UGDIE PROJECT MEETING Athens 23-25 September 2004 1 WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.

Slides:



Advertisements
Similar presentations
VARTAN – Validation Reporting Templates Jürgen Teutsch, NLR CAATS Workshop, 16-Feb-2006, Lanzarote.
Advertisements

Transition from Q1- 8th to Q1- 9th edition
System Integration Verification and Validation
CIRAS PROJECT OVERVIEW
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
1 This document and its contents are the property of The University of Iowa’s Public Policy Center National Evaluation of a Mileage- Based Road User Charge.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 4: Phase Management - Elaboration.
WP3- Development: Milestone M3 Lisbon 30 January 2004 National Technical University of Athens.
Stepan Potiyenko ISS Sr.SW Developer.
Software Measurement and Process Improvement
UGDIE PROJECT MEETING Lisbon – January WP8 - Project Management Contractual obligations following the 2 nd Annual Review fulfilled –Deliverable.
Software Project Transition Planning
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.
ΑΝΝΕΧ 3 by SCIRO. Task 2.1 – Functional requirements definition Task 2.1 aims at drawing the functional analysis of F-MAN, starting from the users’ needs.
Validating and Improving Test-Case Effectiveness Author: Yuri Chernak Presenter: Lam, Man Tat.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Iterative development and The Unified process
CURE International Keith Wagner Clayton Hughes Tyler Alexander Ryan Tierney.
Virginia Teacher Performance Evaluation System
An Agile View of Process
LEARN. NETWORK. DISCOVER. | #QADexplore Implementing Business Process Management: Steps to Success WCUG – November 18, 2014.
Managing Project Quality
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Extreme Programming Software Development Written by Sanjay Kumar.
STATE OF NORTH DAKOTA Assessment / Standard Fee Schedule Design Project for People with Developmental Disabilities Quality Indicator Selection Steering.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
Presentation by SNCF in 19/20 April 2004 Meeting in Kranjska.
Slide 1 Final Conference Stratos Papadimitriou Cracow, September 2009 Work Package C A Quality Management Approach for Managing Mobility in Medium and.
MyOcean2 First Annual Meeting – April 2013 Answer to users’ needs in service definition and evolution Dominique Obaton, Vincent Claverie WP2 MyOcean2.
Some Sub-Activities within Requirements Engineering 1.Prototyping 2.Requirements Documentation 3.Requirements Validation 4.Requirements Measurements 5.Requirements.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Methodologies. Contents Waterfall Model Evolutionary Models Incremental Development.
ISO 9001 – an overview Tor Stålhane IDI / NTNU. ISO 9001 and software development ISO 9001 is a general standard – equally applicable to software development.
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
Project Methodology May 2, System Development Life Cycle Overview.
Senior Evaluation Officer GEF Independent Evaluation Office Minsk, Belarus September 2015 Evaluation in the GEF and Training Module on Terminal Evaluations.
July 26th, 2004INFN-Genova Barbara Mascialino Overview of the new phase of Barbara Mascialino July 26 th 2004.
Software Architecture Evaluation Methodologies Presented By: Anthony Register.
Over View of CENELC Standards for Signalling Applications
Lecture 13.  Failure mode: when team understands requirements but is unable to meet them.  To ensure that you are building the right system Continually.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
The common structure and ISO 9001:2015 additions
Demand Forecast Deviations Working Group Presented to: Stakeholder Advisory Committee Presented by: Pat Doran January 24, 2007.
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
1 ERCOT Retail Release Overview. 2 How Are Changes Managed? Retail Testing Business Teams Development Teams Release Management Management of: Migration.
GINA WP4.2 Business and Exploitation Plan March 10 th 2010 Lisbon GNSS for INnovative Road Applications.
We increase the impact of marketing measures and enhance our customers’ brand value. In order to achieve this goal we combine market research and consulting.
Implementation recommendations 1st COPRAS review Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels Bart Brusse.
Introduction to Performance Testing Performance testing is the process of determining the speed or effectiveness of a computer, network, software program.
Overview of the Final Report and Findings from the Review of Sampling Methods in Extrapolated New Base-Year Generation Studies May 11-12, 2004.
Oracle eBusiness Financials R12 Oracle Receivables Functional Overview TCS Oracle Practice.
ΑΝΝΕΧ 10 by EK. Rail Operators‘ Group (1) 1.Background F-Man Cargo operators: FS, CP, SZ. Their responsibilities: - to define their needs for a F-Man.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Brussels, January 16th, Overview and status of the project.
WP4 Models and Contents Quality Assessment
Project Cost Management
Software & Software Engineering Pertemuan-4 Dosen :Kundang K Juman
Analysis Capabilities Developed in Support of WTIC Research
The Systems Engineering Context
Demand Control Field Trials
Software Requirements
Object oriented system development life cycle
Engineering Processes
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
Unit 4 - A06 – Review Grade Criteria To get a c
Presentation transcript:

UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered on 17/09/04)

UGDIE PROJECT MEETING Athens September WP6 – Evaluation Results (D13) The Deliverable has been structured as a self standing document The final release (to be issued within 30/09/04) shall include updated information derived from Deliverable D11.2 Verification Report: Test sites description Verification assessment Users feedback

UGDIE PROJECT MEETING Athens September WP6 – Evaluation Results (D13) Part I – general overview of project objectives and assessment approach:  Introduction (origin, objectives and approach of the F-MAN research project)  Users needs and functional requirements specification (how we achieved the requirements specification)  Description of application (summary description of F-MAN architecture, tools and prototype)  Verification and validation approach (summary description of verification sites and related activities)  Phases of development (actual vs. planned timing of project activities)  Assessment objectives (what validation activities focused on)  Validation methods and groups involved in validation  Categories of assessment (functional verification, performance evaluation, potential impacts, users acceptance)  Links among assessment objectives and validation methods (which validation method is relevant to each assessment objective)

UGDIE PROJECT MEETING Athens September WP6 – Evaluation Results (D13) Part II – Results reporting:  Functional Verification:  Functional requirements fulfilment assessment (summary from D11.2 checklists)  Functional tests (summary from D11.2)  Field tests (test sites description and conclusions from D11.2)  Performance Evaluation  Simulation Objectives and limits  Simulator specification  Simulator Implementation  Simulation Scenarios  Simulation Results  Costs-benefits considerations (impacts on daily wagon productivity)  Feedback from Users inside and outside the Consortium

UGDIE PROJECT MEETING Athens September D13 – Performance evaluation  Compared models: Traditional vs. F-MAN Pool management approach  Simulated scenarios  National / Balanced / International traffic composition  Heavy / Relaxed orders frequency  Undersized / Sufficient / Oversized fleet  Performance indicators  Fleet productivity computed on a time basis  Fleet productivity computed on a mileage basis  Percentage of satisfied wagon requests  Percentage of satisfied orders  Wagons cycle time  Daily wagon productivity

UGDIE PROJECT MEETING Athens September D13 – Performance evaluation Some conclusions Example: Heavy traffic, undersized fleet:  F-MAN enhances the exploitation of the fleet, as the loaded mileage (payload) is increased of about 37% in the worst case  F-MAN improves the productivity of the fleet, as the increase of loaded mileage is achieved with a striking reduction of empty mileage with respect to the Traditional management  F-MAN reduces by more than 25% the mean time between successive missions of wagons  Benefits of the F-MAN Pool management approach are remarkable also in scenarios characterised by a majority of domestic traffic (National)  Percentage increase of the daily wagon productivity may range from approximately 40 % up to 80% and more

UGDIE PROJECT MEETING Athens September D13 – Performance evaluation Some conclusions ETA accuracy impact:  Heavy traffic - sufficient fleet: When the accuracy of ETA decreases (simulated through an increase of T wu ), the performances decrease as well, since the number of rejected orders and undelivered wagons increase, while the loaded mileage decreases.  Relaxed traffic – oversized fleet: The decrease of ETA accuracy determines an increase of empty mileage, which is anyway negligible if compared with the loaded mileage, and then also as far as its effects on fleet productivity are concerned.

UGDIE PROJECT MEETING Athens September D13 – Feedback from users inside and outside the consortium