IEC 62271-100 Short-circuit current making and breaking tests Taiwan-European HVAC apparatuses Accreditation and Certification forum Harethe El Ouadhane.

Slides:



Advertisements
Similar presentations
CONDITIONS FOR SUCCESSFUL INTERRUPTION:
Advertisements

Moisture effect on the dielectric response and space charge behavior of mineral oil impregnated paper insulation Jian Hao1, 2, George Chen2, Ruijin.
CIRCUIT BREAKERS.
1 CNS/GSS/2008/M1 1 Module 1 Basic Terminologies and Characteristics of Switchgear.
During fault behavior of circuit breaker
Concept Design Review (CoDR) Shore Station DC Breaker Cable model Transient Analysis Components.
Advanced Power Protection Lecture No.2
GENERATOR PROTECTION.
LP33 Series UPS kVA 400Vac/CE
Schutzvermerk / Copyright-Vermerk SION Vacuum Circuit-Breaker For Standard Applications Siemens Medium Voltage Sector Energy, Business Unit Medium Voltage.
Slide 1 UNCLASSIFIED Breaker Operation Arc Flash Breakout Group EFCOG Electrical Safety Workshop – July 18, 2014.
FIPTMV Medium Voltage Technology
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
Electrical Power & Machines “Electrical Engineering Dept” Prepared By: Dr. Sahar Abd El Moneim Moussa 1.
© ABB Group Jun-15 Thermal interruption performance and fluctuations in high voltage gas circuit breakers N.P. Basse, M. Seeger, C.M. Franck and.
Electrical Safety Training
1 Position Paper on IEEE Task Force on Insulator Icing Test Methods Item # 5 Power Supply Requirements By Rudi F. Kremer Vice President.
CIRCUIT BREAKER.
3AH5 Vacuum Circuit-Breaker For Standard Applications
SHUNT CAPACITOR FUNDAMENTALS AND PROTECTION
Standardization Aspects in UHV Networks New Delhi, January 2009 Denis Dufournet Chairman IEC TC17 Member CIGRE WG A3-22.
Importance of advanced simulations of electrical system in wind turbines April 2010.
SMITH_USA_Author_ALPHA1_BLOCK1_Paper No 5-ECH_Smith_A1 Barcelona May VACUUM INTERRUPTERS FOR GENERATOR CIRCUIT BREAKERS, THEY'RE NOT JUST.
Single Phase IEC and EATS Distribution Transformers
Overvoltage protection (surge arrester)
ON DIMENSIONING LVDC NETWORK CAPACITANCIES AND IMPACT ON POWER LOSSES
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Electrical Installation 2
1 © ABB AB, Application of Unit Protection Schemes for Auto-Transformers Zoran Gajić ABB AB Vasteras, Sweden Authors: Z. Gajić, ABB Sweden.
ESTW/ Castor The company has to take care that: Equipment and switchgears are operated according relevant standards The errection, extension and maintenance.
Circuit breakers The main purpose of a circuit breaker is to: Switch load currents Make onto a fault Break normal and fault currents Carry fault current.
© 2005 PRS S.A. Ships’ electrical power network systems protected from damages caused by short-circuit current other than three-phase symmetrical current.
Sardar Patel Institute of
1200 kV AC Substations - Products and Integrated Solutions International UHV Symposium New Delhi, 29. January 2009 Edelhard Kynast Siemens AG, Energy.
Bock_DE_Session1_Block1_Question3 Barcelona May 2003 Nexans SuperConductors Dr. Joachim Bock Nexans SuperConductors D Huerth
Tchuidjan Roger, PhD Electrical Engineer 1 Connection of disturbing loads in micro-grids National Advanced Polytechnique Institute of Yaounde - Cameroon.
Reyrolle LMT Breaker Retrofit BU PPMV – PG Service Marketing and Sales
1 An Overview of Power Quality Problems In Transportation and Isolated Power Systems Paulo F. Ribeiro Calvin College / BWX Technologies, Inc Grand Rapids,
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
Frankfurt (Germany), 6-9 June 2011 CELLI – IT – Main Session 2 – Paper 700 Extending Switching Reclosing Time to Reduce Interruptions in Distribution Networks.
Transformer condition assessment with an integrated test van
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
Introduction to switchgears
Electrical Installation II1 Assessment of General Characteristics (Note: All the mentioned tables in this course refer to, unless otherwise specified,
Disconnector Switches and Earth Switches
VACUUM CIRCUIT BREAKER. WHAT IS A CIRCUIT BREAKER A circuit breaker is an equipment that breaks a circuit either manually or automatically under all conditions.
Presentation Topic: Circuit Breakers Represented to: Dr. M. Riaz Khan Represented by: M. Mujahid.
EE 2353 HIGH VOLTAGE ENGINEERING
Internal Arc testing of paper-oil insulated transformers Igor Žiger, univ. spec. transf. IEEE Transformer Committee meeting Atlanta, Georgia, 2016.
KILOMETRIC FAULTS: NATURE, AFFECTING PARAMETERS, AND IMPACT ON THE BREAKER STRESSES _____________________________ Mohamed M. Saied Electrical Engineering.
Power System Protective Relaying-Part Two
SEMINAR PRESENTATIon ON C IRCUIT B REAKER DEPT. OF ELECTRICAL ENGG. JALPAIGURI GOVT. ENGG. COLLEGE PRESENTED BY Madhusudan Mahato Malay Ghosh.
Hipot Testing 101.
Sub Station.
3AH5 Vacuum Circuit-Breaker For Standard Applications
PRESENTATION ON SUMMER TRAINING PROGRAM
Transient Analysis of Shunt Reactor Switching on 500kV System
3AH5 Vacuum Circuit-Breaker For Standard Applications
High Voltage Power Circuit Breakers
ELECTRICAL POWER-II Electrical engineering sixth semester
Technical sheet N°1 Using at frequency 60 Hz All cb’s
HVDC Transmission Systems:
3AH5 Vacuum Circuit-Breaker For Standard Applications
CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Substation Equipment's
National Institute of Wind Energy(NIWE)
© 2018 Global Market Insights, Inc. USA. All Rights Reserved Medium Voltage Switchgear Market Growth | Trends Analysis Report 2025.
Presentation transcript:

IEC 62271-100 Short-circuit current making and breaking tests Taiwan-European HVAC apparatuses Accreditation and Certification forum Harethe El Ouadhane IEC Expert: Member of MT14 of IEC62271-200 Testing, design & calculation / MVSG & MVCB Expert for internal arc, making, breaking and STC

Content Requirements of IEC 62271-100 Basic short-circuit test duties Single-phase fault tests Double-earth fault tests Technology of vacuum interrupters Extension of the validity of test results and derivations Conclusion

1. Requirements of IEC 62271-100 Mandatory Test Circuit-breakers shall be capable of making and breaking all short-circuit currents, symmetrical and asymmetrical, up to and including the rated short- circuit breaking currents: This is demonstrated, when the circuit-breakers make and break the specified three-phase symmetrical and asymmetrical currents between 10% (T10) and 100% (T100) of the rated short-circuit breaking current at rated voltage. In addition Circuit-breakers shall be capable of clearing single-phase short-circuit currents which may occur in two different cases: – in effectively earthed neutral systems in case of single-phase faults or, – in non-effectively earthed neutral systems in case of double earth faults, i.e. earth faults on two different phases, one of which occurs on one side of the circuit-breaker and the other one on the other side.

2. Basic short-circuit test duties Number of test specimen a unique test specimen should be used. Where required, maintenance is allowed and should be performed as permitted, between each individual test- duty in the case of short-circuit tests The manufacturer shall provide a statement to the testing laboratory of those parts that may be renewed during the tests. No-load test Before commencing making and breaking tests, no-load operations and no- load operating sequences (O, CO and O – t – CO) shall be made and details of the operating characteristics of the circuit-breaker recorded. Details such as closing time and opening time shall be recorded.

2. Basic short-circuit test duties Behavior of circuit-breaker during tests During making and breaking tests, the circuit-breaker shall not – show signs of distress; – show harmful interaction between poles and to earth; – show harmful interaction with adjacent laboratory equipment; – exhibit behavior which could endanger an operator. NSDDs may occur during the recovery voltage period following a breaking operation Condition after a short-circuit test-duty After each short-circuit test-duty, the circuit-breaker shall be capable of making and breaking its rated normal current at the rated voltage, although its short-circuit making and breaking performance may be impaired.

2. Basic short-circuit test duties Frequency Circuit-breakers shall be tested at rated frequency with a tolerance of ±8 %. However, for convenience of testing, some deviations from the above tolerance are allowable; for example, when circuit-breakers rated at 50 Hz are tested at 60 Hz and vice versa, care should be exercised in the interpretation of the results, taking into account all significant facts such as the type of the circuit-breaker and the type of test performed.

2. Basic short-circuit test duties There are several requirements for the test circuit, test parameters and CB arrangements in order to simulate the possible worst case switching of the CB in real system. In general, closing against the highest making current, opening with various arcing times and recovery voltages, under the unfavourable mechanical operating conditions. The main ones are among others related to: Operating sequence O – CO – CO, with or without auto-reclosing T10, T30, T60, T100s & only O for T100a, SPF & DEF Factors for recovery voltages; first-pole-to-clear (neutral earthing) and amplitude factor (based on CIGRE), RRRV Arcing time and arcing window: Depending on the point of mechanical contact separation, interruption with minimum, medium and maximum arcing time

2. Basic short-circuit test duties

2. Basic short-circuit test duties

3. Single-phase tests Mandatory in effectively earth neutral systems. The main requirements for the test duty are related to: Breaking of the rated symmetrical short-circuit current with the maximum arcing time and with the recovery voltage based on phase-to-earth voltage Outer pole under test to simulate the maximum stress in the coupling mechanism

4. Double-earth fault Mandatory in non-effectively earth neutral systems. The main requirements for the test duty are related to: Breaking of the 87% of the rated symmetrical short-circuit current with the maximum arcing time and with the recovery voltage based on phase-to-phase voltage

5. Technology of Vacuum Interrupters History: 1896: First analysis of electrical field breakdown in vacuum (theoretical 6MV per 1mm) 1930: Quantum mechanics describes the field emission in vacuum 1960: First commercial VI in the market 2012: Over 75% all MV CB uses VI to switch the current VIs are currently commercially available up to 145kV. Prototypes of multiple switching units at 220kV or higher voltages are under development. Development of VIs is continuing towards higher voltages and higher short-circuit currents with the employment of advanced arc control systems.

5. Technology of Vacuum Interrupters Main feature of VI technology: High number of operations: Up to 100 of rated short-circuit interruptions and up to 10.000 of rated current interruptions without any maintenance Compact & Lightweight and High Reliability with extremely low failure rate Contact materials with low welding tendency and low chopping current Contact design with arc control for high interrupting capacity and for withstanding fast recovery voltages

6. Extension of the validity of test results Who? - Manufacturer Experts / Expert teams - Third party Experts What? - Yes it can be extended / it may be extended - No, it can not be extended Responsibility only manufacturer Is not the task of test labs or accreditation institutes

7. Conclusion The design and technology of high-voltage circuit-breakers is continuously developing and will continue also in the future. Type tests qualify the type of product series while the routine tests ensure that the manufactured series are always in accordance with the type tested sample Circuit-breakers qualified according to the IEC 62271-100 are best suited for switching of short-circuit currents. They are able to switch currents with high asymmetry and fast rising TRVs without any maintenance throughout the lifetime Most of the failures are due to inappropriate human behaviors either during the project management phase (wrong product definition) or during operations (installation, operation, maintenance, etc.) Thus, considering additional regulation should not bring more safety. On the other side deregulating a proven standard will reduce the safety level

Make the most of your energy