INTRODUCTION to the INTERNATIONAL JOINT COMMISSION United States - Canada for Representatives from the Government of Mozambique James Chandler Frank Bevacqua.

Slides:



Advertisements
Similar presentations
FASRB and the Water Risk Management Samo Grošelj Deputy Secretary, ISRBC.
Advertisements

The Free Market, Environmental Stewardship, and Rule of Law Lecture 1 of 3: Background Facts on Water as a Resource.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
Alberta’s Strategy for Sustainability presented to Prairie Water Policy Symposium Beverly Yee, Assistant Deputy Minister Alberta Environment September.
Dr. Gail Krantzberg, Director Centre for Engineering and Public Policy, McMaster University, Hamilton, Ontario Great Lakes Great Responsibilities.
Chinese – EU cooperation on water - Partnerships on Water Challenges 2014 CEWP High Level Conference, 4 th December 2014 Marta Moren Abat DG ENVIRONMENT,
PRESENTATION SUMMARY Introduction – Living with the Red Introduction Introduction – Overview (Mike Ryan) Geography Geography – Living with the Red (M.
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
Revised Draft Annex Implementing Agreements July-August 2005 Office of the Great Lakes Department of Environmental Quality.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
CLIMATE CHANGE AND POTENTIAL IMPACTS ON GREAT LAKES WATER LEVELS WHAT CAN WE DO? Chicago, Illinois March 30, 2001 Presentation By: Wayne A. Smith Vice-President.
GREAT LAKES WATER MANAGEMENT UNDER A CHANGED CLIMATE FRANK H. QUINN Great Lakes Environmental Research Laboratory Ann Arbor, Michigan.
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
On the collection and use of environmental information in transboundary water management: The case of Lake Constance Susanna Nilsson & Sindre Langaas,
Water Resources In the United States: Perspectives and Challenges by Dr. Jerome Delli Priscoli Institute for Water Resources US Army Corps of Engineers.
Colorado Basin Water Conference Dr. Tim Casey, Professor of Political Science Colorado Mesa University.
International Workshop on Institutional Capacity Development in Transboundary Basins, November 2008, Bonn, Germany Governance and Institutional Arrangements.
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
Lake Superior Binational Program and Lakewide Management Plan Lynelle Hanson Lake Superior Binational Forum Meeting Ashland, Wisconsin March 23, 2012.
The Nile Equatorial Lakes Subsidiary Action Program (NELSAP) A New Approach to the Joint Management of River Basins in the NEL Region.
In the Name of God, Most Gracious, Most Merciful.
International Lake Ontario – St. Lawrence River Study New Study Release Today Study Board Offers Three New Options for Regulating Water Flowing From Lake.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
The International Joint Commission, Sustainability, and Great Lakes Water: A Historical Appraisal Dr. Daniel Macfarlane Environmental and Sustainability.
GEOSS Great Lakes Testbed connection to Adaptive Management
Columbia River Treaty Review British Columbia Perspective Northwest Hydroelectric Association 2013 Annual Conference Portland, Oregon February 20, 2013.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
BIODIVERSITY CONSERVATION, AND ADAPTATION ASPECTS IN NATIONAL STRATEGIES ON POVERTY REDUCTION (NS- PR), SOCIO-ECONOMIC DEVELOPMENT PLAN (SEDP)
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes A unique framework for improved management of shared waters.
THE RHONE RIVER BASIN Alex Houston February 23, 2012.
2 International efforts to coordinate Mekong water development started in 1920s – Series of international agreements mainly for navigation and boundary.
Who We Are What I Do Great Lakes Commission. Great Lakes Basin.
Great Lakes Perspective Samuel W. Speck Chair, Water Management Working Group Council of Great Lakes Governors Chair, Great Lakes Commission Director,
Issues surrounding the Red River Flood of Outline Introduction Impacts of the flood Flood protection works Manitoba Water Commission (MWC) Current.
Management of the Great Lakes by the U.S. and Canada Presented by Johnny Sullivan March 6, 2012.
Managing the Great Lakes— St. Lawrence River Basin David Naftzger, Executive Director Council of Great Lakes Governors (312)
Kitsap County Department of Community Development Updating Kitsap County’s Shoreline Master Program (SMP) – process overview, public outreach, involvement.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
Drinking Water Source Protection Ministry of the Environment Source Protection Programs Branch March 2010.
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
1 Cameron Davis Senior Advisor to the Administrator, U.S. EPA Commission for Environmental Cooperation Joint Public Advisory Committee Public Forum on.
Joint bodies according to the UNECE Convention on the Protection and Use of Transboundary Watercourses and International Lakes Francesca Bernardini United.
Columbia River Basin Governance in Transition Public Workshop on the Columbia River Treaty October 7, 2015.
The Mekong River Commission: Challenges, Mission, and Strategies.
Challenges, results and experience with cross-border cooperation - local and national level impacts - DRIMON and Transboundary Prespa Lake Basin Crossing.
Lake Management in Alberta. Lake Issues ~2500 lakes in total with 800 fish-bearing lakes in Alberta Many lakes have changed due to Watershed alteration.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Reclamation and Hoover Dam It’s All About The Water.
57th Annual Meeting of the GLFC Buffalo, NY June 6-7, 2012 Water Level Regulation in the LO/SLR System Environmental Considerations and Plan BV7.
Lessons of Experience __ Longstanding Multi-country Institutions The Role of the IJC and the Development of a Binational Regime in Relation to the North.
Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation and Mongolia First year budget Dr. Sergey Kudelya.
International St. Croix River Watershed Board
Task Force Activities We are working together on a new approach that identifies sources of PCBs and dioxins, directly applies a plan for reduction and.
Air Pollution Prevention
Water – The Essence of Life
Challenges in a Changing World
2015 Osoyoos Lake Water Science Forum Thursday, October 8, 2015
The 1st Draft of Thailand National Adaptation Plan
Lessons of Experience __ Longstanding Multi-country Institutions
The Water Framework Directive: Challenges, Threats and Opportunities
Challenges in a Changing World
Transboundary cooperation in the Dniester River basin
Eric Ellis Habitat Restoration Senior Program Specialist
Presentation transcript:

INTRODUCTION to the INTERNATIONAL JOINT COMMISSION United States - Canada for Representatives from the Government of Mozambique James Chandler Frank Bevacqua October 9,

Agenda The IJC –Authorities –Organization Great Lakes Water Quality Great Lakes Water Levels Great Lakes Water Uses Other Transboundary Activities Summary

United States

The IJC in Brief A Unitary Treaty Organization Six Commissioners -Serve without Instructions Decides by Consensus Operates from Yukon to Gulf of Maine Controls Flows in Boundary Waters Prevents and Resolves Disputes Over Shared Water and Air Watchdog of Great Lakes Restoration Efforts Conducts Studies for Governments

Boundary Waters Treaty of 1909 Provided Principles and Mechanisms to Prevent and Resolve Disputes Concerning Water Quantity and Water Quality and Other Environmental Issues Along the U.S.-Canada Boundary Freedom of Navigation in Boundary Waters Required Approval of the IJC or the Two Federal Governments for Projects that Affect Levels and Flows in Boundary Waters

Boundary Waters Treaty of 1909 cont. In Transboundary Rivers, Upstream Country Controls Flows that would Cross Boundary, but Downstream Country needs International Approval for Dams that Raise Water Levels Upstream of the Boundary Pollution Causing Transboundary Injury is Prohibited Established the International Joint Commission (IJC)

Other IJC Authorities Great Lakes Water Quality Agreement of 1978 References from Governments Orders in Response to Applications Columbia River Treaty Rainy Convention Lake of Woods Convention

International Joint Commission Principles of Operation Operation Without Instructions from Governments Balanced Membership: –Three Commissioners From Each Country –Equality on IJC Boards and Working Groups Service in Personal and Professional Capacity Good Science - Joint Fact Finding Full Public Involvement

Mary Gusella Tom Baldini Jack BlaneyRobert Gourd Commissioners

IJC Organization Commissioners US Section Washington Canadian Section Ottawa Great Lakes Regional Office (Windsor, ON) Boards of Control - Combined Boards Investigative Bodies Pollution Surveillance Boards Great Lakes Water Quality Institutions

Boards and Task Forces BOARDS of CONTROL/COMBINED BOARDS/POLLUTION BOARDS International St. Lawrence River Board of Control International Niagara River Board of Control International Lake Superior Board of Control International Osoyoos Lake Board of Control International Rainy Lake Board of Control International Rainy River Pollution Advisory Board International Lake of the Woods Board of Control International Kootenay Lake Board of Control International Columbia River Board of Control International Air Quality Advisory Board International Red River Board * International St. Croix River Board * International Souris River Board * * Newly Combined Boards GREAT LAKES WATER QUALITY Great Lakes Water Quality Board Great Lakes Science Advisory Board Council of Great Lakes Research Managers INVESTIGATIVE BODIES Health Professionals Task Force St. Mary-Milk Rivers Accredited Officers Lake Ontario-St. Lawrence Study Board Upper lakes Plan of Study Team

The Great Lakes 20% of World’s Fresh Water Inland Navigation Highway Power Source for Industries Water Source for 40 Million Natural Treasure Recreation Centerpiece Threatened by Pollution Challenged by Demand

Great Lakes Water Quality Binational GL Water Quality Agreement –IJC Watchdog – Parties Implement –IJC Biennial Report to Governments Issues –Restoration Adequate Funds (>$6B) -Defined Program Role of Air Pollution –Aquatic Nuisance Species Standards Federal Action Gap –Emerging Issues Groundwater Urban Sprawl –Review of the Agreement

Great Lakes Water Levels Water Level Shifts –Highs - 70s-90’s –Lows - 60’s, Impacts –High Levels Shoreline Erosion - Flooding - Cross-currents –Low Levels Hydropower - Navigation - Recreational Boating - Environment Actions - Review of IJC Orders –$20 Million St. Lawrence-Ontario Study –Proposed Upper Lakes Study Unknown - Climate Change Elev. IGLD1985 (Feet) Lakes Michigan-Huron 1960

Upper Lakes Lake Ontario-St Lawrence

LAKE ONTARIO - ST. LAWRENCE RIVER MOSES SAUNDERS HYDRO PROJECT CAPE VINCENT KINGSTON OGDENSBURG PRESCOTT CORNWALL MONTREAL ST. LAWRENCE RIVER LAKE ERIE NIAGARA R. OTTAWA RIVER TORONTO ROCHESTER OSWEGO

St. Lawrence-Lake Ontario Study Background St Lawrence River Projects Authorized by IJC in 1952 under Boundary Waters Treaty Current regulation - Orders of Approval as Amended in 1956 Treaty Interests: Navigation, Water Supply, Hydropower, Purpose of Study: Review Regulation to Ensure Appropriate Treatment of Existing Interests and Consideration of Environmental Factors Recreational Boating and Related Interests Actual Water Supplies Received Climate Change and Variability

IJC U.S. & Canadian Co-Directors Study Board - 14 members U.S. & Canadian Study Managers & Public Affairs Officers Technical Work Groups Environmental Recreational Boating/ Tourism Hydrologic Models, Clim. Change & Eval. Coastal Zone/ Shore Interests Commercial Navigation Domestic, Industrial & Municipal Water Hydroelectric Power Common Data Needs Plan Formulation International Lake Ontario-St. Lawrence River Study Public Interest Advisory Group Members (U.S.-Canadian) appointed by IJC in consultation with the Study Board DirectConsultative

Upper Lakes Study Background Current regulation of Lake Superior - Orders of Approval as Amended in 1979 Identified Interests: Navigation, Water Supply, Hydropower Purpose of Study: Review Regulation to Ensure Appropriate Treatment of Existing Interests and Consideration of: Environmental Factors New Interests Actual Water Supplies Received Climate Change and Variability Technological Advances

NOVA

Great Lakes Water Uses IJC Study – Protection of the Waters of the Great Lakes –No Surplus – Threat from Near-basin Communities –Protect Integrity of Waters Diversions Consumptive Use –Need ‘No Discrimination’ Standards – NAFTA/GATT/Commerce Clause –Governors/Premiers Prepare Standards “…without prejudice to authority of federal governments”

Great Lakes Water Uses Ongoing Actions States/Provinces –Annex Diversions –Information Systems Improvements –Cumulative Impact Analysis Federal –IJC 2003 Review of Progress –IJC 10-year Review of Water Use

International Transboundary Watershed Boards Outgrowth of IJC and 21 st Century –Bring Together Transboundary Ecosystem Interests –Alert, Assess, Report

International Transboundary Watershed Boards 1998 Reference to IJC –Concept Has Merit –Examine Border Areas for Feasibility –Recommend Pilot Board IJC December 200 Report –Reaction on Border Mixed –IJC Combining Boards as First Step –Red River Recommended as Pre-pilot Board –Resources Will be Required

Transboundary Pollution Red River Floods The Red River Basin

The Red River Flood of 1997 >$4 Billion (US) Damages $ >$2 Billion (US) Federal Flood Recovery Costs >100,000 People Evacuated 4 Major Communities Flooded Grand Forks Population Dropped by 8% Winnipeg Spared by Centimeters Largest Canadian Military Deployment since Korean War

Study Conclusions - The Flood Flood Was Natural Event Equal or Larger Floods Can Be Expected in Future –Paleo-Analysis –Historical Records Flood People and Property at Risk –Winnipeg –Cities and Villages

Study Conclusions - Necessary Actions Development of Comprehensive Binational Basin Plan Use of Balanced Approach - No Single Solution Will Solve Problem - - Reservoirs - Micro-Storage - Wetlands - Levees - Relocations

Souris River Basin

International Souris River Board Combining Board & WQG –Quantity – IJC –Quality - Governments Small Membership – Enlarge? Flood Concerns- Flood Report Lake Metigoshe Federal-State- Provincial Tensions

Rainy River Basin

Rainy-Lake of the Woods 1925 Lake of the Woods Convention and Protocol –International regulation - ILOWCB - only for water levels greater than 1061 ft or less than 1056 feet –2001 concerns over high water, international regulation –Lack of clarity over (U.S.) ILOCB reporting channels 1938 Rainy Lake Convention –IJC to avoid high and low emergency levels –Accomplished via rule curves (major review completed 2000) –IJC combining water level and water pollution boards

Rainy Issues New Orders –Background – Local Interest –Wellstone Amendment –Follow-up - Assessment 2001 High Water –Issues –Report Rainy Boards Combination – Q&Q –Membership –Operations –Activity - Resources

IJC Experience Independently Regulates Operation of 19 Structures in Boundary/transboundary Waters Addressed Over 50 Potential Problems At Request of Governments Provides Periodic Alerting Reports to Governments on Transboundary Air and Water Issues Apportions Waters on 3 Transboundary Rivers Monitors Government Progress Under Great Lakes Water Quality Agreement