20 January 2011R&D staf meeting - Jan T.1 Activities in 2010 at DESY test beam 4-chip/Ingrid tests in March; 3 days OK Single Ingrid tests in May combined.

Slides:



Advertisements
Similar presentations
Voor NIKHEF Jamboree 2013 Jan Timmermans. Quad-Ingrid & Octopuce (on the way to a LC-TPC module) Analysis by George Kassaras (masterstudent) of Quad-
Advertisements

Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
D. Attié, A. Chaus, P. Colas, X. Coppolani, E. Delagnes, M. Riallot, M. Titov Saclay, January 5 th, 2012 Status of the R&D in micropixel detectors at Irfu.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
Status ‘Si readout’ TPC at NIKHEF NIKHEFAuke-Pieter Colijn Alessandro Fornaini Harry van der Graaf Peter Kluit Jan Timmermans Jan Visschers Saclay CEA.
-1- Current Telescope Strengths High resolution (~2.5um) Adaptability Ease of use – Currently borrowed by SPS collimator group Weaknesses Small number.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas Analysis Meeting, DESY 11 February 2009 LP test beam Micromegas analysis -
Ingrid-Maria Gregor, DESY, JRA1 Milestone JRA1 Pixel Telescope at CERN SPS Present at CERN: Tobias Haas Marcin Jastrzab Uli Koetz Livio Piemontese Philipp.
Recent progress towards a Pixel-TPC 1. Objectives 2. New Structures (Ingrid,Twingrid,…) + Discharge Protection 3. Gas Studies 4. Testbeam at DESY (Medipix+3GEM)
Gaseous Tracking (TPC) Summary LCWT09 Nov. 5, 2009 LAL, Orsay Takeshi MATSUDA DESY/FLC 1.
P. Colas on behalf of LCTPC. 2 detector concepts : ILD and SiD SiD: all-silicon ILD: TPC for the central tracking 15/05/2012P. Colas - LCTPC2 Both based.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
1 Pixel readout for a TPC LCWS 2010 – Tracking TPC R&D session 27 March 2010 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
GridPix studies at Saclay Avalanche fluctuations D. Attié, A. Chaus, P. Colas, M. Titov GridPix workshop, Feb. 22, 2012.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
LCTPC WP Phone Meeting #71 – Micromegas module1 D. Attié, P. Colas, M. Riallot LCTPC WP Meeting #79 25 March 2008 News from Micromegas modules.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Annual Meeting – October 8, Status of the CEA Saclay R&D activities on pixelised readout of TPC David Attié, Paul Colas,
Timepix-3 test All-ceramic InGrid The focusing TPC
DESY test beam (DAQ integration, measurement plans, analysis) Mathieu Benoit.
A. Chaus, D. Attie, P. Colas, M. Titov CEA Saclay, Irfu/SPP, France Ingrid OUTLINE: OUTLINE:  “Octopuce” Uniformity Studies in the Laboratory  DESY Test-Beam.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
Timepix Telescope Plans Proposed Work Packages for the Timepix Telescope Richard Plackett CERN, 8 th December 09.
Annual Meeting 2008 – October 6 th 1 David Attié P. Colas, X. Coppolani, E. Delagnes, A. Giganon, I. Giomataris Status of Saclay.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, E. Delagnes, M. Dixit, M. Riallot, Y.-H. Shin, S.
FIRST TEST RESULTS FROM A MICROMEGAS LARGE TPC PROTOTYPE P. Colas (CEA Saclay), on behalf of the LC-TPC collaboration Micromegas with resistive anode:
June 22, 2009 P. Colas - Analysis meeting 1 D. Attié, P. Colas, M. Dixit, Yun-Ha Shin (Carleton and Saclay) Analysis of Micromegas Large Prototype data.
1 Readout of a TPC by Means of the MediPix CMOS Pixel Sensor NIKHEFAuke-Pieter Colijn Arno Aarts Alessandro Fornaini Maximilien Chefdeville Harry van der.
O.Bezshyyko, 2-nd French-Ukrainian workshop on the instrumentation developments for HEP, October 1-3, Orsay Taras Shevchenko National University of Kyiv.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
P. Colas - Status of the cosmic run 1 Tsukuba, January 16, 2006 STATUS OF THE DATA TAKING JANUARY 2006 COSMIC RUN.
Beam test July 2012 LCTPC WP Phone meeting 154 July 19, 2012 D. Attié, P. Colas, M. Dixit, P. Hayman, T. Maerschalk, A. Robichaud, J. Timmermans, W. Wang.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
1 Update on Silicon Pixel Readout for a TPC at NIKHEF LCWS08 - Chicago 19 Nov 2008 Jan Timmermans NIKHEF.
1 Some results with NIKHEF Ingrids at DESY test beams EUDET Annual meeting 29 September 2010 Jan Timmermans NIKHEF/DESY.
Snowmass, August, 2005P. Colas - InGrid1 M. Chefdeville a, P. Colas b, Y. Giomataris b, H. van der Graaf a, E.H.M.Heijne c, S.van der Putten a, C. Salm.
1 The Silicon TPC System EUDET Extended SC meeting 31 August 2010 Jan Timmermans NIKHEF/DESY.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
1 Status ‘Si readout’ TPC at NIKHEF NIKHEFMaximilien Chefdeville Auke-Pieter Colijn Alessandro Fornaini Harry van der Graaf Peter Kluit Jan Timmermans.
Wide-frame view on Saclay LCTPC activities P. Colas.
D. Attié, P. Colas, M. Lupberger, M. Riallot LCTPC WP Phone meeting 109 July 15, 2010 News from “Octopuce”
Micromegas (Ingrid)+TimePix 8-chip modules
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
1 The Silicon TPC System EUDET Extended SC meeting 1 September 2008 Jan Timmermans NIKHEF.
Tracking in a TPC D. Karlen / U. Victoria & TRIUMF for the LCTPC collaboration.
1 The Silicon TPC System EUDET Extended SC meeting 27 August 2007 Jan Timmermans NIKHEF.
On behalf of the LCTPC collaboration VCI13, February 12th, 2013 Large Prototype TPC using Micro-Pattern Gaseous Detectors  David Attié 
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
P. Colas, Endplates 1 LP phone meeting, May 9, 2006 Large Prototype Endplate(s)
1 The Silicon TPC System The “final” status report EUDET Annual meeting 30 September 2010 Jan Timmermans NIKHEF/DESY.
JRA 1 Status Tobias Haas DESY 19 December EUDET SC Meeting, 19 December Brainstorming, 3/4 DESY 15 people present, 3 via VRVS 15 people present,
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Timepix test-beam results and Sensor Production Status Mathieu Benoit, PH-LCD.
Maxim Titov CEA Saclay, Irfu/SPP, France Ingrid  University of Bonn: Y. Bilevych, C. Brezina, K. Desch, J. Kaminski, T. Krautscheid, C. Krieger, M. Lupberger.
On behalf of the LCTPC collaboration -Uwe Renz- University of Freiburg Albert-Ludwigs- University Freiburg Physics Department.
Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, Y-H Shin S. Turnbull, R. Yonamine (Carleton, KEK, Saclay)
Pixel panels and CMOS Read-out electronics
Progress with pixelised readout of gaseous detectors
DESY contributions to MAPS DESY testbeam
Progress with pixelised readout of gaseous detectors
DESY Test Beam Facilities - Status and Plan
C. de La Taille IN2P3/LAL Orsay
TIMEPIX TESTBEAM TELESCOPE FOR AIDA
‘Octopuce’ beam test D. Attié, X. Coppolani, P. Colas, M. Lupberger, M. Riallot, J. Timmermans, W. Wang Thanks to K. Dehmelt & U. Renz I’m here to present.
Toward the final design of a TPC for the ILD detector
News from Saclay D. Attié, P. Colas, W. Wang
EUDET Extended SC meeting 31 August 2009
Presentation transcript:

20 January 2011R&D staf meeting - Jan T.1 Activities in 2010 at DESY test beam 4-chip/Ingrid tests in March; 3 days OK Single Ingrid tests in May combined with EUDET telescope: some synchro problems Single Ingrid tests in Aug/Sept with Bonnie Chow (DESY summer student); one run combined with ZEUS/MVD telescope; synchro seems OK, some problem with Endianness of various PCs (or software?) Octopuce (= 8 Ingrids) test on LP with magnet in December together with Saclay group

20 January 2011R&D staf meeting - Jan T.2 Track backscattering from chip (=anode) – quad-Ingrid detector

Handshaked Pixelman operation based on Uwe Renz Pixelman plugin Work performed with Uwe Renz (and Martin Killenberg support) and with DESY summerstudent Bonnie Chow Detector used is the (2009) single “8 um” Ingrid

20 January 2011R&D staf meeting - Jan T.4 Track scattering at grid (or anode) Beam entering through cathode Out-of-time track

20 January 2011R&D staf meeting - Jan T.5 DESY Nov/Dec test beam e- test beam 5 GeV Preparation/installation Octopuce detector in gastestbox on Monday 29/11 Some test runs in gastestbox w. beam on Tuesday 30/11 Mounting detector module on LPTPC evening Tuesday 30/11 Flushing with pure He and from morning Wed 1/12 with He/isoButane 80/20 (5-6 hours per 40l gas bottle at 9 bar when full) First data taking evening Thu 2/12 without B-field B = 1 T available from Fri 3/12 15:00 Several data taking runs until Sat 4/12 ~12:00 Data taking rather slow (1 Hz), because of only (old) PC that worked with Muros and 8-chips

20 January 2011R&D staf meeting - Jan T.6 8 Ingrids on daughter board LPTPC with 7 detector slots inside1 T solenoid

20 January /09/2010 R&D staf meeting - Jan T.EUDET Octopuce - P. Colas 729/09/20107EUDET Octopuce - P. Colas

8 20 January 2011December 9, 2010 R&D staf meeting - Jan T.LCTPC WP phone meeting #119 He/Iso 80/20 Vmesh = 380V Time mode TPC at 0T 8December 9, 2010LCTPC WP phone meeting #119

9 20 January 2011December 9, 2010 R&D staf meeting - Jan T.LCTPC WP phone meeting #119 He/Iso 80/20 Vmesh = 380V Time mode TPC at 1T 9December 9, 2010LCTPC WP phone meeting #119

20 January 2011R&D staf meeting - Jan T.10 The last trigger taken: 4 Dec 2010, 11:06 He/iC 4 H 10 80/20 V grid = -400 V B = 1 T

20 January 2011R&D staf meeting - Jan T.11 Summary (including some ‘old’ statements) 8 μ m thick Si 3 N 4 protection layers seem sufficient Problems with readout of 4-fold Timepix/Ingrid (still) being investigated Successful standalone “handshaked” operation with early shutter opening Common data acquisition with Zeus telescope, running EUDAQ, succeeded Short but rather successful data taking with Octopuce module at Large Prototype TPC at B = 0 and 1 T

20 January 2011R&D staf meeting - Jan T.12 Future Wafer-scale production of Ingrids/GEMgrids at IZM Berlin (all single steps of process tried out) Construct 2 nd Octopuce and test at LP with T2K gas Move to new (faster) readout: e.g. Muros/Pixelman  “Relaxed” Longer term (2(?) years): development of “full” scale LP module with ~64 – 119 Ingrids; integrated design Ingrid, cooling, FPGA readout and data transfer Timepix2 with better time resolution

20 January 2011R&D staf meeting - Jan T.13