A nerve centre of Industry….. INDO-GERMAN INSTITUTE OF ADVANCED TECHNOLOGY International Approaches in Master Planning of Industrial Parks India: VIZAG.

Slides:



Advertisements
Similar presentations
Department of Fisheries Activities Specific to the SMMA Thomas Nelson Department of Fisheries Ministry of Agriculture, Lands, Forestry and Fisheries SAINT.
Advertisements

Safe and Sustainable Water Resources Research Integrate the existing Drinking Water and Water Quality research programs into one holistic program that.
Implementation of waste management plans in Serbia 2013 workshop on Waste Policy Implementation May 2013 Copenhagen.
New opportunities for regional development through cross-border cooperation Ministry of Environmental Protection and Regional Development November 16,
Part III Solid Waste Engineering
The German Administration Basic structure NATIONAL LEVEL ADMINISTRATION MUNICIPAL (LOCAL) LEVEL ADMINISTRATION STATE LEVEL ADMINISTRATION.
Making Aarhus work in international forums A workshop on promoting the application of the principles of the Aarhus Convention in international forums Geneva,
Technology Focus on Physical Infrastructures. Sustainable Development as Integration Industrial Ecology Technology Politics Society Environment Industrial.
Environment and Business Course Overview Instructor: Jerry Patchell; Office Hours: Tuesday 12:00-14:00 Room 2352A TA: Kaxton Siu;
ENVIRONMENTAL RIGHTS ARE HUMAN RIGHTS
Wenxin Zhang Department of Civic Design University of Liverpool
Definition of Ecotourism  Ecotourism Kenya defines Ecotourism as, “the involvement of travelers in environmental conservation practices that address.
Introduction to the Session 6 - Theme 4 – on “Water Resources Management and Governance”
THE ENVIRONMENTAL BALANCE As Aalborg commitments monitoring tool Paola Poggipollini Comune di Ferrara UNESCO World Cultural Heritage.
Postgraduate Educational Course in radiation protection and the Safety of Radiation sources PGEC Part IV The International System of Radiation Protection.
IWRM as a Tool for Adaptation to Climate Change
Dr. Murali G. Ranjitkar Visiting fellow, NASC. Environment Management Its an attempt to control human impact on and interaction with the environment in.
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Legal aspects related to Brownfield redevelopment in Lithuania Daiva.
Table 3 SWMI – Water Matters –Topics – 1Dangerous Substances 2Forestry 3Septic Tanks (Unsewered Properties) Shannon International River Basin District.
INKOMATI CATCHMENT MANAGEMENT AGENCY Science & Management.
SWITCH Training Kit: Module 1 – Preparing for the Future Module 1: Preparing for the Future SWITCH Training Kit Module 1: Preparing for the Future Strategic.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
The Planning Regions Legend (reduced): urban agglomeration rural area
BIODIVERSITY CONSERVATION, AND ADAPTATION ASPECTS IN NATIONAL STRATEGIES ON POVERTY REDUCTION (NS- PR), SOCIO-ECONOMIC DEVELOPMENT PLAN (SEDP)
Gregor Stephani Umweltministerium Baden-Württemberg 1 EU-Twinning Project RO/2006/IB/EN/09 Implementation and Enforcement of the Environmental Acquis at.
Flintstone-Oldtown Planning Region Comprehensive Plan Kick-Off Meeting June 23, 2010 Insert pictures.
Welcome to Skåne (SWEDEN) Skåne County Administrative Board HAMED ARWAND.
Umweltbundesamt Environment Agency Austria © cmisje.
FOREST FUNCTIONS FOR DISASTER MITIGATION By: Maj. Gen. Pushpendra Singh, Executive Director, DMI, Bhopal.
Spatial Planning in Germany Principles The preparation of spatial plans and their implementation are principally independent from each other. A town planning.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
The Management Strategy for the Bulgarian Part of the Black Sea and its Coastal Lakes Lyudmil Ikonomov Executive Director, Institute for Ecological Modernisation.
Kyrgyzstan priorities in environment protection B. Tolongutov, Director, State Regulation Center on Environment Protection & Ecological Safety Sector State.
Water Resource Management: Strategic Issues & Perspectives Fred Van Zyl Department of Water Affairs 30 April
Perceived Climate Change Impacts and Exposure Units ASTRA Conference May 2006 Klaipeda Jürgen Kropp & Klaus Eisenack Potsdam Institute for Climate.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Infrastructure Development Bill [B ] Submission by the Centre for Environmental Rights to Portfolio Committee on Economic Development 14 January.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Sample Codes of Ethics in Adventure Tourism
Successful Application of SEP In Sitting Of Industries.
SEA in the Czech Republic Prague, 24 September 2008.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
ICZM PROTOCOL INDICATORS THE MEDITERRANEAN PROTOCOL ON INTEGRATED COASTAL ZONE MANAGEMENT: What indicators are needed? Marko PREM Director a.i.
Comprehensive Plan Update. General, far-reaching vision to benefit the whole community Takes a long term view of issues Focuses on physical development.
1 Integrating Biodiversity Conservation Into Impact Assessment: The Experience of Uganda BERINA UWIMBABAZI.
Community Development Department FUTURE LAND USE MAP AMENDMENT LU-MIN & RZ-OTH
Sustainable Community EMS Design Including Pollution Prevention Michelle M. Wyman Reed Smith Shaw & McClay LLP EMS Models and Strategies: ISO & Beyond.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
Sustainability – why is it way beyond the Triple Bottom Line ?
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
1. Rabka-Zdroj for more than a hundred years is a spa town famous for its large resources of medicinal mineral waters. › Disadvantage: geographical location.
European Community European Regional Development Fund Baltic Sea Region INTERREG III B Programme Area 2000 – 2006.
Albania - Identification and notification of the public concerned in Decision Making : Best practices and Challenges Aarhus Convention Task Force on Public.
A Sustainable Tourism Framework for the Caribbean Mercedes Silva Sustainable Tourism Specialist Caribbean Tourism Organization “Ma Pampo” World Ecotourism.
India Development Strategy (FY2012–FY2016) ADB India’s Country Partnership Strategy (2013 – 2017) ADB’s Long-Term Strategic Framework (Strategy 2020)
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Mining Waste Directive.
STATUS OF IMPLEMENTATION OF 2015 ACTION PLAN ENVIROMENTAL PROTECTION AGENCY A PRESENTATION TO THE REGIONAL COORDINATING COUNCIL Sally Biney Director/EPA/ACCRA.
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
Environment Sector Working Group Cross-Sectoral Environmental Strategy
Sendai Framework for Disaster Risk Reduction
AD13LM Land Management Lecture 4: Sustainable Planning
District Disaster Risk Reduction Managment Plan
Industrial Area Planning Procedure
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Strategic Environmental Assessment (SEA)
Natura 2000 Preparatory Actions Designation and management of SACs
Andrea Tilche Unit Head of the Water Key Action
Presentation transcript:

A nerve centre of Industry….. INDO-GERMAN INSTITUTE OF ADVANCED TECHNOLOGY International Approaches in Master Planning of Industrial Parks India: VIZAG Steel Plant: Total Size:22,000 acres Under plant:max. 6,000 acres Germany: BAYER Chemical Park Leverkusen: Total Size:1,000 acres, 6% undeveloped area workers:30,000 Existing since:1891 Improper Sitting 1.Adequate ‘designated sites’ in Master or Regional Plans do not exist or the designation is not based on environmental considerations. 2.As a result the development of industrial parks and of affiliated activities like housing, infrastructure and transport is often haphazard and un-coordinated and frequently causes serious disaster risks. 3.Insufficient consideration of environmental aspects often results in over exploitation of local resources, pollution problems, and negative impacts on the surrounding environment. 4.Consumption of land resources higher than necessary to achieve the socio- economic results Environmental Problems within the Industrial Park 1.Layout of the industrial parks frequently does not meet the requirements of the industries; e.g. land for different functions (process, storage, transportation, infrastructures and services, disaster management etc.) is not properly allocated and / or not adequately foreseen. 2.Infrastructures like roads, lightning, water supply, sewers, plantation, common effluent treatment plants, waste collection and management facilities are not adequate and / or not managed and maintained properly. 3.Industries are not grouped properly and thus networking for efficient energy / material / waste flow is not possible. 4.Manufacturing processes and pollution control measures in industries are not up-to- date. Environmental Problems outside the Industrial Park 1.Industrial parks do not fit into the natural settings. 2.Over exploitation of resources e.g. water. 3.Haphazard development of housing areas. 4.Impact on surrounding land uses viz. habitat, agriculture, forests, housing areas etc. 5.Stress on already inadequate supporting infrastructures viz. roads, hospitals etc. Germany uses a two tiers approach with several feedback loops: 1.The spatial Planning Procedure 2.The design of the project itself Reasons for spatial Planning  Each Planning has a spatial component: All natural resources and environmental media are defined by their location.  Land and natural Resources are limited: The demand for land exceeds the available amount of land.  The need for protection: Effective protection of natural resources and their sustainable use requires a proper management. Conflicts have to be handled in a fair and productive manner: Demands are often conflicting. A clear and defined procedure is required to allocate land uses and to manage these demands in a fair manner.  Basic Objectives Preserve and protect sites of important and sensitive natural resources and environmental media by allowing only a type of land utilisation, which will not adversely affect the natural functions.   Plan and manage the rehabilitation of degraded sites in order to improve environmental quality.  Allocate land use to sites in accordance with their natural capabilities. Strategic approach  Provide Complete Baseline Information: Compile and assess information on all types, qualities and sensitivities of the natural resources for the total area of a given planning region.  Determine Spatial Development Objectives: Develop spatial objectives in terms of protection conservation, rehabilitation and development in form of a spatial development plan - prior to any project.  industrial development  residential development  development of the infrastructure  resource extraction etc.  agricultural development  recreation  Protection of natural resources  Offer Options for Development: This plan should provide sufficient land selected on ecological considerations for all kinds of future land uses from all sectors of the society such as: Setting for Decision Making and Plan Approval State level Development Programme Regional Plan NGO´s Private or Public Building Project Legally Binding Plan Approval Existing Planning Objectives Interests Planning Laws Supplementary Planning Decision Support Legal Basis Federal Building Code Water Act Regional Planning Law Nature Conservation Act Immission Control Act Master Plan Legally Binding Layout Plan EIA Spatial Impact Assessment Procedure (SIA) Directives Affected Public Sectoral Administr ation Other stakehol ders Decision Support Economic and Environmental Efficiency of Industrial Parks Environmental Concerns in India: Principles of Plan Co-ordination Vertical and horizontal Co-operation: All new plans are developed in direct collaboration and interaction with all concerned authorities Informational notification: Plan contents of relevance for other plans is incorporated into those plans Principles of Plan Co-ordination: Counter Current Principle State Ministry of Regional Development and Environmental Affairs Municipality District Government State Office for Environmental Protection State Office for Water Management Water Resource Management of The District Environmental Protection Department Local Nature Conservation Office Environmental Protection Authority Tools for Plan Co-ordination Prescribed co-ordination procedures and required degree of mutual co- operation: by exchange of information by mutual collaboration by mutual consent informational notification: plan contents of relevance for other plans are incorporated into them Prescribed time frames Integration of social, economic, ecological and cultural aspects; Involvement of bearers of public interest / stakeholders Licensing and control of industries: county (=taluka), municipality or even city level Approval of local master plans: county (taluka) level; for municipalities: district level Notification of water protection zones: taluka level, municipalities Decision Making and Execution Decision-making as well as execution is the task of the lowest possible level within the administrative hierarchy Examples: The vertical linkages between national, state and local level are not directing but guiding links Consent Principle Open Result site and situation specific solutions democratic accepted solutions optimum solution under given circumstances Consequences: Site Master Planning Workflow 1.Assessment of property need – including development options 2.Topography of the site 3.Development of a theoretical basis for the site master plan Result Block Plan with Elevation 4.Assigning functions to the block plan - Clustering of functions Result 5.Detailing Result 6.Development of standards for infrastructures: a)Streets b)Sewage system c)Drainage system for surface water d)Concept for fire-fighting water system e)Water management concept including reuse / recycling 7.Safety concept Result Integrated Master Plan 36 ha 68 ha 53 ha 32 ha Site Leverkusen We would like to thank CURRENTA (former BAYER Industry Services and BAYER Technology Services) who provided us with their experience and competence and their presentations.