Flight Inspecting GBAS International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Thorsten Heinke Aerodata AG Thomas Feuerle IFF TU Braunschweig.

Slides:



Advertisements
Similar presentations
ESTeem RF Design Tools SECTION 4 - RF System Design.
Advertisements

Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Navigation Applications perspective on ADQ
Site Calibration for 3D GPS Operations
International Flight Inspection Symposium
International Flight Inspection Symposium
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
Identifying the Achilles Heels of Instrument Flight Procedures International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Ivan Ferencz CAA.
International Flight Inspection Symposium
Testing of ILS Receivers in a Multipath Propagation Environment International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Jochen Bredemeyer,
Air Traffic Management
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
6/27/2008IFIS Elimination of ILS Navigational HMI in the Operational Environment By: Mickey Lindecker FAA, AJW143.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
Performance-based Navigation Honeywell SmartPathTM
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
1. 2 New Flight Inspection System Next Generation flight inspection system Multiprocessor Navigation Computer Unit (NCU) Full Windows/XP Graphical Workstation.
Navigational Systems.
CAR/SAM GNSS/ATN SeminarFrequency planning criteriaPage 1 GROUND BASED AUGMENTATION SYSTEM Frequency Planning Criteria Presentation GNSS 3.3 by Christophe.
NAV 7 VOR and ADF.
Protection Values for VOR-Defined ATS Routes
Antennas Lecture 9.
GTECH 201 Session 08 GPS.
Setup “Do’s & Don’ts Presented By:
July 2015 doc.: IEEE /XXXXr0 July 2015
Advanced Radio and Radar Part 7 Types of Radar. Introduction We have already looked at the general principle of operation of both radio communication.
Conclusions & Recommendations
A ERODROME T RAINING M ODULE 5 P ART 2 Electronic Navigation Aids.
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Lecture 12:Approach Lighting System
Antenna Techniques to Reduce Airborne User Dynamic Range Requirements Jeff Dickman JUP - Quarterly Review Winter
ILS Instrument Landing System
Joint University Program 5 April 2001 Steven Aab, Graduate Research Associate Avionics Engineering Center Ohio University Advisor: Dr. Michael F. DiBenedetto,
Air Berlin discovers GLS Marc Altenscheidt
Antenna Techniques to Optimize Pseudorange Measurements for Ground Based Ranging Sources Jeff Dickman Ohio University Avionics Engineering Center The 29.
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
Slide 1 July 2004 – FALBALA/WP5/FOR3/D – CENA, DFS, EEC, NATS, Sofréavia & UoG WP2 Current situation analysis – Aircraft perspective Philippe Louyot (CENA)
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
Michael Underwood Director, Business Development
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
Airborne Reception Analysis of 406 Emergency Locator Beacon.
VHF Omnidirectional Range (VOR)
Lecture 8: INSTRUMENT LANDING SYSTEM (ILS)
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
RADIO AIDS AND NAVIGATIONAL SYSTEMS
Lecture 7: INSTRUMENT LANDING SYSTEM (ILS)
VHF Omnidirectional Range (VOR)
Radio Aids & Navigational Systems – RAN 2204
Lecture 8: INSTRUMENT LANDING SYSTEM (ILS)
Lecture 8- Microwave Landing System (MLS). Home Previous Next Help Definition Microwave an electromagnetic wave with a short wavelength in the range 0.001–0.3.
VHF Frequency Data Transmitter. Aircraft On-board Receiving System.
SmartPath® Ground Based Augmentation System (GBAS) A New Era in Precision Navigation.
COST ES0802 MC/WG Meeting > /09/2010 Slide 1 COST ES0802 MC/WG Meeting Cambridge, September 20 th – 21 st, 2010 Determination of the conflict potential.
Navigation Technology
Federal Aviation Administration Presented to: OSWG Presented by: Chris Hope Date: March 9, 2016 ILS Performance Classification OpSpec C061.
Final approach Instrument landing system
Conclusions & Recommendations
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
INSTRUMENT LANDING SYSTEM
Microwave Landing System (MLS)
New Flight Inspection System
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002
Instrument Landing System and Microwave Landing System
Flight Navigation and Planning
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
Instrument Landing Systems
Presentation transcript:

Flight Inspecting GBAS International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Thorsten Heinke Aerodata AG Thomas Feuerle IFF TU Braunschweig

Flight Inspecting GBAS 2 of 34IFIS 2008, OKC Flight Inspecting GBAS Overview –Basics –Requirements –Equipment –Flight Testing –Conclusion

Flight Inspecting GBAS 3 of 34IFIS 2008, OKC Basics Status Information VDB Tx-Frequency Range : MHz in 25 kHz increments GBAS Ground Station GBAS Reference Receivers VDB: VHF Data Broadcast -Error correction data -Integrity data -Approach data for one or more Runways/Approaches

Flight Inspecting GBAS 4 of 34IFIS 2008, OKC Basics -Type 1: Differential Error Correction Data -Type 2: Differential Reference Point Data - (Integrity Data) -Type 3: Reserved for GBRS Ground Based Ranging Source (Airport Pseudolites) -Type 4: FAS Final Approach Segment Construction Data for one or more Runways/Approaches -Type 5: Ranging Source Availability (optional) -Type 6: Reserved for Carrier Corrections -Type 7: Reserved for Military -Type 8: Reserved for Test VHF Data Broadcast (VDB) Messages

Flight Inspecting GBAS 5 of 34IFIS 2008, OKC GLS (GNSS Landing System) Vertical Deviation Threshold Crossing Height LTP/FTP Threshold Crossing Point Vertical Direction (Normal to WGS-84 Ellipsoid at LTP/FTP) FPAP GPA Glide Path Angle Centerline A Line through GERP normal to the Centerline can be compared with ILS Glide Path Intercept Line Desired Flight Path vv  v Angular Vertical Deviation GERP  GLS-Elevation Reference Point Basics

Flight Inspecting GBAS 6 of 34IFIS 2008, OKC GLS (GNSS Landing System) Lateral Deviation Centerline GARP-Offset 305m LTP/FTP Lateral Deviation Reference Plane DgDg  Lat Vertical Direction (Normal to WGS-84 Ellipsoid at LTP/FTP) GARP  GLS-Azimuth Reference Point GARP can be compared with the ILS-LLZ Antenna Basics

Flight Inspecting GBAS 7 of 34IFIS 2008, OKC Requirements What influences the Performance/Precision of GBAS? -Signal of GBAS – Ground Station Coverage Interference Incorrect FAS-Data -Availability of Satellites at the Ground Station Satellite Masking Multipath Interference -Availability of Satellites at the Aircraft Satellite Masking Multipath Interference -Satellite Constellation DOP

Flight Inspecting GBAS 8 of 34IFIS 2008, OKC When is Flight Inspection required? -Prior to commissioning on each runway served and for each approach -Whenever interference is reported or suspected and ground testing cannot confirm elimination of the source of interference -As a result of a procedure modification or the introduction of a new procedure -Whenever changes occur to the GBAS configuration such as the location of the GBAS ground subsystem antenna phase-centre, the location of the data link transmit antenna, or the system database -Whenever site changes such as new obstructions or major construction occur that have the potential to impact GNSS signal reception and data broadcast transmission -After certain maintenance activities Requirements

Flight Inspecting GBAS 9 of 34IFIS 2008, OKC What should be inspected on ground -Data Contents -FAS Horizontal Tolerance: 0,4m horizontal, uncertainty 0,05m Vertical Tolerance: 0,2m vertical, uncertainty 0,05m -Integrity Data -Differential Correction Data -Runway surface coverage (> -99 dBW/m² < -35 3,7m / 12ft above runway) -Availability of Satellites at Ground Station -Multipath at Ground Station -Interference at Ground Station Requirements

Flight Inspecting GBAS 10 of 34IFIS 2008, OKC What should be flight inspected -Coverage of VDB Ground Station -Frequency Spectrum of VDB Frequency  100 kHz either side in case of suspected interference -Frequency Spectrum of GPS Frequency ( MHz) when GPS Parameters indicate possible RF interference -Satellite Availability at aircraft (PRN#) -Satellite Constellation (VDOP,HDOP, EPE) Requirements

Flight Inspecting GBAS 11 of 34IFIS 2008, OKC No Data Continuity Alerts shall be allowed in this area The minimum operational VDB coverage area has to be: -35 dBW/m²> Field Strength > -99 dBW/m² Coverage Area

Flight Inspecting GBAS 12 of 34IFIS 2008, OKC 20 NM Arc around 0.3 –0.45 Theta Main Purpose: Coverage of VDB – Ground Station, Satellite availability, DOP Main Purpose: Coverage of VDB – Ground Station, Satellite availability, DOP ~ 2000ft HAT Field Strength > -99 dBw/m² Procedures

Flight Inspecting GBAS 13 of 34IFIS 2008, OKC 15 NM Arc around 0.3 –0.45 Theta Main Purpose: Coverage of VDB – Ground Station, Satellite availability, DOP Main Purpose: Coverage of VDB – Ground Station, Satellite availability, DOP ~ 1500ft HAT Field Strength > -99 dBW/m² Procedures

Flight Inspecting GBAS 14 of 34IFIS 2008, OKC Level Run from 20NM to 13NM or less Main Purpose: Coverage of VDB – Ground Station, Satellite availability, DOP Main Purpose: Coverage of VDB – Ground Station, Satellite availability, DOP ~ ft HAT Field Strength > -99 dBW/m² Procedures

Flight Inspecting GBAS 15 of 34IFIS 2008, OKC Level Run from 21NM to 2,5 NM or less Main Purpose: Coverage of VDB – Ground Station, Satellite availability, DOP Main Purpose: Coverage of VDB – Ground Station, Satellite availability, DOP ~ 2.000ft HAT Field Strength > -99 dBW/m² Procedures

Flight Inspecting GBAS 16 of 34IFIS 2008, OKC Aircraft premises -GBAS Indication in Cockpit -Through primary avionic -Through FIS on separate Cockpit display -Through FIS on primary EFIS -Additional NAV antenna Equipment

Flight Inspecting GBAS 17 of 34IFIS 2008, OKC Aircraft Equipment

Flight Inspecting GBAS 18 of 34IFIS 2008, OKC FIS Premises -GBAS receiver -Polar Antenna diagrams for Azimuth and Frequency dependencies -GBAS Data display graphical and numerical -Measurement procedure for Coverage and Approach -Cockpit interface for GBAS Flight Inspection Guidance -Spectrum analyzer measurement program for VDB and GPS interference -Autopilot coupling for even more accurate flying Equipment

Flight Inspecting GBAS 19 of 34IFIS 2008, OKC FIS Equipment

Flight Inspecting GBAS 20 of 34IFIS 2008, OKC FIS Equipment

Flight Inspecting GBAS 21 of 34IFIS 2008, OKC FIS Equipment

Flight Inspecting GBAS 22 of 34IFIS 2008, OKC FIS Equipment

Flight Inspecting GBAS 23 of 34IFIS 2008, OKC Scenario -design GBAS approaches to Egelsbach (airport 12 km from Frankfurt) -use Honeywell prototype GBAS ground station (SLS-3000) at Frankfurt airport -do 50 GBAS approaches to Egelsbach (remote airport) -with an experimental aircraft DO from TU Braunschweig -equipped with the GBAS MMR GLU-925 -connected to the experimental cockpit on the co-pilot side -use Thales ATM GBAS ground station at Toulouse Blagnac Motivation for DFS, STNA/DTI and EUROCONTROL -check new GBAS procedure design tool -test FAS data file generation & FAS data chain for the SLS gain experience with MMR installation onboard the DO gain experience with VDB field strength measurements -check & improve EUROCONTROL PEGASUS tool Flight Testing

Flight Inspecting GBAS 24 of 34IFIS 2008, OKC Flight Testing experimental GBAS approach inbound Egelsbach (© by DFS GmbH)

Flight Inspecting GBAS 25 of 34IFIS 2008, OKC Egelsbach 1st day: -31 approaches -distance flown between 2 NM and 7 NM from Threshold -procedure: after low approach right turn out to intercept “back beam” -3 approaches with a northern traffic pattern due to other traffic 2nd day: -20 approaches -distance flown between 3 NM and 12 NM from Threshold -procedure: after low approach northern traffic pattern Flight Testing

Flight Inspecting GBAS 26 of 34IFIS 2008, OKC Flight Testing Toulouse –48 approaches –3 consecutive days (September 2006) –approach started at ft

Flight Inspecting GBAS 27 of 34IFIS 2008, OKC Bremen Flight Testing –Initial Flight Check of Bremen GBAS installation –Funded by DFS GmbH –Program according to ICAO Doc 8071 Vol. II –Program flown twice on different days –Intention Check of VDB coverage area Check of data contents Check of interference issues

Flight Inspecting GBAS 28 of 34IFIS 2008, OKC Flight Testing Approach charts and flight track of Bremen approaches

Flight Inspecting GBAS 29 of 34IFIS 2008, OKC Flight Testing Results Difference of OEM3-Reference track and OEM4-Reference track (i.e. on-board OEM3 on one antenna, on-board OEM4 on another antenna; difference of both antennas: m; on ground both receivers used same Antenna) Day 1 (23/01/2006) Day 2 (24/01/2006)

Flight Inspecting GBAS 30 of 34IFIS 2008, OKC Flight Testing Results NSE North (cross track, Egelsbach) NSE Down (vertical, Egelsbach) NSE East (along track, Egelsbach)

Flight Inspecting GBAS 31 of 34IFIS 2008, OKC NSE Vertical Track, Toulouse Flight Testing Results

Flight Inspecting GBAS 32 of 34IFIS 2008, OKC Bremen, Field Strength Coverage, 15NM Flight Testing Results

Flight Inspecting GBAS 33 of 34IFIS 2008, OKC -GBAS is a good alternative to perform ILS look-a-like approaches -For Flight Inspecting GBAS below mentioned equipment is found necessary: -GBAS Receiver -GBAS Flight Guidance in the Cockpit by Primary Equipment or from Flight Inspection System -Suitable spectrum analyzer for GPS and VDB -Calibrated VDB antenna system Conclusion

Flight Inspecting GBAS 34 of 34IFIS 2008, OKC Thank you for your attention!