Chehalis River Basin Overview of Work Program and Issues September 25, 2013 Aberdeen Rotary Club 12:00 Noon.

Slides:



Advertisements
Similar presentations
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Advertisements

Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin 7:00 p.m., March 13, 2013 Aberdeen.
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin 7:00 p.m., March 6, 2013 City of Cosmopolis.
Raising the Standard for Improved Flood Risk Management in the Midwest Raising the Standard for Improved Flood Risk Management in the Midwest Interagency.
Chehalis River Basin Flood District Formation November 18, 2010 Chehalis River Basin Flood District Formation 1.
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
Chehalis River Basin Flood Entity Formation Public Meeting Swede Hall, Rochester – October 14,
1 The Status of Capitol Lake Planning Washington State Capitol Committee October 12, 2010.
Columbia River Toxics Reduction Working Group 2012 Regional Roundtable: Pacific Northwest Pollution Prevention Resource Center.
Manastash Creek Corridor Habitat Enhancement and Flood Hazard Reduction Plan Kick-Off Meeting June 5, PM Hal Holmes Center.
July 8, 2014 TO:TO:Centralia City Council Members FROM:Scott Boettcher, Staff, CRBFA (360/ , SUBJECT:Brief.
Chehalis River Basin Overview of Work Program and Issues July 24, 2013 WA State Department of Ecology.
Drainage District #7 Pump Station Retrofits for Safe Fish Passage Ryan Bartelheimer, P.E. Snohomish Conservation District.
Chehalis River Basin Flood Entity Formation Public Meeting Centralia Middle School, Centralia – October 28,
Chehalis River Basin Flood District Formation February 17, 2010.
Helping Shape the Future of the National Capital Region: COG’s Climate Change and Greater Washington 2050 Initiatives Stuart Freudberg Director, Dept.
Climate Change Impacts in the United States Third National Climate Assessment [Name] [Date] Decision Support: Connecting Science, Risk Perception, and.
Chehalis River Basin Flood Entity Formation Public Meeting City Hall, Montesano – October 18,
Mitigation and Community Sustainability Virginia Mitigation Summit, 2004.
Indian Valley Meadow Restoration acre meadow located atop the Sierra Crest in Alpine County, CA. Headwaters of the Mokelumne River. Source for agricultural,
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
Puget Sound Initiative 2007 At A Glance Jay Manning, Director Washington Department of Ecology April 26,
Actions and Activities Benefiting the Basin February 2013
California’s Flood Future Recommendations for Managing the State’s Flood Risk National Association of Flood & Stormwater Management Agencies December 10,
Dam Hazard Consequences Assessment
HAZARD MITIGATION 101 Sandusky County Initial Planning Meeting March 11, 2014.
Water Supply Planning Initiative State Water Commission November 22, 2004.
American Heritage Rivers Initiative. BACKGROUND Objective: Recognize and support local efforts to restore and protect America’s rivers and their communities:
United for the benefit of all Regional Coordination.
HAZUS-MH is a multi-hazard risk assessment and loss estimation software program developed by the Federal Emergency Management Agency (FEMA). (animate on.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Flood Authority Meeting November 1, Agenda Discuss Background Materials for Governor Recommendations Miscellaneous – EWS URL; EWS Training Next.
Conservation of Lake Sammamish Kokanee A Briefing for the City of Bellevue Planning Commission David St. John – Lake Sammamish Kokanee Work Group
Regional Water Councils and Implementation Actions June 17, 2008.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
1 Chehalis River Basin Flood Authority Community Outreach and Education Subcommittee Actions and Activities Benefiting the Basin 3:00 p.m., July 8, 2013.
Session 111 Marketing Plan Form a publicity subcommittee Make the media work for you Preparing to work with the media What is your message?
SUBCOMMITTEE ON HYDROLOGY Overall Goal – from purpose statement: “To improve the availability and reliability of (surface water) information needed for.
Lake Sammamish Kokanee: Bringing Them Back from the Brink A Presentation for the Rotary Club of Issaquah David St. John – Government Relations Administrator.
CALIFORNIA'S STATE WILDLIFE ACTION PLAN 2015 UPDATE A Conservation Legacy for Californians Armand Gonzales, Project Lead.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
Marin County Watershed Stewardship Program Marin County Department of Public Works.
Chehalis River Basin Flood Authority Education and Outreach Subcommittee Actions and Activities Benefiting the Basin February 2013.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Bighorn Long-Term Issues Group Where Are We Going?
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Project Subcommittee Subcommittee Purpose/Goals: – Develop a master inventory of flood-related projects in the Chehalis Basin Seven sets of discussions:
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
District Type and Issues Identification Chehalis River Basin Flood Authority Entity Formation July 15, 2010.
HUMBOLDT BAY SEA LEVEL RISE ADAPTATION PLANNING PROJECT Funded by the State Coastal Conservancy Aldaron Laird Project Planner.
Planning Commission Study Session: Preferred Plan July 23, 2015.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
The Boardman: A River Reborn Removing Dams for a Free Flowing River.
> Las Vegas Valley Watershed Advisory Committee Regional Water Quality Plan.
Using Analysis and Tools to Inform Adaptation and Resilience Decisions -- the U.S. national experiences Jia Li Climate Change Division U.S. Environmental.
Mahoning County Informational Meeting USACE Programs, Authorities, and Ohio Silver Jackets Program Presented by: Ashley Stephens 16 August 2016.
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Watershed Literacy & Engagement
Washington State Infrastructure Financing
Yakima River Basin Integrated Water Resource Management Plan 2011 Yakima Basin Science & Management Conference Central Washington University Ellensburg,
North Shore Streamkeepers February 23, 2019
Presentation transcript:

Chehalis River Basin Overview of Work Program and Issues September 25, 2013 Aberdeen Rotary Club 12:00 Noon

2 Today’s Presentation Share perspectives Encourage discussion Key messages we’d like to leave you with Broad agreement -- For the first time in a century there is broad agreement across the Basin on next steps to reduce flood damage and enhance salmon runs in the Basin. 2. Basin-wide strategy -- A Basin-wide strategy is needed to protect communities along the river and enhance aquatic species. 3. Collaboration of Governor’s Chehalis Basin Work Group, Chehalis River Basin Flood Authority and WA State Agencies – Together, a galvanizing force for action! September 2013

3 Governor’s Chehalis Basin Work Group September 2013 Appointed by Gov. Gregoire (2012); Re-confirmed by Gov. Inslee (2013) Developed Next Steps Framework, $28.2 capital budget request ( ) Looking Forward  Tasked by Gov. Inslee to oversee implementation of budget, recommend next steps by December 2014 for: Water retention; I-5; Other basin improvements; Aquatic species enhancement. Members are:  David Burnett (Chairman Chehalis Tribe)  Karen Valenzuela (Thurston County Commissioner, Vice-Chair Flood Authority)  Vickie Raines (Mayor Cosmopolis, Chair Flood Authority)  J Vander Stoep (Private Attorney, Pe Ell Alternate Flood Authority)  Jay Gordon (President Washington Dairy Federation and Chehalis Farmer)  Sandi Triggs (Capital Budget Advisor to Governor)  Keith Phillips (Governor’s Energy and Environment Advisor)

4 Chehalis River Basin Flood Authority September 2013  Grays Harbor County  Lewis County  Thurston County  City of Aberdeen  City of Napavine  City of Oakville  Town of Pe Ell  Town of Bucoda Formed in 2008 Formal body focused on: (1) flood hazard mitigation throughout the Basin; and (2) decision-making that is....  informed by science.  protective of Basin residents/communities.  environmentally appropriate. Basin jurisdictions represented  City of Centralia  City of Chehalis  City of Cosmopolis  City of Montesano

5 September Flood -- $938M Basin-wide damage, $300M lost economic activity (WA) City of Centralia STEVE RINGMAN / SEATTLE TIMES Exit 77 (I-5) in Chehalis STEVE RINGMAN / SEATTLE TIMES Background Photos Source: LEWIS COUNTY, DIVISION OF EMERGENCY MANAGEMENT

6 Ranked high flow events ( )...  I-5 closed 1990, 1996, 2007, 2009  Five largest events since Frequent floods are getting worse and damage is increasing...  Chart -- Chehalis River Flow Rates near Grand Mound (cubic ft./sec.) September 2013 Background

7 Chehalis is the second largest river basin in the state, rich in natural resources... Populations are 15-25% of historic levels TMDL for the basin ( September 2013 Background Upper Chehalis (5/31/2010) JAMES E. WILCOX / WILD GAME FISH CONSERVATION INTERNATIONAL

8 Need -- Strategy, Action, Tools... September 2013 William D. Ruckelshaus Center Strategy = Basin-wide Solution A.Significant reduction in flood damage and enhancement of aquatic resources. B.Solving one’s problems doesn’t increase another’s. C.Maintain focus in five areas: 1. major capital projects. 2. localized projects. 3. land use management. 4. aquatic species and habitat enhancements. 5. flood warning, emergency response.

9 September 2013 Action – Capital Projects (2012, 2013) (Website)Website 2012 Capital Budget: 1. $5.0M – Local projects Capital Budget: 1. $9.2M -- Design evaluations by 2014 for Upper Basin dam (~$5.6M) and I-5 protection (~$3.4M). 2. $15.1M -- Local projects and fish and aquatic species enhancements. 3. $1.8M -- Local programs (buyouts, flood proofing, home elevations). 4. $2.2M – Implementation capacity, technical experts.

10 Example Project – City of Montesano September 2013 Revetment to Protect Montesano Road, Adjacent Facilities  Mary’s River Lumber = 120 family wage jobs.  State Highway (SR 107) = At risk of damage.  Montesano STP = Risk of overtopping.  Solutions and Alternative = Balance time, cost, results.  Project website.website

11 Local Projects (2012, 2013) -- September 2013 SponsorProjects (and web content)Allocated Pending 1. AberdeenBurger King Trail/Dike $ 24,600 $ 140, AberdeenDike Bank of Wishkah North of Highway $ 47,000 $ 270, AberdeenMarket Street Dike $ - $ 670, AberdeenSouthside Dike/Levee Certification $ 50,000 $ - 5. BucodaBucoda Levee $ 347,000 $ - 6. CosmopolisMill Creek Dam Improvements $ 737,750 $ - 7. Grays Harbor CountyElma-Porter Flood Mitigation Project $ - $ 584, Grays Harbor CountyWishkah Road Flood Levee $ 815,000 $ - 9. Lewis CountyAdna Levee $ 244,145 $ Lewis CountyAirport Levee (Phase I) $ 1,239,829 $ MontesanoRevetment for Montesano Rd., Sewage Treatment Plant, Mary’s River Lumber $ 6,102,426 $ Pe EllWastewater Treatment Plant Flood Prevention Dike $ 521,000 $ WA Cons. Comm.Critter Pads and Evacuation Routes $ 500,000 $ 850, WDFW (GHC)Satsop River Floodplain Restoration $ 50,000 $ 450, Chehalis TribeFlood Gage Station $ 50,000 $ Chehalis TribeSickman-Ford Overflow Bridge Project $ 2,075,000 $ TBDRestoration -- Allen Creek $ - $ 990, TBDRestoration -- Oxbow Reconnect at RM 78 $ - $ 861, TBDRestoration -- Oxbow Lake Reconnect $ - $ 1,149, TBDRestoration -- Basin-wide Salmon Recovery Strategy $ - $ 1,350,000 Total = $ 12,803,750 $ 7,314,000

12 Key Tool to Understanding How the Basin Functions – “Chehalis River Hydraulic Model” Science-based model to inform decision-makers on hydraulic effects of potential flood relief options (at basin-wide and localized scales). September 2013 Covers mouth of Chehalis River upstream to Pe Ell (108 miles).

13 Tools -- Hydraulic Analysis Model September 2013 Example: Basin-wide effects analysis (Chehalis Basin Flood Hazard Mitigation Alternatives Report 12/2012) Table 1 (pg.70) -- “Mainstem Dam, Upper Chehalis”

14 Tools -- Flood Warning System September 2013 Front-facing website. Back-end data collection, data synchronization. Improves forecasting and early-warning.

15 Tools -- Flood Warning System September 2013 Localized tracking, forecasting...

16 Work Program Elements (now to Nov. 2014) September 2013 Collect aquatic species, water quality, hydrologic data. Model analyses to understand impacts/benefits on fish, wildlife, water quality, sediment, streamflow and flooding. Develop DRAFT and FINAL dam design/operation plan, and assess costs, benefits, impacts. Develop DRAFT and FINAL aquatic species enhancement plan. Technical, Policy, Public Workshops. Consultant/agency report (9/2014). Recommendation (11/2014). Downstream snorkel surveys (Chehalis River) Seine collections (Chehalis River)

17 Resources, Additional Information September Local Projects Meetings Capital Budget Implementation Outreach & Education Basin Gages Recent Documents Contacts And More!

18 Thank You! September 2013 Jim Cook, Aberdeen Rep. Chehalis River Basin Flood Authority 360/ Vickie Raines, Chair Chehalis River Basin Flood Authority 360/ Edna Fund, Chair Community Outreach and Education Subcommmittee (Flood Authority) 360/ Wes Cormier, Grays Harbor County Rep. Chehalis River Basin Flood Authority 360/ x-304 Scott Boettcher, Staff Chehalis River Basin Flood Authority 360/ Jim Kramer, Facilitator Governor’s Chehalis Basin Work Group, and Chehalis River Basin Flood Authority 206/ Ken Estes, Montesano Rep. Chehalis River Basin Flood Authority 360/ x-102