Summary of session 3: Optimise Interventions and Recovery from Collateral Damages on Cold Sectors Prepared by Caroline Fabre & Pierre Strubin Based on.

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

ColUSM #51 30 th January, 2015 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, Q. Deliege, V. Baglin, F. Savary.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Session 3 - What repair activity can be done today on a locally warmed-up sub-sector Paul Cruikshank TE/VSC What repair activity can be done today on a.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
Road map of the workshop Machine availability: – “work-horse” in the injection chain – 100% availability not viable,.What is achievable? And at which cost?
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Consolidation and Upgrade plans for the LHC Vacuum System
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
CHAMONIX XV QRL installation and first experiences of operation G. Riddone on behalf of the QRL team AT/ACR-cd Acknowledgements to AT/ACR-op and AT/ACR-in.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
TE-CRG Activities D. Delikaris, TE-CRG.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Roadmap for triplet cryostats
IT-4189 Supply and installation of a cryogenic distribution system
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
The LHC - Status Is COLD Is almost fully commissioned
Long Shutdown for the LHC: Vacuum Beam Pipes
Consequences of warming-up a sector above 80 K
Keeping LHC cold during LS periods Preliminary proposal
Hollow e- lens, Cryogenic aspects
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
J.M. Jimenez On behalf of TE-VSC group
ILC Cryogenic Systems Draft EDR Plan
The 11T cryo-assembly: summary of design and integration aspects
Block 4 and Cluster D - Safety
On behalf of TE-VSC group
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Cryogenic management of the LHC Run 2 dynamic heat loads
HL-LHC New MS optimisation WP9, Preliminary cost estimates
Presentation transcript:

Summary of session 3: Optimise Interventions and Recovery from Collateral Damages on Cold Sectors Prepared by Caroline Fabre & Pierre Strubin Based on presentations by: Vincent Baglin Can we optimise the cleanup process further? Rob van WeelderenWhat is the MCI in case of a “beam driven” failure of a magnet enclosure? José Miguel JimenezMeans to limit the colateral damages in the beam vacuum chamber Paul Cruikshank What repair activity can be done today on a locally warmed-up sub-sector? Serge Claudet Can we change a magnet without warming-up a full arc? Gérard Ferlin Decoupling of adjacent cryogenic sectors

Can we optimise the cleanup process further? Inspection and documentation – After sector 3-4 incident: 4.8 km of beam lines and 212 interconnections have been inspected by endoscope and documented Special tooling was developed Initial version of “vacuum cleaner” Improved with the attachment of an endoscope 5 February 20102Chamonix 2010, summary of session 3 Vincent Baglin

Can we optimise the cleanup process further? Use a combination of “blowing” and “sucking” to clean MLI debris More special tooling – “Chimney” sweeping tool to remove soot Definition of acceptable cleanliness – 1 fibre per half-cell 82 half-cells to clean – 2 debris (MLI or other less than 1 mm2) per magnet 304 beam tube magnets to clean Automatic pumping/venting based on RF ball technology 5 February 20103Chamonix 2010, summary of session 3 Vincent Baglin

Can we optimise the cleanup process further? What was achieved – ~ 3 months were required to set up the process – ~ 3 months were required to cleanup the sector Cleaning rate: ~ 50 m / day / team, of which 3h 15 min for PIMs! Many difficulties to overcome – Completely new situation Did not know what would be found – Debugging of tools – Many co-activities 5 February 2010Chamonix 2010, summary of session 34 6 sets of tooling now “on the shelf” Could now be done in less than 3 months, but we hope we will never have to redo it… Vincent Baglin

What is the MCI in case of a “beam driven” failure of a magnet enclosure Assumptions – Beam driven hole between beam pipe and cold mass – Flow rate estimated by sound velocity limit of the escaping helium through the slits formed by the magnet laminations Slit area is 3.23 cm2/m (0.2 mm gap per 6.2 mm length, 10 mm hole width) – ~ 161 slits per meter length – The specific discharge values will be determined by the state of the helium at the hole location and thus by the physical process taking place in the cold masses  From the discussion: mass flow could be larger if the beam punches the magnet end 5 February 2010Chamonix 2010, summary of session 35 Rob van Weelderen

Observations after a quench – At about (3-4 bar, 3 K) one leaves the adiabatic/isochoric phase area, i.e. after about 15 s – For this first 15 seconds we will see a high specific discharge rate (~4 kg/s cm 2 / ~10 kg/s m of lamination) – After that the rate will decrease by an order of magnitude (~0.7 kg/s cm 2 / ~1.7 kg/s m of lamination)  When neighbour magnets are quenched, average long term discharge is significantly more gentle than first few seconds. What is the MCI in case of a “beam driven” failure of a magnet enclosure 5 February 2010Chamonix 2010, summary of session 36 In view of this wide range of possible mass flows, specific cases of reasonable beam damage will now have to be defined in order to evaluate the beam pipe pressure rise effect Rob van Weelderen

Means to limit the collateral damages in the beam vacuum chamber Vacuum system designed to cope with small leaks – Welds, seals, feedthroughs, holes in beam screen capillaries, etc. – Based on risk analysis of cryogenic system (LHC-project note 177) – Similar incident in the string did unfortunately not “ring the bell” Initially foreseen protections of beam vacuum – Arc Rupture disks (30 mm aperture) at each arc extremity (~ 3 km) No vacuum sectorisation ! – Standalone magnets (SAM) Rupture disks (30 mm aperture) available at extremity of each SAM Vacuum sector valves at each extremities (isolate from the warm vacuum sector) – Long straight sections room temperature vacuum sectors Vacuum sector valves (sectors at RT can always be isolated from SAM) – Experimental areas Vacuum sector valves at Q1 (each side) and to isolate the central beam pipes Pressure relief valve (only in LHCb Velo) 5 February 2010Chamonix 2010, summary of session 37 José Miguel Jimenez

Means to limit the collateral damages in the beam vacuum chamber Protecting bellows against over-pressure – Add more rupture disks – Add 2 half-shells in Vetronite or equivalent around the bellows Increase resistance to plasma discharge (high temperature resistance) Avoid damages induced by the projections of melted metal Also helps limiting the injection of MLI in the beam vacuum Protecting against pressure front and debris – Fast-closing valves Shall not be necessarily leak tight Shall close within ms Use a low-Z material for the sealing plate Requires reliable interlock signals – Beam loss monitors – Pressure gauges or nQPS in the absence of circulating beams 5 February 2010Chamonix 2010, summary of session 38 New development, needs thorough risk analysis, validation and tests José Miguel Jimenez

What repair activity can be done today on a locally warmed-up sub-sector? Local warm-up was foreseen in the baseline – For repairs at interconnects on cold mass volume (diode, busbar, splice, helium leak, IFS, line N) or instrumentation – BUT NOT – For repairs on beam vacuum or circuits without valves (line c’,k,e,x,y) Experience gained – Change of flexible hoses on DFBAs in sector 4-5 in February 2010Chamonix 2010, summary of session 39 n n-1n-2n+1n m  Scenario from LHC Project Report 60, Sept 2000 n-2….floating, cold, under vacuum n-1thermal buffer, RT, under vacuum n intervention, RT, vented, W opened 642m (23%) at RT n+1thermal buffer, RT, under vacuum n+2….floating, cold, under vacuum Paul Cruikshank

What repair activity can be done today on a locally warmed-up sub-sector? Revisited scenario – Goals: Minimise number of PIMs which undergo thermal cycle to RT Ensure access to PIMs which undergo thermal cycle to RT Expect shorter intervention time w.r.t. a sector warm-up ? – Issues : No thermal buffers - cold interfaces at sub-sector extremity ? Can a failed PIM be changed with arc still cold – venting & backstreaming ? 5 February 2010Chamonix 2010, summary of session 310 n n-1n-2n+1n+2 214m N2 gas QQBI interconnect Warm-up arc to 100 K Warm-up last SSS by circulating warm nitrogen in the beam pipe, validated in SM18 on SSS513 Paul Cruikshank

What repair activity can be done today on a locally warmed-up sub-sector? Protect beam vacuum against condensation – Flow N 2 or Ne through the beam pipe to avoid retro-diffusion A flow of 5mm/s outflow is sufficient to avoid backstreaming > 0.5 m PIM inspection with endoscope done under Ne flow in 2-3 and 8-1 Protect SSS extremity against condensation and freezing The X-ray tomograph is here – Venting + endoscopy not required to check PIMs …. venting only if damaged PIM 5 February 2010Chamonix 2010, summary of session 311 Potential gain of 2 weeks with respect to a full sector warm-up: 53 instead of 69 days but very delicate operation when beam vacuum has to be opened and blown through! Paul Cruikshank

Can we change a magnet without warming up a full arc? The LHC sub-sectorisation baseline tells you: NO ! – Cold Mass, Line N: OK as according to baseline (sectorised) – Line X/Y (bayonet HX), Line C’ (cooling intercept), Line E (thermal shield): Air would reach cold surfaces in the cold sub-sectors and get trapped However probably possible – Based on local warm-up methods developed to protect beam vacuum 5 February 2010Chamonix 2010, summary of session 312 – Warm-up of concerned sub-sector to 300K, and adjacent right to 100K (then GN2 bag against condensation) – Most likely a 2nd sub-sector to be warmed-up, as ELQA of Line N requires so far to access 4 boxes (3 x 54m) Serge Claudet

Can we change a magnet without warming up a full arc? Provided that: – Cutting is made with little over-pressure to prevent air contamination – Temporary caps are placed on opened pipes – We can develop tools and procedures for welding sleeves without entering massively air in the pipes 5 February 2010Chamonix 2010, summary of session 313 Preliminary stage  worth to continue study! Serge Claudet

Decoupling of adjacent cryogenic sectors Present sectorisation does not allow exchanging a magnet or a QRL service module in a sector while keeping the adjacent sector in nominal cryogenic operation. Requirements for intervention on one sector: – Safety: sector locked-out from pressure and gas flow – Cryo operation: cold valves protected from air and moisture condensation Principle solution – For each circuit: 2 valves locked-out with helium gas buffer in between  True for all circuits except Header B (GHe pumping line, 15 mbar, 4K) Proposed option 1 – Adding a DN250 valve on header B would allow safe intervention on sector while keeping the adjacent one cold – However the cooling plant redundancy is lost (during intervention) 5 February 2010Chamonix 2010, summary of session 314 Gérard Ferlin

Decoupling of adjacent cryogenic sectors Proposed option 2 – Adding a new valve-box on QRL junction region would, in addition, allow to preserve cryoplant redundancy 5 February 2010Chamonix 2010, summary of session Both options require validation of design and integration study - Implementation requires full warm-up of the 2 adjacent sectors Gérard Ferlin

Conclusion Consolidation of MCI and corresponding protecting devices in case of full beam lost in a magnet Many efforts developed to try and find solutions while deviating from the baseline scenarios and risking to endanger vacuum and cryo operation availability ! Principle solutions allowing interventions after local warm-up presented  now more detailed studies needed Next steps: – Define how far we should go in sectorization – Draw-up table with benefits and drawbacks 5 February 2010Chamonix 2010, summary of session 316