Comal County Chip Sealing June 26, 2007.

Slides:



Advertisements
Similar presentations
DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
Advertisements

2014 Chip Seal Training Contract Administration Issues.
Asphalt Concrete Mix Design and Construction
POLYPATCH. PolyPatch: What is it? Hot-applied, pourable, self- adhesive patching material Hot-applied, pourable, self- adhesive patching material has.
Ms Ikmalzatul Abdullah BITUMINOUS MATERIALS. Definitions: Binder: A material used to hold solid particles together, i.e. bitumen or tar. Bitumen: A heavy.
2014 Chip Seal Training ODOT Specifications
South African Seal Design & Practice Trevor Distin.
HMA Design (Surface) The surface course is the layer in contact with traffic loads and normally contains the highest quality materials. It provides characteristics.
Module 4-2 : Joint Sealing
 Ditching  Crack Seal  Dig-outs  Blade Patching  Shoulders  Chipseal  Fog seal  Striping.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
LATEXFALT ® PARKDECK.
Chapter 6 Chip Seals From… Maintenance Technical Advisory Guide (MTAG)
California Chip Seal Association 2007 Award of Excellence in Contracting Innovative Process Category International Surfacing Systems City of Antioch 2007.
Blacklidge Emulsions Inc. GuardTop Sealer. Guardtop Mission Statement The goal of Guardtop is to produce an asphalt seal coating that has deeper and longer-lasting.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
Crack Treatment Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman, P.E. SemMaterials.
Example of a successful lining Description: Tuff Stuff is sprayed as a protective lining onto a boat hull. The lining with TS provides a high level of.
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Concrete
NEW MEXICO-CHIHUAHUA RURAL TASK FORCE Technical Workshop: Dust Control for Improved Particulate Matter Air Quality in Columbus-Palomas December 2, 2008.
Fog Seals, Sand Seals, Scrub Seals, and Rejuvenators.
Pavement Maintenance II Part 1a: SurfaceTreatments Idaho Roads Scholar Program.
Surface Rehabilitation Treatments
Highway Maintenance & Rehabilitation
CIVL 598 Asphalt Paving Materials Asphalt Rubber.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 7 Isolated Partial Depth Concrete Repair.
Chapter 5 Patching and Edge Repair
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Pavement Maintenance II
Pavement Distresses Flexible Pavement
Asphalt Rubber Seal Coats. How many cracks can you fill in one day?
1 International Focus Group at TRL January 2002 by Robert Petts Rural Road Surfacing Investigations Intech Associates © Intech Associates. Extracts may.
BondChem TECHNICAL DATA Roll-a-crete ( Three Component Cementitious Waterproof Coating ) Page 1 / 2. DESCRIPTION BondChem’s Roll-a-crete is a three component.
PAVEMENT MAINTENANCE 1 Part 3: Potholes and Cracks Idaho Roads Scholar Program.
Micro-surfacing SRF Consulting Group, Inc. SemMaterials
Kersten Stelmach, Maggie Bailey, Hailey Frankland.
Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance.
1 New Innovations in Road Seal Treatments 19 th South Australian Local Government Road & Works Conference BAROSSA – 25 th & 26 th August 2011 Warren Carter.
Paving & Surfacing Module #6 Prepared by Dr. Randy R. Rapp July 2005.
PUSHING THE OPERATIONAL LIMITS OF SURFACE SEALS AND ITS EFFECT ON CURRENT MATERIALS SPECIFICATIONS Douglas Judd.
MODULE 3-3 Patching With Bituminous Mixtures. Learning Objectives  Describe the conditions that require patching  Distinguish between hot-, cold-, and.
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
THIN ASPHALT MIXTURES A new top layer should ; be flat and rough
Surface Treatments #2.
“resurfacing hotline” (512)
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
1 Aggregate Primary function: TRH 3 : Surface Seals for Rural and Urban Roads Components  Resistance to abrasion of base  Transfer of wheel load to pavement.
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT COOPERATION THE KEY TO SUCCESS.
Chip Seal Design Chapter 2. North America (ranked by prevalence) Empirical / Past Experience No Design Method Own Method McLeod (1960’s) - Asphalt Institute.
GUIDED BY PRESENTED BY LIJA.M.PAUL SHYAM.S.THAMPY LECTURER C7-51 DEPT.CIVIL.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
3rd International Road Surface Friction Conference
Deschutes county road department otta seal gravel road conversion pilot project December 7, 2016 oaces chip seal workshop.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
Alabama Asphalt Pavement Association
Fiberglass-Reinforced Sheet Flooring Installation System
Dedicated to Quality Partners In Quality
PAVEMENTS CEE 320 Steve Muench.
Fiberglass-Reinforced Sheet Flooring Installation System
Introduction to Pavement Design
JACKSON COUNTY Chip Seal Program
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT
Surface Treatments #2.
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Materials and Tests Engineer
15th Annual Arizona Pavement/Materials Conference
Presentation transcript:

Comal County Chip Sealing June 26, 2007

Chip sealing is the application of a bituminous binder immediately followed by the application of an aggregate. The aggregate is then rolled to embed it into the binder. Binder ApplicationAggregate Application Rolled

Advantages of Chip Sealing Improved Skid Resistance Cost Effective Treatments Good Durability (Typically 5-7 Years) Ease of Construction Chip Seal = 1 Mile/Day Asphalt = 1 Mile/Week

Disadvantages of Chip Sealing Flying Chips – Broken windshields and vehicle damage Noise Considerations – Chip seals can be noisy to travel on Weather Considerations – Must be constructed during warm, dry weather during daytime only Pedestrian – Not good for roller-blading & skateboarding

Materials Binders must provide good adhesion, or stickiness Aggregates must have following characteristics: Single-sized, if possible Clean Angular (not rounded) Aggregates must be damp for emulsion use

Construction Process Surface Preparation Crack Sealing or Filling of Cracks Patching Deteriorated Areas Cleaning or Brooming Any Loose Material Removing Pavement Markers and Delineators

Construction Process Binder Application Uniformly Apply the Binder Over the Surface at a Designed Rate Pavement Surface Temperature Should be 55ºF and Rising Humidity Should be 50% or Lower Most Important Step in Process

Construction Process Aggregate Application Should Follow the Binder Application by no more than 90 Seconds Should be no more than 100 Feet Behind Distributor Truck

Construction Process Aggregate Application Should Follow the Binder Application by no more than 90 Seconds Should be no more than 100 Feet Behind Distributor Truck

Construction Process Rolling Initial Rolling by Pneumatic Roller or Steel Rollers Compaction by Traffic Finishes the Process Should be Done During Hotter Weather Should Follow Aggregate Spreading by no more than 500 Feet Minimum of Two Rollers Should be Used to Cover the Full Width of the Chip Spreader

Construction Process Brooming After Chip Seal, Excess Aggregate Must be Broomed Off Within 2 to 4 Hours after Sealing

Possible Problems Bleeding – Too much binder leading to “leaking” of emulsion Traffic Control – Ensure that vehicles do not drive on binder application “Shelling” – Aggregate not applied in a timely manner. Binder sets. Aggregate does not stay in place.

Comal County Canyon Lake Spillway Canyon June 26, 2007

1998 Storm Totals Storm Total for 1998

Storm Total for 2002

Structural Flood Control Measures in Comal County Canyon Reservoir

Structural Flood Control Measures in Comal County Emergency Spillway

Structural Flood Control Measures in Comal County x