D. R. BettFONT Meeting 30 Jan 20141 Summary of FONT Studies Jan 2014 D. R. Bett.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
D. R. BettFONT Meeting 10 Feb Summary of FONT Studies Jan 2014 D. R. Bett.
Chapter 12. Direct Synthesis ( G includes G m, G v ) 1. Specify closed-loop response (transfer function) 2. Need process model, (= G P G M G V ) 3. Solve.
N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
Automatic control by meiling chen
Oct. 30, 2007 LCLS FAC D. Fairley MATLAB Feedback Phase II Commissioning.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
D. R. BettFONT Meeting 5 th May Current DAQ State D. R. Bett.
PQB Photocathode Analyzing Power Study May 19, 2009.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Scan System Kay Kasemir, Xihui Chen Jan Managed by UT-Battelle for the U.S. Department of Energy Automated Experiment Control “Scan” should be.
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Paul Chu Lattice Database.  Learning MySQL  Model DB prototyped Include part of the Lattice DB (Device Settings) Converted from SLAC/LCLS MACHINE_MODEL.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
Adding SubtractingMultiplyingDividingMiscellaneous.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Calibration summary Nov-Dec 09 R Apsimon. 10 Nov 09 Note, the power rail on the FONT5 board wasn’t working properly and so there is no good quality information.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
2/20/2016J-PARC1 Virtual Accelerator An Accelerator Simulator.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Beam Studies December 2014 Runs: 7821, 7822, and 7860 December 29, 2014.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
1 Test Beam with Hybrid 6 Florian Lütticke for the Testbeam Crew Bonn University 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
Roundup of Week at ATF Mikey Davis 19 April /26.
Further Tracking Studies and March Trip Plan
Resolution Study T. Bromwich FONT 8 September 2017.
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
FONT Meeting 10th February 2011
Firmware Update 29/03/2017 Rebecca Ramjiawan.
Analysis of March ATF Run
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Beam Optics Set-Up at SLAC End Station A
Progress towards nanometre beam stabilisation at ATF2
مديريت موثر جلسات Running a Meeting that Works
Status of Instrumental Beam Studies and Technical Description of Detectors and DAQ February 24, 2017.
Adding with 9’s.
Adding with 10’s.
Extraction kicker scan & feedback results
Adding ____ + 10.
Presentation transcript:

D. R. BettFONT Meeting 30 Jan Summary of FONT Studies Jan 2014 D. R. Bett

Shift 1 – 23/01/14 D. R. Bett2FONT Meeting 30 Jan 2014 Run/scan nameDescription Cal loPhase1 jitRun1Large P3 offset jitRun2P3 zeroed K1Cal K2Cal jitRun3-9Part of EPICS added delay scan jitRun10Companion to 0431 set file jitRun11-13Part of EPICS added delay scan longJitRun1-2Long jitter run jitRun14Part of EPICS added delay scan longJitRun3Long jitter run autoLongJitRun1-23DAQ in automatic jitter run mode overwritten_autoLongJitRun_1Not sure autoRunPostRetune_1-18DAQ in automatic jitter run mode jitRun15Companion to 0909 set file

Shift 2 – 24/01/14 D. R. Bett3FONT Meeting 30 Jan 2014 Run/scan nameDescription moverCal1 Phase moverCal2 loPhaseScan2 loPhaseScan3 autoJitRun_1-6DAQ in automatic jitter run mode autoJitRun_NewOptics_1-13DAQ in automatic jitter run mode autoJitRun2_1-8DAQ in automatic jitter run mode detailedLoPhaseScan1 moverCalibration_loPhase detailedPhaseAroundOptimum wideMoverCalibration wideAbsoluteMoverScanRunning out of ideas… RCPSscanP2

Shift 3(i) – 29/01/14 D. R. Bett4FONT Meeting 30 Jan 2014 Run/scan nameDescription loPhase1_1X,3X,5X ZV1Xcal_1X,3X,5X ZV2Xcal_1X,3X,5X ZV3Xcal_1X,3X,5X jitRun1Jitter run jitRun2_addedDelay320Jitter run with added delay in EPICS.vi jitRun3_centeredJitter run with the beam approximately centered in all 3 BPMs ZV1Xcal2_1X,3X,5X ZV2Xcal2_1X,3X,5X ZV3Xcal2_1X,3X,5X jitRun4_centeredJitter run with the beam approximately centered in all 3 BPMs loPhase2_1X,3X,5X jitRun5_1X,3X,5XonSLACJitter run to compare SLAC resolution to FONT resolution

Shift 3(ii) – 29/01/14 D. R. Bett5FONT Meeting 30 Jan 2014 Run/scan nameDescription ZV1FFcal loPhase3 mCal1 K2Cal1 K1Cal1 jitRun6Jitter run fbRun1Coupled loop feedback run fbRun2Single loop feedback run: K2 only fbRun3Single loop feedback run: K1 only