6TH ANNUAL CONFERENCE.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Fairfax County Transportation Funding and Roadway Service Delivery Study Study Update – Transportation.
Advertisements

County of Fairfax, Virginia Department of Transportation 1 Transportation Funding and Improving Roadway Services Delivery Transportation Advisory Commission.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
September 28, 2013 Greg Duncan, Assistant Chief Engineer of Operations Anaheim, CA Performance Based Maintenance Contracting in Tennessee (Experience One.
The Current State of Interstate Maintenance Contracting September 23, 2010 Jake Porter Assistant State Maintenance Engineer (acting)
Turnkey Asset Maintenance Services (TAMS) Contracts Overview
1 BLUEPRINT ORGANIZATION AND STAFFING UPDATE AND STATUS REPORT Virginia Association of Counties August, 2009 DAVID S. EKERN, P.E. COMMISSIONER.
HB 1048 / SB 518 Adjustments for Local Programs May 13, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
Transportation Legislation Overview Presented By: Dwight L. Farmer, P.E. Executive Director/Secretary Hampton Roads Metropolitan Planning Organization.
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
6TH ANNUAL CONFERENCE.
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 How does Virginia Compare to Other States?* 7 * Rankings between 1 and 10 denote top national performance.
October 7, 2013 Gregory Whirley Commissioner 2013 Fall Asphalt Conference.
FY 2015 Revenue Sharing Program Update January 15, 2014 Jennifer B. Debruhl Director, Local Assistance Division.
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Corridor #5 Update United States Senate Briefing September 26, 2007.
THE OHIO RAIL DEVELOPMENT COMMISSION + THE CSX NATIONAL GATEWAY FHWA Talking Freight Webinar April 17, 2013.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8.
Rick Via Statewide Incident Management Program Manager Office: Leveraging Technology & ITS to Enhance Traffic.
Emerging Transportation Technologies in Virginia Ken Earnest Assistant Division Administrator Operations Division.
VACO Conference Transportation Programs Update November 14, 2011 Gregory A. Whirley, Sr. Commissioner.
Green Light-Go Program Pennsylvania’s Municipal Signal Partnership Program April 7, 2015 Daniel Farley Chief, Traffic Signal and Arterial Management Section.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
WVDOT GTI SECTION Status Update for Miss Utility.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
The main rationale behind developing the warranty clause template is to make the prospective contractors implement a maintenance philosophy which would.
UDOT I-15 The Point Design-Build Project
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
1. Concession Agreements The Focus Georgia Conference Thomas W. Pelnik III, P.E. Director, Innovative Project Delivery Division April 26, 2007.
The Virginia Department of Transportation Infrastructure Assets ( The data presented is for illustration purposes only ) November 8, 2000.
Public-Private Partnership Program 2015 Update 2015 American Council of Engineering Companies ACEC – Los Angeles Chapter Luncheon, July 8, 2015.
HB2 Briefing for Tennessee MPOs & TDOT June 11, 2015 Meadowview Conference Center.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
1. 2 Route 895 PPTA (2002) 3 Communication Dilbertian [v. Newtonian] Logic: We know that communication is a problem, but the company is not going to.
Impact of Low Volume Roads Downstream of Dams on Hazard Classification By Robert J. VanLier, P.E. Regional Dam Safety Engineer 900 Natural Resources Drive,
Convergence of Transportation Policy and RFID Enabler of Future Transportation Policy Chris Body Mark IV Vice President, Business Development.
Interstate 95 Corridor Improvement Program June 20, 2012.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
Drive Safe Hampton Roads Thelma Drake, Director September 27, 2013.
Review of Principal Arterial Routes on the National Highway System For MAP-21 Reta R. Busher Chief of Planning and Programming October 17, 2012.
Regional Concept of Transportation Operations: The Hampton Roads Experience Presented by: Camelia Ravanbakht, PhD Talking Technology & Transportation (T3)
DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office.
ZOM A request for a minor amendment to the existing South Pointe PD (Planned Development) 110 acres West Newberry Road.
Advancing bicycling through unified state and local advocacy organizations Thunderhead Alliance 50 States/50 Cities Project Complete Streets Pro Walk/Pro.
Julie Skallman State Aid Division Director & State Aid Engineer.
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Criteria for Secondary to Primary System Transfers Robert W. Hofrichter Assistant Administrator Transportation and Mobility Planning Division.
Sampling Procedure for Performance-Based Road Maintenance Evaluations by Jesús M. de la Garza Juan C. Piñero and Mehmet.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
Preparing VDOT’s GIS data for the Implementation of Bentley Superload Brian Young – GIS Technical Lead (ARS) Paul Bucher – Quality Assurance Officer Jean.
2006 Annual Educational Conference on Outdoor Advertising Cleveland, Ohio Keith C. Melvin, CPM Director of Outdoor Advertising South Carolina Department.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Prospective Rural Additions Meeting JULY 15, 2015.
VDOT’s Operations Program Update and Opportunities July 17, 2015 Dean Gustafson, P.E., PTOE State Operations Engineer Operations Division.
Facing Funding and Weather Challenges: Impact of Weather Events on Treatment Selection and Pavement Condition PPRA Fall Meeting 2014 November 17-19, Baltimore,
Virginia Department of Transportation
September 15, 2016 Todd M. Halacy, P.E., Moderator
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Responsibilities and FUNDING
Current Interstate Maintenance Services Contracts
SMART SCALE Round 3 Joint Commission on Transportation Accountability
Major Initiatives in Hampton Roads
Interstate 95 Corridor Improvement Plan
ADA Transition Plan – Brief Overview
Presentation transcript:

6TH ANNUAL CONFERENCE

Turnkey Asset Maintenance Services (TAMS) Contracts Overview October 2014 Robert E. Prezioso, P.E. Assistant State Maintenance Engineer VDOT Maintenance Division

Turnkey Asset Maintenance Services Contracts: Overview Mandated by Va Code §33.2-301, which requires that (with few exceptions) all maintenance on the Commonwealth’s Interstate roadways will be accomplished under contracts awarded by the Commonwealth Transportation Commissioner and approved by the Commonwealth Transportation Board. Two initial contracts in 2005 and 2006 covered Route I-64 Williamsburg (East) and Charlottesville (West). Four contracts followed in 2007: two in Richmond, one each in Salem and Bristol. 100% of Commonwealth’s Interstate roadway maintenance outsourced in advance of due date of July 1, 2009.

Evolution of TAMS Contracts As of September 2014 there are 13 active TAMS contract segments Four Contracts, I-64 West Culpeper, I-64 East Williamsburg, Richmond South, and Staunton South follow a TAMS contract template which incorporates cost saving modifications while maintaining performance criteria specific to the service area. Five Contracts, Richmond North, Bristol, Hampton Roads, Salem, and Staunton North are managed by VDOT and also follow the new TAMS Contract template as referenced above. The Woodrow Wilson Bridge (WWB) TAMS Contract is unique in that it represents a partnership with the Maryland State Highway Administration. Three existing Northern Virginia contracts, I-95/395, I-495, and I-66, have similar performance and evaluation criteria, based on modifications made as a cost-saving measure by VDOT. The 3 NOVA contracts are slated to expire in March 2015. They will be replaced by four contract segments. The new contracts have been advertised and are expected to be considered for award by the Commonwealth Transportation Board agenda in October 2014.

Evolution of TAMS Contracts Significant Changes to TAMS Contract Management as enacted by VDOT for any forthcoming contracts: The required Maintenance Rating Program (MRP) Evaluation Ratings for all Asset Groups has been raised to 90%. MRP Ratings for individual Asset Items shall be equal to or greater than 70%. A 10% sample of 1/10th mile Interstate roadway segments will be chosen from the total population of 1/10th mile segments on a specific contract. Within each 10% sample, 100% of the assets will be evaluated. The MRP sample population will be stratified so that the Bridge Asset Group will not be underrepresented in the evaluation process. The Deduction Cap of 3% for Timeliness Nonperformance has been eliminated. Some performance measures have also been updated. NOVA contracts include these changes. Example Performance Measure changes Potholes – changed from 6”x6”x1.5” No Potholes Bridges – changed from patching all components  temporary patch riding surface, annual deck washing and bi-annual structure washing Ditches – changed from <10% of length containing obstruction(s) impeding the flow of water  ≤ 20% of x-section impedes flow of water

Current TAMS Contracts Current Contractor Mileage Routes Start Date End Date Term (years) Renewals   TAMS I-64 East ICA 67 CL miles/ 357 lane miles I-64 8/1/2011 7/31/2016 5 2/2 TAMS Salem Salem District 109 CL miles/ 460 lane miles I-81, I-581, SR460, SR220 9/8/2014 TAMS Staunton South DBI 120 CL miles/ 503 lane miles I-81, I-64 TAMS I-64 West TME 88 CL miles/ 374 lane miles 8/15/2010 8/14/2015 TAMS Bristol Bristol District 149 CL miles/ 670 lane miles I-81, I-77, I-381 7/1/2012 6/30/2017 TAMS Richmond North Richmond District 170 CL miles/ 1102 lane miles I-95, I-295, I-64, I-195, SR-288, SR-195, SR-76, SR-150, SR-146 138 CL miles/ 621 lane miles I-85, I-95, I-295 TAMS Hampton Roads Hampton Roads District 691 lane miles I-64, I264,I-464, I564,I664, US58, US17 & others 5/15/2013 5/14/2018 Staunton District 101 CL miles/ 428 lane miles I-81, I-66 TAMS NOVA I-95 / I-395 113 CL miles/ 651 lane miles I-95, I-395 12/15/2008 12/14/2013 I-66 66 CL miles/ 392 lane miles I-66, SR-267 2/15/2009 2/14/2014 I-495 18 CL miles/ 211 lane miles 4/1/2009 3/30/2014 TAMS NOVA Woodrow Wilson Bridge (WWB) 10 CL miles/ 103 lane miles I-95 6/15/2010 6/14/2015

Current TAMS Contracts Work Areas Legend Tams Contract Section VDOT Districts

Turnkey Asset Maintenance Services Contracts: Overview Questions?

Thank You 6TH ANNUAL CONFERENCE