Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.

Slides:



Advertisements
Similar presentations
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
A regulatory framework for gas quality treatment facilities: recap and update.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
Modification Review Proposal 0166 Review of necessary reform of NTS Offtake Arrangements Thursday 6th September 2007.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Transfers and Trades Transmission Workstream
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Bacton blending feasibility study Gas Quality Workshop 23 April 2007 Dr Nick Bates, National Grid Gas Transmission.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Industry Dialogue on xoserve Services 14 th September 2007.
Transfers and Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
UNC Modification Proposal 0373
UNC Trader User – Licence obligations
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
EU/GB Charging Project – Delivery Timescales
QSEC auction timetable
Proposed Transitional Gas Exit Arrangements
Richard Fairholme Transmission Workstream 4th September 2008
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
Commercial Arrangements For Gas Quality Service – Introduction
Presentation transcript:

Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007

Development of Commercial Arrangements - Overview  To implement the commercial arrangements for a gas quality service we would need to consider changing the UNC to include  definition of the gas quality service  registration mechanisms to allow Users to access the product  charging arrangements  liability arrangements  We envisage having a series of workshops to gather the User requirements in each of these areas.  Following completion of the workshop schedule National Grid NTS will raise a UNC Modification Proposal via the normal change process.

Timeline  Proposed workshop schedule  Workshop 1: Define gas quality service – May 2007  Workshop 2: Define registration mechanisms – June 2007  Workshop 3: Define charging arrangements – July 2007  Workshop 4: Define liability arrangements – August 2007  There may be scope to amalgamate later workshops if early progress is made.  UNC change process schedule  Assume a 4 month change cycle.  If UNC Proposal submitted by National Grid NTS on September 12 th, Panel recommendation can be made to Ofgem by 21st January  However, if UNC Proposal submitted by National Grid NTS on August 16 th, Panel recommendation on Proposal can be made to Ofgem by 21st December  We would suggest discussing this at the end of the presentation

Assumptions  NGG will carry out feasibility studies only after being approached by an interested party.  The feasibility study will be paid for by the interested party.  NGG will offer services to the market via an open season process based on information from the feasibility study.  The UNC Modification proposal will be developed on the basis of the hybrid 2 model i.e. the plant is built based on User commitment and NGG has an opportunity to build above User signal  GS(M)R limits are unlikely to be amended before 2020.

Gas Quality Services - Context  At the last Ofgem Scenario’s workstream meeting, NGG presented some data on the likely costs associated with building a nitrogen ballasting plant at Bacton.  Headline numbers:  Capital costs could be in the range of £200m  Operational costs could be in the order of £20m per annum  A feasibility study that would allow NGG to hold an open season, would require detailed design work. Typically these types of studies represent 3% of the capital cost i.e. potentially £6m.

Key Issues - Gas Quality Service  What service are we offering?  Wobbe reduction service or service based on other gas quality factors e.g. enrichment, total sulphur, dew point  Basis of product e.g Wobbe adjustment * volume * duration?  Single product or multiple product e.g. daily, monthly, annual?  Firm or interruptible services?  Lead times on delivery e.g. interactions between plant operations and gas flow nominations timescales.  Upstream considerations  UIOLI  Location of service delivery?  Who will purchase service – single party or shippers?  Method of delivering service: ballasting, blending loops, storage etc.  How much of these arrangements will reside within the Transporter Licence, UNC or Ancillary documents?

Key Issues - Gas Quality Service  Any questions, views, comments or suggestions for additional items to be included?

Key Issues - Access Mechanisms  How can we ensure that an open season can be held based on a feasibility study potentially specified by only a single party?  How will we ensure that prices derived in the feasibility study will be applicable to larger/smaller sized plants?  How will we reconcile the differing requirements of users e.g. what if each user wants a different level of plant resilience?  What if the User specification does not meet the NGG risk profile?  Should an open season be held at the feasibility stage to obtain firm requirements (& funding) from all users?

Key Issues - Access Mechanisms  How the open season will be run then needs to be considered;  Should the open season be limited to the shippers that participated in the feasibility study?  How much of the ‘product’ will be offered for sale?  Single or multiple tranches? What period between tranches?  How will auction results be turned into a signal to build.

Key Issues - Access Mechanisms  Any questions, views, comments or suggestions for additional items to be included?

Key Issues - Charging Arrangements  Should costs of feasibility study be securitised, paid for in advance or discounted if the plant construction goes ahead?  Should plant lifetime be set to 2020?  Capital costs of plant focussed on users (of the plant) via capacity charges  Operational costs of plant focussed on users (of the plant) via commodity charge  Should users pay 100% of plant costs or pass an NPV test?  If there is any spare capacity how should this be charged for?  If NGG builds any additional capacity how should this be sold?  Should there be UIOLI? And if so how should we charge for it?

Key Issues - Charging Arrangements  Any questions, views, comments or suggestions for additional items to be included?

Key Issues - Liability Arrangements  NGG liabilities  It is anticipated that NGG would earn a standard rate of return, therefore the risk of the assets would need to be the same as our existing assets.  If NGG is unable to deliver contracted service what would we need to buy-back?  The gas quality service for out of spec gas but within specification gas would still flow, or  Entry capacity at that entry point, or  Gas quality service and entry capacity?  NGG’s liabilities would to some extent be influenced by user requirements on resilience etc. NGG would therefore seek to have input to the plant build specifications or would need a mechanism to offset this risk.

Key Issues - Liability Arrangements  User liabilities  Overrun charges  How could we identify overruns at an individual user level?

Key Issues - Liability Arrangements  Any questions, views, comments or suggestions for additional items to be included?

Summary & Next steps  Hopefully demonstrated that there is a lot to be defined before raising a UNC Mod, hence our proposal to have gas quality as a topic for discussion in the Transmission Workstream.  At the start we put forward an initial timetable, if this is acceptable, here are some potential dates:  May: Monday 21 st  June: Monday 18 th, Tuesday 19 th, Monday 25 th, Wednesday 27  July: Friday 27 th