LIGO Laboratory / LIGO Scientific Collaboration LIGO-T1000521-v2 Advanced LIGO 13 th March 2014 Final Design Review Documentation and Drawing Overview.

Slides:



Advertisements
Similar presentations
R. Kumar 1, K. Tokmakov 2, A. V. Cumming 1, G. D. Hammond 1, J. Hough 1, S. Rowan 1 1 SUPA, University of Glasgow, Glasgow, G12 8QQ, UK, 2 SUPA, University.
Advertisements

2 mm diameter region 300 micron thermoelastic noise cancellation section Neck region, for transition from 2 mm stock to 300  m fibre 150  m section for.
T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
Cantley, Cagnoli, Crooks, Cumming, Heptonstall, Jones, Martin, Rowan, Hough Development of a CO 2 laser machine for pulling and welding of silica fibres.
LIGO-G D Comments: Staged implementation of Advanced LIGO Adv LIGO Systems 17 may02 dhs Nifty idea: a way to soften the shock, spread cost, allow.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
Silicate bonding on silicon and silica S. Reid, J. Hough, I. Martin, P. Murray, S. Rowan, J. Scott, M.v. Veggel University of Glasgow.
Sean Dalton Solid Edge Draft Solid Edge draft is an environment which allows the creation engineering drawings directly.
LIGO-G D partial ADVANCED LIGO1 Optical Layout Cavity Lengths Input Mode Cleaner (IMC) »IMC FSR = ~9 MHz »Length = ~16.6 m = ~HAM1 to HAM3 separation.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
LIGO-G D Suspensions Design for Advanced LIGO Phil Willems NSF Review, Oct , 2002 MIT.
Development of a CO 2 laser machine for pulling and welding of silica fibres and ribbons D. Crooks for the GEO 600 collaboration Aspen January 2005 LIGO-G Z.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
Low noise Fused Silica suspensions: from the GEO600 experience to the 2 nd generation requirements Geppo Cagnoli INFN Sez. Firenze University of Glasgow.
1 G Mike Smith Gravitational Waves & Precision Measurements.
Reseller Training Miscellaneous Revision Manager Revision Manager Weldments Weldments Tubing Tubing Sensors Sensors Simply Motion Simply Motion Engineering.
Overview of Research in the Optics Working Group Gregory Harry, on behalf of the OWG Massachusetts Institute of Technology July 25, 2007 LSC Meeting –
Planning and Writing Your Documents Chapter 6. Start of the Project Start the project by knowing the software you will write about, but you should try.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Louisiana,
Conceptual Design for Advanced LIGO Suspensions Norna A Robertson University of Glasgow and Stanford University for the GEO suspension team +contribution.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
Update on Advanced LIGO suspension design and technology development towards the quad noise prototype Caroline A. Cantley for Advanced LIGO Suspension.
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
© Mahindra Satyam 2009 Configuration Management QMS Training.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
LIGO-G M Major International Collaboration in Advanced LIGO R&D Gary Sanders NSF Operations Review Hanford February, 2001.
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford.
18 th - 22 nd May 2015 LIGO-G GWADW Alaska Suspension Upgrades: Discussion Points + Questions Giles Hammond (Institute for Gravitational Research,
18 th - 22 nd May 2015 LIGO-G GWADW Alaska Suspension Upgrades for Enhanced Interferometers Giles Hammond (Institute for Gravitational Research,
Monolithic suspension assembly procedure (DRAFT) Status 27 th May 2009 LIGO-T v2.
Prototype Quadruple Pendulum Update – Part 1 Norna Robertson and Calum Torrie University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford,
Update on Activities in Suspensions for Advanced LIGO Norna A Robertson University of Glasgow and Stanford University LSC meeting, Hanford, Aug 20 th 2002.
Thermal Noise performance of advanced gravitational wave detector suspensions Alan Cumming, on behalf of the University of Glasgow Suspension Team 5 th.
Contact: Junwei Cao SC2005, Seattle, WA, November 12-18, 2005 The authors gratefully acknowledge the support of the United States National.
LIGO- G050xxx -00-D Advanced LIGO SUS Installation into BSC Chambers: Mechanical Fixtures Dennis Coyne (with input from many) G May 4 th 2005.
Suspension Thermal Noise Giles Hammond (University of Glasgow) on behalf of the Strawman Red Team GWADW 2012, 18 th May 2012 LIGO-G
Initial and Advanced LIGO Status Gregory Harry LIGO/MIT March 24, 2006 March 24, th Eastern Gravity Meeting G R.
Advanced LIGO UK 1 LIGO-G Z Development issues for the UK Advanced LIGO project Caroline Cantley Glasgow University for the UK Advanced LIGO Team.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
C1) K. Tokmakov on behalf of the Advanced LIGO Suspensions Team Monolithic suspensions of the mirrors of the Advanced LIGO gravitational-wave detector.
Monolithic suspensions in Virgo Helios Vocca Dipartimento di Fisica & INFN di Perugia LIGO-G Z.
Proposal for baseline change from ribbons to fibres in monolithic stage Mark Barton for the IGR Monolithic Team Systems Meeting 16 April 2008 G
ALIGO 0.45 Gpc 2014 iLIGO 35 Mpc 2007 Future Range to Neutron Star Coalescence Better Seismic Isolation Increased Laser Power and Signal Recycling Reduced.
Design and Testing of a Silicon Suspension A. Cumming 1, G. Hammond 1, K. Haughian 1, J. Hough 1, I. Martin 1, R. Nawrodt 2, S. Rowan 1, C. Schwarz 2,
Modelling and Testing of Cryogenic Suspensions Giles Hammond Institute for Gravitational Research SUPA University of Glasgow on behalf of the KAGRA suspensions.
LIGO-G D Core Optics Components (COC) Polishing Pathfinder Kickoff Advanced LIGO Project GariLynn Billingsley Caltech.
ALIGO Monolithic stage Giles Hammond, University of Glasgow for the Advanced LIGO Suspensions Team aLIGO/aVirgo Workshop Pisa, Italy 23 rd -24 th February.
Overview of monolithic suspension work for Advanced LIGO Mariëlle van Veggel, Mark Barton, Tim Bodiya, Alan Cumming, Liam Cunningham, Giles Hammond, Gregg.
Status of the cryogenic payload system for baseline KAGRA Rahul Kumar 1, K. Craig 2, K. Yamamoto 2, H. Tanaka 2, T. Miyamoto 2,T. Kajita 2, T. Suzuki 1,
1 Advanced Virgo Monolithic Payloads P.Rapagnani Thermal Noise Workshop 2012_02_24-25.
Practical considerations for quad suspension upgrades Giles Hammond, Norna Robertson, Travis Sadecki, Brett Shapiro, Betsy Weaver G v3.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Update on the Fused Silica Suspension for Advanced LIGO Giles Hammond, on behalf of the Suspension Team L-V Meeting, Amsterdam, 22 nd -25 th September.
Assembly of the KAGRA 4-fiber sapphire prototype suspension
Characterization of Advanced LIGO Core Optics
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
Studies of some properties of Hydroxide-Catalysis Bonds
Good Morning  Please be sure to take care of your belongings.
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Advanced LIGO Quad Prototype Janeen Romie LSC, March 2004
Gingin Advisory Committee Meeting 08 Dec 2009
Nergis Mavalvala MIT IAU214, August 2002
Getting Started with Git and Bitbucket
Characterisation of the aLIGO monolithic suspensions
Auxiliary Optics System (AOS)
SNS PPU Cryomodule Thermal Shield
R&D in Glasgow MATERIALS ACTIVITY AIM Silica
Presentation transcript:

LIGO Laboratory / LIGO Scientific Collaboration LIGO-T v2 Advanced LIGO 13 th March 2014 Final Design Review Documentation and Drawing Overview A. S. Bell, R. Jones, M. Van Veggel Institute for Gravitational Research, University of Glasgow Distribution of this document: LIGO Scientific Collaboration This is an internal working note of the LIGO Laboratory. California Institute of Technology LIGO Project – MS E. California Blvd. Pasadena, CA Phone (626) Fax (626) Massachusetts Institute of Technology LIGO Project – NW Albany St Cambridge, MA Phone (617) Fax (617) LIGO Hanford Observatory P.O. Box 159 Richland WA Phone Fax LIGO Livingston Observatory P.O. Box 940 Livingston, LA Phone Fax Institute for Gravitational Research University of Glasgow Kelvin Building Glasgow G12 8QQ Phone: +44 (0) Fax: +44 (0) Web:

Final Design Review Documentation and Drawing Overview Colour coding Review documentation directly linked to file Review documentation linked to another slide Referenced documentation directly linked to file Referenced documentation linked to another slide Document change log: Pre-v1 – first draft for circulation in fibre group meeting This presentation is designed to allow one to follow the documentation path down an assembly by clicking on an item. In PDF format this will not work, but one can still navigate manually to the same place

Top-level break-down documentation T Monolithic Stage Final Design Document Preparation masses Design requirements docs Monolithic Assembly Docs Fibre pulling and welding

Design requirements docs T Universal sus subsystem design requirements T v1 aLIGO sus system conceptual design T aLIGO systems design T Low-frequency cut-off aLIGO In PDR T was referenced, document was updated to T in Apr 2008  change impact monolithic unknown Further update in 2012 to T  no impact on monolithic In PDR T was referenced, document was updated to T in July 2008  no changes impacting monolithic In PDR T was referenced, document was updated to T in Feb 2006  no changes impacting monolithic  has not been updated to incorporate baseline change to fibres Link now to new DCC version –v1 identical to -05 Design requirement docs M Change baseline to tapered fibres M E/ITM and BS/FM pitch frequencies and d-values This document has been updated to take account of the note on revision d- distances by Ken Strain T v1 T v1 This document followed document T :T : Proposal baseline change from ribbons to fibres

Preparation masses Preparation masses Drawings and parts of monolithic assembly Mass preparation procedure documentation Tooling for bonding

Fibre pulling and welding T CO2 Silica Fiber Pulling Machine description E Hazard Analysis for Fiber Pulling & Welding E Monolithic stage fabrication and assembly procedure Fibre production and preparation Welding Fibre pulling and welding T050213T ETM/ITM Monolithic Stage Fabrication and Assembly

Mass preparation procedure documentation E ETM/ITM mass preparation procedure E ETM/ITM PUM preparation procedure Mass preparation procedure documentation NOTE: 1. Procedures have been tested extensively at LASTI for the prototype quadruple suspension. Document T describes bonding of the ears onto the ITM and PUM at LASTI and gives insight in the bonding of the prisms using VacSeal adhesive. The bonding of the magnet flag assemblies at LASTI is described in T080245T T E Generic bonding procedure E First Contact procedure E Jig settings calculation spread sheet

Drawings and parts of monolithic assembly Drawings and Parts of monolithic assembly Ears Break-off Prisms Substrates Magnet flags D ETM bonded assembly D ITM bonded assembly D ETM PM bonded assembly D ITM PM bonded assembly

Tooling for bonding D Ear bonding jig D V-block assembly Tooling for bonding D Prism holder assembly

Substrates ETM-PM Design Specification: E B Drawing: D B DCN: E B Design Specification: E B Drawing: D B DCN: E B ITM-PM NOTE: 1.DCN documents include reverence to support notes constructed in the lead up to the review to track changes to features of the drawings/specs. (T , and T ) 2. T lists questions from the review, and the answers supplied by Glasgow. 3. UK Glass masses FDR overview document : T080098T ITMETM Polishing Specification: E Drawing: D v3 DCN: E Polishing Specification: E Drawing: D v3 DCN: E Substrates US UK

Ears T v3 Fabrication Readiness Review Panel questions at review: T v1T v1 Response to panel Questions in FDR:T v2T v2 Ear fabrication readiness review report: L v3L v3 Ears D ETM/ITM test mass ear D ETM/ITM PUM ear (with recess) Quality control documentation: Forms to be filled in by the vendor consists of a dimension control sheet and a surface defects sheet: F The vendor is also required to supply a flatness measurement of the bonding surface

Break-off Prisms Design Document: E Drawing: D v3 – on DCC Quality control documentation will have a similar layout as the quality control documentation written for the sapphire wire break-off prisms for the BS/FM (Q ). D v3 ETM/ITM PM Break-off prisms

Magnet flags Drawings and parts: D – PUM magnet flag assembly D – PUM magnet holder D – magnet flag mount D – magnet base D – steel disc D – 2 mm dia x 6 mm magnet D magnet base (glass) D PUM Magnet flag assembly Magnet flags

Fibre production and preparation Fibre production and preparation Fibre design file Pulling Machine Data Set (text file) T Design Document Theoretical and actual profiles D Headline Description/Manual: T T Design Document Drawings: D Overall Assembly D Overall Assembly (Drawing Pack) – needs to be updated to remove subassemblies no longer in use, and to refresh the machine configurations. Characterisation Profiler Proof Tester & Bounce Tester Storage Rack

Fibre characterisation Profiler T Manual/ Design Document D070524D Ribbon/Fibre Profiler Lighting Assembly D070523D Ribbon/Fibre Profiler Base Tower Assembly D070533D Ribbon/Fibre Profiler Upper Clamping Frame Assembly D070521D Ribbon/Fibre Profiler Camera Assembly D070520D Ribbon/Fibre Profiler Base Assembly D070519D Ribbon/Fibre Profiler Overall Assembly Proof / Bounce Tester T Manual/ Design document List of Drawings D D Proof and bounce tester enclosure D D Proof and bounce tester door D D aLIGO SUS UK bounce tester D D aLIGO SUS UK proof tester Strength Tester (2009) T Design Specification List of Drawings LIGO-D (Original) Strength Tester (2002) Assembly Drawing (on DCC and PDM Works: LIGO-D

Welding Welding Documentation Overview procedure document Training Regime T List of Parts & Drawings Tooling List Weld mirror assemblies D Fibre Cutter D Bow (Fibre Holder) D Storage Rack LIGO-D v3 Diamond scribes DR 60 refil Fuse ends D Fuse end bonding jig D Welding Shelf D080036D / D D Jack D Welding Head (BIRDCAGE) D Laser Synrad Firestar f100 Articulated Arm Weld Scaffold D Computer Software T Computer Hardware Weld Test Evidence e.g. G and G G G Vapour Extraction Some of the parts on this list e.g. “Jack D ” and “Vapour Extraction” have been updated and current versions have not been captured in this document

Fibre Guard Prototype List of Drawings D Fibre Guard Assembly all parts D Fibre guard assembly D Fibre guard Main Body D Fibre guard Separator D Fibre guard angle section 1 D Fibre guard angle section 2 D Fibre guard angle section 3 D Fibre guard angle section 4 D Fibre guard angle section 5 D Fibre guard angle section 6 D Fibre guard angle section 7 D Fibre guard angle section 8 D Fibre guard angle section 9 D Fibre guard angle section 10 D Fibre guard angle section 11 Fibre Guard Design Document: T T Fibre guard

Appendix: Notes related to design review in 2005 Top level overview document: T K_Monolithic stage conceptual design.doc Monolithic assembly procedure: T050213_00_K_ETM_ITM_Monolithic_Fabrication_and_Assembly All other documents: T _R&D Plan T K_Bond Thermal Noise T D_Alignment_of_Ears T K_Optical Profiling T K_alternative to wire loops T K_ribbon tolerances & alignment T K ribbon ear interface T K_Ribbon Characterisation T K ear position & angular alignment T K_Update on Development of a CO2 Laser Machine for pulling of silica fibres and ribbons