment Bubble permit for Outfalls 001 and 002 Blue Plains NPDES Permit Relative to varying state Tributary Strategies TN removal – goal versus permit requirement Permit limits – daily, weekly, monthly requirements Nitrogen equivalency – still on the table? Treatment level for wet weather flows Excess flow CSS Tunnel pump out Peak flow ratio to complete treatment Bubble permit for Outfalls 001 and 002 Blue Plains NPDES Permit Relative to varying state Tributary Strategies TN removal – goal versus permit requirement Permit limits – daily, weekly, monthly requirements Nitrogen equivalency – still on the table?

27 Wet Weather Flows Excess flow & combined tunnel sewer pump out flow scenarios: Complete treatment Equivalent to secondary Primary Policy Issues: What level of treatment is required? Can storm peaks to complete treatment be reduced? Excess flow & combined tunnel sewer pump out flow scenarios: Complete treatment Equivalent to secondary Primary Policy Issues: What level of treatment is required? Can storm peaks to complete treatment be reduced?

28 Wet Weather Flows Treatment options Compressible Filters Ballasted Settling

29 CSO Characterization for Tunnel Pump Out Event Mean Concentrations*, mg/l Total Suspended Solids – 156 Total Nitrogen – 4.8 Total Phosphorus – 1.0 *Flow weighted, Source: CSS LTCP Relative TN Loads, Lb/Year CSO Tunnel BP Outfall ,500 8,447, mg/l (untreated)5,632, mg/l 3,379, mg/l Event Mean Concentrations*, mg/l Total Suspended Solids – 156 Total Nitrogen – 4.8 Total Phosphorus – 1.0 *Flow weighted, Source: CSS LTCP Relative TN Loads, Lb/Year CSO Tunnel BP Outfall ,500 8,447, mg/l (untreated)5,632, mg/l 3,379, mg/l

30 Effective Blue Plains 2010 Annual TN Goal Jurisdiction Allocated IMA Flows (MGD) Various State TN Goals (mg/L) DC WSSC Fairfax Loudoun Other VA Blue Plains

31 Alternative Strategies for Additional Nitrogen Removal Alternative Total Nitrogen Discharge from Blue Plains Current NPDES Permit – 7.5 Current 2004 Tributary Strategies – 5.0 Limit of Technology – 3.0 TN Load to Potomac at 370 mgd Alternative Total Nitrogen Discharge from Blue Plains Current NPDES Permit – 7.5 Current 2004 Tributary Strategies – 5.0 Limit of Technology – 3.0 TN Load to Potomac at 370 mgd 23,140 lbs/d 8,447,200 lbs/yr 7.5 mg/l 15,430 lbs/d 5,631,600 lbs/yr 5.0 mg/l 9,260 lbs/d 3,378,900 lbs/yr 3.0 mg/l 23,140 lbs/d 8,447,200 lbs/yr 7.5 mg/l 15,430 lbs/d 5,631,600 lbs/yr 5.0 mg/l 9,260 lbs/d 3,378,900 lbs/yr 3.0 mg/l

32 Planning for Effluent Nitrogen Alternatives for: 5 mg/l and 3 mgN/L Regulatory Issues Does CSS Tunnel pump out require complete treatment? Possible to limit wet weather peaks <740 mgd? Impact of bubbles and nutrient trading Goal or permit requirement? Daily, weekly, monthly permit levels? Alternatives for: 5 mg/l and 3 mgN/L Regulatory Issues Does CSS Tunnel pump out require complete treatment? Possible to limit wet weather peaks <740 mgd? Impact of bubbles and nutrient trading Goal or permit requirement? Daily, weekly, monthly permit levels?

33 Nitrogen Removal Options Stay with two sludge system Optimize primary treatment Optimize secondary process to remove TN Optimize centrate treatment Add nitrification reactor volume Convert to a single sludge system Lowers clarifier overflow rates Reliability concerns? Add denitrification filters Reliability – at significant capital cost New technologies available to reduce cost Stay with two sludge system Optimize primary treatment Optimize secondary process to remove TN Optimize centrate treatment Add nitrification reactor volume Convert to a single sludge system Lowers clarifier overflow rates Reliability concerns? Add denitrification filters Reliability – at significant capital cost New technologies available to reduce cost

34 Sludge Digestion Centrate Treatment Low flow; high ammonia load – increases load to BNR by 30% Side stream or main flow treatment options? Side stream treatment may: Save operating cost Increase reliability Optimize TN removal Low flow; high ammonia load – increases load to BNR by 30% Side stream or main flow treatment options? Side stream treatment may: Save operating cost Increase reliability Optimize TN removal

35 Other Sidestreams Filter Backwash High “Instantaneous” Hydraulic Peaks Removal of recycle will lower loading to clarifiers Gravity Thickener Overflow Filter Backwash High “Instantaneous” Hydraulic Peaks Removal of recycle will lower loading to clarifiers Gravity Thickener Overflow

36 Cost Assumptions for Improved Nitrogen Removal Increased wet weather peaks from pump station upgrades Digester recycle load adds 30% load to BNR LTCP Pump out to complete treatment Flows up to 740 mgd for a maximum of 4 hours and up to 511 mgd indefinitely Cost estimates are planning level (+50%/-30%) Increased wet weather peaks from pump station upgrades Digester recycle load adds 30% load to BNR LTCP Pump out to complete treatment Flows up to 740 mgd for a maximum of 4 hours and up to 511 mgd indefinitely Cost estimates are planning level (+50%/-30%)

37 Blue Plains Users Flow Reduction Strategies BP User peak flows above IMA targets DC WASA flow reduction plan in place BP Users have sewer inspection and correction programs Strategic planning will assume that flow reduction programs will bring each user within IMA allocations BP User peak flows above IMA targets DC WASA flow reduction plan in place BP Users have sewer inspection and correction programs Strategic planning will assume that flow reduction programs will bring each user within IMA allocations

38 Policy Issues Treatment level for wet weather flows Excess flow CSS Tunnel pump out Peak flow ratio to complete treatment Bubble permit for Outfalls 001 and 002 Blue Plains NPDES Permit Relative to varying state Tributary Strategies TN removal – goal versus permit requirement Permit limits – daily, weekly, monthly requirements Nitrogen equivalency – still on the table? Treatment level for wet weather flows Excess flow CSS Tunnel pump out Peak flow ratio to complete treatment Bubble permit for Outfalls 001 and 002 Blue Plains NPDES Permit Relative to varying state Tributary Strategies TN removal – goal versus permit requirement Permit limits – daily, weekly, monthly requirements Nitrogen equivalency – still on the table?

End of presentation Further Discussion

40 Overview of Plan Development Process Ballasted Settling 2 or 1 Sludge System Centrate Treatment Denit Filters Sidestream treatment SWW Ballasted Settling 2 or 1 Sludge System Centrate Treatment Denit Filters Sidestream treatment SWW User Capacity Issues EPA Proposed Rule for Wet Weather Flows Long Term Control Plan Chesapeake Bay Program Real Estate Issues Wet Weather Treatment Alternatives Nitrogen Removal Alternatives Increased Capacity Alternatives Feasibility Review Recommended Facilities and Costs Process model Process model Capital costs O&M Costs Ease of Operations

41 Average Annual Influent Flows to Blue Plains

42 IMA Allocated Peak Flow Total Peak Flow = 1,076 MGD

43 Estimated Infiltration and Inflow into Blue Plains Based on assumptions for I/I used in the Regional Wastewater Flow Forecast Model

44 Peak Influent Flow to Blue Plains during Storms = 1076 MGD Average Annual Flow = 370 MGD Average Annual Flow = 370 MGD Dry Weather Diurnal Peak Flow = 416 MGD Infiltration Flow = 100 MGD Infiltration Flow = 100 MGD Storm Inflow = 560 MGD Storm Inflow = 560 MGD

45 Daily Average Influent Flow to Blue Plains Average Dry Weather Flow 297 mgd