D. R. BettFONT Meeting 10 Feb 20141 Summary of FONT Studies Jan 2014 D. R. Bett.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
D. R. BettFONT Meeting 30 Jan Summary of FONT Studies Jan 2014 D. R. Bett.
Tests of DFS and WFS at ATF2 Andrea Latina (CERN), Jochem Snuverink (RHUL), Nuria Fuster (IFIC) 18 th ATF2 Project Meeting – Feb – LAPP, Annecy.
N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Bunch compression in the ATF2 M. Pivi, A. Seryi, P. T. February 15, 2005 SLAC Feb 2005.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Beamtime Request J. C. Sheppard.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Analysis of ATF EXT/FF Orbit Jitter and extrapolation to IP (Data of ) ATF2 Project Meeting K. Kubo.
D. R. BettFONT Meeting 5 th May Current DAQ State D. R. Bett.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
BPM and Profile Monitor Alignment Debbie Harris in consultation with Wes Smart Peter Prieto Virgil Bocean.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Laser-wire Measurement Precision Grahame Blair Beijing- BILCW07, 6 th February 2007 Introduction Overview of errors Ongoing technical work in this area.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
Active Vibration Stabilization for the NLC Final Focus Quads Josef Frisch, Linda Hendrickson, Thomas Himel, Andrei Seryi,
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
CLIC CTF3: Phase Feed Forward Comparing the effect of the phase feed forward system on beam phase stability with various theoretical predictions. CLIC.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Calibration summary Nov-Dec 09 R Apsimon. 10 Nov 09 Note, the power rail on the FONT5 board wasn’t working properly and so there is no good quality information.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Beam Studies December 2014 Runs: 7821, 7822, and 7860 December 29, 2014.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Drive Beam Feedforward and Compression
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
FACET Tests Update A. Latina, J. Pfingstner, D. Schulte,
Roundup of Week at ATF Mikey Davis 19 April /26.
Further Tracking Studies and March Trip Plan
Resolution Study T. Bromwich FONT 8 September 2017.
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
FONT Meeting 10th February 2011
Firmware Update 29/03/2017 Rebecca Ramjiawan.
Analysis of March ATF Run
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
Transverse Beam Jitter Propagation in Multi-bunch Operation at ATF2
Tolerances on magnetic field along the beamlines from accelerator physics point of view Tentative, suggested for discussion at IRENG07 WG-D meeting, August.
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Beam Optics Set-Up at SLAC End Station A
. - t !!l t. - 1f1f J - /\/\ - ' I __.
Progress towards nanometre beam stabilisation at ATF2
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
Extraction kicker scan & feedback results
Presentation transcript:

D. R. BettFONT Meeting 10 Feb Summary of FONT Studies Jan 2014 D. R. Bett

Shift 1 – 23/01/14 D. R. Bett2FONT Meeting 10 Feb 2014 Run/scan nameDescription Cal loPhase1 jitRun1Large P3 offset jitRun2P3 zeroed K1Cal K2Cal jitRun3-9Part of EPICS added delay scan jitRun10Companion to 0431 set file jitRun11-13Part of EPICS added delay scan longJitRun1-2Long jitter run jitRun14Part of EPICS added delay scan longJitRun3Long jitter run autoLongJitRun1-23DAQ in automatic jitter run mode overwritten_autoLongJitRun_1Not sure autoRunPostRetune_1-18DAQ in automatic jitter run mode jitRun15Companion to 0909 set file

Shift 2 – 24/01/14 D. R. Bett3FONT Meeting 10 Feb 2014 Run/scan nameDescription moverCal1 Phase moverCal2 loPhaseScan2 loPhaseScan3 autoJitRun_1-6DAQ in automatic jitter run mode autoJitRun_NewOptics_1-13DAQ in automatic jitter run mode autoJitRun2_1-8DAQ in automatic jitter run mode detailedLoPhaseScan1 moverCalibration_loPhase detailedPhaseAroundOptimum wideMoverCalibration wideAbsoluteMoverScanRunning out of ideas… RCPSscanP2

Shift 3(i) – 29/01/14 D. R. Bett4FONT Meeting 10 Feb 2014 Run/scan nameDescription loPhase1_1X,3X,5X ZV1Xcal_1X,3X,5X ZV2Xcal_1X,3X,5X ZV3Xcal_1X,3X,5X jitRun1Jitter run jitRun2_addedDelay320Jitter run with added delay in EPICS.vi jitRun3_centeredJitter run with the beam approximately centered in all 3 BPMs ZV1Xcal2_1X,3X,5X ZV2Xcal2_1X,3X,5X ZV3Xcal2_1X,3X,5X jitRun4_centeredJitter run with the beam approximately centered in all 3 BPMs loPhase2_1X,3X,5X jitRun5_1X,3X,5XonSLACJitter run to compare SLAC resolution to FONT resolution

Shift 3(ii) – 29/01/14 D. R. Bett5FONT Meeting 10 Feb 2014 Run/scan nameDescription ZV1FFcal loPhase3 mCal1 K2Cal1 K1Cal1 jitRun6Jitter run fbRun1Coupled loop feedback fbRun2P3-K2 feedback fbRun3P2-K1 feedback

Shift 4(i) – 31/01/14 D. R. Bett6FONT Meeting 10 Feb 2014 Run/scan nameDescription ZV1FFcal loPhase1 mCal1 jitRun1Jitter run K1Cal1 K2Cal1 K1Cal2 K2Cal2 K1Cal3 K2Cal3 K1Cal4 K2Cal4 K1Cal4_repeatas K1Cal4 fbRun1Coupled feedback with nominal optics fbRun2_K1P2P2-K1 feedback with nominal optics fbRun3_K2P3P3-K2 feedback with nominal optics

Shift 4(ii) – 31/01/14 D. R. Bett7FONT Meeting 10 Feb 2014 Run/scan nameDescription fbRun4_K1P3P3-K1 feedback with nominal optics fbRun5_K2P2P2-K2 feedback with nominal optics K1Cal5_0713 K2Cal5_0713 fbRun6_0713Coupled feedback with 0713 optics K1Cal6_0713_P2P3centered K2Cal6_0713_P2P3centered fbRun8Coupled feedback with 0713 optics, beam centered P2 and P3 K1Cal7_0803 K2Cal7_0803 fbRun9_0803Coupled feedback with 0803 optics, beam centered P2, P3, MFB1FF K1Cal8_0823 K2Cal8_0823 fbRun10K1 to MFB1FF feed forward fbRun11K2 to MFB1FF feed forward