Assessing Seismic (Cascadia Subduction Zone) Risk at Oregon Dams

Slides:



Advertisements
Similar presentations
Jon Keeling, PE, CFM Carey Johnson, CFM ASFPM 2012 Conference May 22, 2012 The Mission of Dam Safety Hazard Mitigation – Kentucky’s Experience.
Advertisements

2013 Northwest Hydro Operators Forum 1 Risk-Informed Decision Making – FERC Perspective David Lord, P.E., D2SI Dam Safety Risk team – Portland, Or Natural.
USSD Committee on Monitoring of Dams and Their Foundations
Earthquake Mitigation I: Techniques for Reducing Earthquake Hazard “Earthquake Hazards and Risk Mitigation in Western Washington and Oregon” Keoni Wong,
Sharif University of Technology Civil Engineering Department Tehran-Iran Dam Safety An Approach to Prevent Dam Incidents.
IN-DELTA STORAGE PROGRAM STAKEHOLDERS COMMITTEE MEETING URS Corporation January 22, 2003 URS Corporation January 22, 2003.
WHAT COULD BE THE NEXT EARTHQUAKE DISASTER FOR JAPAN  A difficult question, but ---  It is the one that was being asked long before the March 11, 2011.
Risk Management and Dam Safety. Reclamation Played a Pivotal Role in Developing Major River Basins in the Western United States.
1 Scoggins Dam Overview of Seismic Risk July 18, 2012.
2011 MADCS Conference.  FMA is a tool to help identify:  Priorities for rehabilitation  Improvements for operation, maintenance and data collection.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Josh Bruce, AICP Interim Director Oregon Partnership for Disaster Resilience Community Service Center, University of Oregon Seaside,
OWENSBORO: LIVING WITH EARTHQUAKES IN THE NEW MADRID SEISMIC ZONE OWENSBORO: LIVING WITH EARTHQUAKES IN THE NEW MADRID SEISMIC ZONE WALTER HAYS GLOBAL.
During the semester Introductions Basics of earthquakes History and Recording Damaging Earthquakes and Understanding seismic exposure Undertaking loss.
Abstract Detection of active faults and seismic hazards in the Seattle area is problematic, owing to thick surficial deposits and abundant vegetative cover.
Guided Notes about Earthquakes and Society
ABSTRACT Co-seismic landslides are associated with significant infrastructure damage and human casualties in earthquake- prone areas of the world. These.
Abstract Earthquakes are one of the most powerful natural disasters that occur in the world. Ground motion and shaking during an earthquake can be detected.
Structural Damage and Response to Historic California Tsunamis By Orville T. Magoon Coastal Zone Foundation Seismic Safety Commission Workshop May 15,
Dam Failure Dams are generally an expensive structure that directly affect the economy of the area through power generation, flood control and water supply.
Future Bay Area Earthquakes – Water & Sewer Issues JEANNE PERKINS ABAG Earthquake and Hazards Program Consultant.
Certification Requirements
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Risk modeling.
Dams Mehmet Özger (Barajlar) Department of Civil Engineering, I.T.U.
Structural Engineering Issues for a Large Cascadia Event.
Cascadia Subduction Zone Earthquakes and Critical Infrastructure Workshop Edward Perez, FERC Background - Part 12D Report. - Every 5 years. - Top-to-bottom.
Transportation Safety Board Underlying Factors in Subgrade Failures IRSC Conference Tokyo, November 2002.
Virginia Department of Conservation & Recreation Virginia Dam Safety & Floodplain Programs William G. Browning, Director Dam Safety & Floodplain Management.
Real World Applications of USGS EQ Science: Stacy Bartoletti Degenkolb Engineers Structural Engineers Association of Washington Cascadia Region Earthquake.
Earthquake Hazards.
Feasibility Level Evaluation of Seismic Stability for Remedy Selection Senda Ozkan, Tetra Tech Inc. Gary Braun, Tetra Tech Inc.
1 Scoggins Dam Geotechnical Analysis and Risk Analysis July 18, 2012.
LIQUEFACTION FAILURE OF FOUNDATION - STRUCTURE COLLAPSE.
Emergency Action Plans for Dams in Texas An EMC’s Role With The EAP Presented By: Megan Dutton, P.E. TCEQ Dam Safety Program.
Industry & Research: Issues, needs and conclusions from the US IMPACT Investigation of Extreme Flood Processes & Uncertainty Workshop at HR Wallingford,
Earthquakes & Society –tsunami –seismic gap Objectives Discuss factors that affect the amount of damage done by an earthquake. Explain some of the factors.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Probabilistic Ground Motions for Scoggins Dam, Oregon Chris Wood Seismotectonics & Geophysics Group Technical Service Center July 2012.
Liquefaction Liquefaction occurs where ground water is near the surface in soils composed of sands and silts. The soil temporarily loses strength and behaves.
 A vibration of the Earth produced by a rapid release of energy  Often occur along faults – breaks in the Earths crust and mantle (plate boundaries)
Geotechnical Engineering Research Ideas Cascadia Working Group 05/15/2012.
19.4 – Earthquakes & Society. Damages  Death and injuries  Collapse of buildings  Landslides  Fires  Explosions  Flood waters.
Embankment Dam and Spillway Relative Risk Procedures (for Asset Management/Maintenance) Luc Chouinard – McGill University.
MS Dam Safety Program Dusty Myers, P.E. Chief, Dam Safety Division.
US Army Corps of Engineers BUILDING STRONG ® Name of Levee Segment Presenter Name Presenter Title Duty Location Date of Presentation.
US Army Corps of Engineers BUILDING STRONG ® Jody Fischer P.E. Levee Safety Program Manager Los Angeles District U.S. Army Corps of Engineers 14 December.
Chapter 8.  Earthquake - the vibration of the earth produced by a rapid release of energy. Focus is the point inside earth that starts the earthquake.
OVERVIEW OF THE FIT PROGRAM PRESENTED TO THE STATE INTERAGENCY HAZARD MITIGATION TEAM (IHMT) Oregon GIS Framework, Hazards FIT BOB DENOUDEN, STEVE LUCKER.
Evacuation Procedures City Council October 20, 2015.
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
Presentation Overview
Development of Seismic Design Approach for Freestanding Freight Railroad Embankment Comprised of Lightweight Cellular Concrete Cell-Crete Corp. Steven.
Emergency Preparedness - Earthquakes -
Transportation Safety Board
Emergency Preparedness - Earthquakes -
BRIDGES MOST IMPORTANT GEOTECHNICAL EFFECT- LIQUEFACTION
Risk Assessment Maps for Seaside OR
Living with Earth 1st Edition
Tennessee Safe Dams Program
Residential Foundations
Residential Foundations
Presentation to Coachella’s City Council October 8, 2014
19.4 – Earthquakes & Society
When the Big One Comes A Study of Hazards Associated with a Major Earthquake Along Utah’s Highly-Populated Wasatch Front Authored by Kevin Franke Civil.
VII. Earthquake Mitigation
Bituminous-faced Rockfill Dam Seismic Performance Prediction of stress-strain behaviour and potential damages Proposal for the 15th International Benchmark.
Urban Water Institute 24th Annual Conference Oroville Dam
Tahsis Emergency Programming
Presentation transcript:

Assessing Seismic (Cascadia Subduction Zone) Risk at Oregon Dams Keith Mills, P.E., G.E. Dam Safety Engineer Oregon Water Resources Department

Oregon Statutory Dams 10 feet or higher Over 9.2 acre feet of water Design review/approval Inspection frequency by hazard classification High – annual inspection Plus Emergency Action Plans (EAPs) Significant – Once every 2-3 years Low – Once every 5-6 years Federal Agencies responsible for their dams Dam information in database on the web High Hazard 61/130 Significant Hazard 152/175 Low Hazard 733/939 1244

OWRD Seismic Hazards Assessment 36 high hazard dams closest to Cascadia S.Z. Dams west of longitude 123.0 degrees 3 State regulated dams - current and satisfactory seismic analysis 1 State regulated dam with analysis showing failure at 0.15 g 3 State regulated dams with indicators of liquefaction potential 1 USBR dam - unsatisfactory seismic analysis (deformation) Remaining dams unknown (to OWRD) but with no major apparent indicators of liquefiable or highly compressible foundations or with hydraulically placed embankment materials.

Priorities for Seismic Analysis Need for seismic stability modifications Big Creek Upper and Lower dams (Newport) In progress (HDR/Cornforth) Bear Creek dam (Astoria) Re-investigation (City - OWRD scoping now) Lower Pony Creek dam (Coos Bay – North Bend) Proposed in dam owners next budget Northwest State Regulated High Hazard dams

Big Creek Dams 65 feet of sandy silt below lower dam Water treatment plant at base of dams Half of SPT’s for lower dam: N = 0 N = 0 not that uncommon around coastal estuaries HDR lead consultant Subsurface investigation complete Soil testing and analysis in progress Cornforth – seismic site characterization (just completed)

ML (sandy) with half blow counts N=0 Big Creek Lower ML (sandy) with half blow counts N=0

Bear Creek Dam Concrete dam on fractured rock Dam above Knappa-Svensen – east of Astoria Harza analysis (soil mechanics) – failure at 0.15 g Emergency Action Plan (EAP) has Level 3 Special emergency condition Self evacuate like those in Tsunami zone OWRD D.S. in discussions with City of Astoria Field investigation with instrumentation – uplift pressure, rock strength, concrete strength (cracks)

Concrete Gravity dam built 1912 and raised in 1953 Left abutment –fractured rock and leakage Foundation – fractured rock, unknown uplift pressure

Pony Creek Dam Embankment dam Designed in 1987 No seismic analysis apparent Above coastal slough Foundation materials uncertain Seismic analysis recommended and under consideration Water treatment plant at base of dam

Dams to current seismic standard 2 rock-fill dams Rock Foundation and abutments Very little seepage Designed to current seismic standards Hillsboro (Barney reservoir) Dam McGuire Dam McMinnville W&L 1 earth-fill dam on rock - Upper Pony Creek Dam – Cascadia and crustal design

Preparing for Cascadia Tsunami (rapid, no direct effects on high hazard dams) Large (extremely) landslides with landslide dams (LiDAR) Extreme liquefaction coastal valleys Bridge failures (Bruce - ODOT) Oregon Seismic Lifelines Identification Technical Documentation (CH2MHill for ODOT) - SECTION 3 Evaluation of Roadway Damage Risk Due To Dam Seismic Damage Likely very limited coastal access by road Inspections by helicopter (they will be in high demand) Engineered Dams unlikely to be highest priority emergency Mapping tool with earthquakes (1 orange dot)

Emergency Action Plans Oregon Template – will present at ASDSO annual meeting) Notification short and up front Emergency detection and evaluation Level 3 Special – Severe shaking evacuation – no notification Probable modes of failure Liquefaction, crest displacement, slope instability, concrete failure, rock abutment displacement Inundation (dambreak flood) maps Sunny day for CSZ quake Responsibilities - emergency manager – know maps and what to do – will they have resources?

Rapid Dam Breach Low hazard dam failed in 2011, in eastern Oregon near Baker City

Coordination with emergency managers Evacuation responsibilities and resources Inspection of infrastructure May take a long time EAPs for dams close to CSZ Emergency Level 3 Special Oregon Emergency Response Council Dam Safety Engineer is currently OWRD representative OWRD engineers input into Oregon Cascadia Plan Also have roles in flood and drought

Seismic Analysis Issues Possible conservatism in FLAC and Newmark analyses (Scoggins Consultant Review Board) Actual behavior of dams in Subduction Event Waiting to learn from dam performance during Tohoku great earthquake ML behavior in subduction zone earthquake Seismic analysis of fractured rock abutments

Summary Aware (too much) of CSZ and what it can do Using available resources on high priority dams EAP grants HEC-RAS/HMS inundation analysis for hazard classification Seismic analysis coastal dams Very conservative seismic analyses are unhelpful for evaluating risk at existing dams Ground access to dams closest to Cascadia will at best be difficult after a major S.Z. earthquake Repair of damaged dams will be prolonged