Case Study By: The South Group

Slides:



Advertisements
Similar presentations
Layout Library Story line Preview screen Tool selection menu.
Advertisements

Microsoft Excel 2003 To start Excel, click the start button. A slightly different procedure might be required for computers on a network. If you need assistance,
Chapter 11 To accompany Quantitative Analysis for Management, Eleventh Edition, Global Edition by Render, Stair, and Hanna Power Point slides created by.
Chase Manhattan Bank By South Group
Have you ever wished you could quickly and easily attach an ECG in to the patient record? Click to continue.
Course Registration Registration Procedures. Log-in through Intranet Portal.
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
1 Minimal Spanning Tree This is a technique used when we need to connect many places to a system(network).
Chapter 7 Network Flow Models.
Chapter 11 Network Models. What You Need to Know For each of the three models: –What is the model? (what are given and what is to calculate) –What is.
© 2008 Prentice-Hall, Inc. Chapter 12 To accompany Quantitative Analysis for Management, Tenth Edition, by Render, Stair, and Hanna Power Point slides.
Network Flow Models Chapter 7.
Formula Auditing, Data Validation, and Complex Problem Solving
Transportation, Assignment, Network Models
Computational Methods for Management and Economics Carla Gomes Module 4 Displaying and Solving LP Models on a Spreadsheet.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 12-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 12.
Introduction to Management Science
By Christy Jacobs Walk Distance Maps & Analysis Using Network Analyst by Christy Jacobs.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
During Spring Break Infinite Campus will be upgraded to the lastest version. There are a number.
7-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Network Flow Models Chapter 7.
Shortest Route, Minimal Spanning Tree and Maximal Flow Models
ICP Kit 2011 HHC Data Entry Module The World Bank ICP Kit Training African Development Bank.
Vanche Gujarat Abhiyaan(VGA)- Best Reader Competition Online Student Registration and Data Entry presentation.
Explore the World with MapPoint Finding a Location on a Map Finding a Location on a Map – U.S only To find a location on a map 1.From the Start.
 The BPEL Module project is a group of source files which includes BPEL files, WSDL files, and XML schema files. Within a BPEL Module project, you can.
Basics of creating a Virtual Patient Centre for Medical & Healthcare Education eLearning Unit Steven Malikowski & Chara Balasubramaniam Press the F5 Key.
MagicInfo Pro Scheduler Now that a template has been created from content imported into the Library, the user is ready to begin scheduling content to.
 We are going to learn about programming in general…How to think logically and problem solve. The programming language we will use is Python. This is.
Promodel tutorial tutorial.
Open the Goodyear Homepage Click on Teacher Tools.
Problem Excel QM and Solver BY: Matthew Held These slides will walk you through solving this problem step by step Summarize problem information 3.
Screen ViewModule Title: Notes: Branching Instructions: Audio Script: Page: Messaging Configure the Address Book 1 Configure the Personal Address Book.
Welcome to MM305 Unit 6 Seminar Larry Musolino
Teach Yourself Windows 95 Module 4: Using Microsoft Exchange for Faxes and .
Using Microsoft Visual Studio C++ Express 2005 Name: Dr Ju Wang Ashwin Belle Course Resource:
Type To Learn. Accessing “Type To Learn” Go to Start menu, Select Programs and choose Education and then Select “Type to learn” Press “Ctrl+Alt+T” to.
Saint James School of Medicine.  Objectives:  Add course Information  syllabus  Lecture Notes, handouts, slides  Problem solving or discussion areas.
To create a new end item Navigate to the module: Logistics-> Material Management -> Material Master -> Material-> Create(general)-> Immediately.
Family Planning Research Center of Nigeria Case Study
Go to Start >> Programs >> Outlook Express ( as shown)
This is how you invoke the Microsoft Visual Studio 2010 Software. All Programs >> Microsoft Visual Studio 2010.
Welcome Unit 6 Seminar MM305 Wednesday 8:00 PM ET Quantitative Analysis for Management Delfina Isaac.
Introduction to Programming Python Lab 1: My First Program 8 January PythonLab1 lecture slides.ppt Ping Brennan
Case Study By: The South Group
Welcome to MM305 Unit 6 Seminar Dr. Bob Network Models.
Using Quickbooks to Record Business Transactions.
7 Adding Signatures to s Step 1 Click on ‘Tools’ option in the toolbar at the top of the page. Click on ‘Options’
Network Models Chapter 12
A tour of new features How to Solve Vipre Service Not Running Issue?
How to apply your signature
Click on the button Start.
Average Rebound Height
Chapter 4 MS ACCESS DATABASE.
AOL Customer Services For Instant Help Give a Ring on: Fix AOL Error 66 Dcvs.
Average Rebound Height
Network Models Chapter 12
Chapter 12 Network Models 12-1
Adding a Change Order RMS 3.0 GM.
Andrew-Carter, Inc. Issue: Due to the economic depression, A-C considers to close one of its 3 plants. The objective is to minimize the Cost. Setup: 1.
Business Statistics with Quantitative Analysis
Promodel tutorial tutorial ITSS - Modelos de simulación.
Horizontal Centering Using the menu bar
1. Open Visual Studio 2008.
5.5 Adding Photo Gallery Module
Prepared by Lee Revere and John Large
These slides are for reference only. They are not "lecture notes"
Network Models Chapter 12
Delete Comments After corrections have been made or you change your mind about something, you might want to delete the comment. Just highlight the comment.
Welcome to Army Public School, Bikaner
Presentation transcript:

Case Study By: The South Group Binder’s Beverage Case Study By: The South Group

Binder’s Beverages Business Problem Binder’s Beverages has a plant in Denver and a warehouse in east Denver. The problem is to get the finished product to the warehouse. There is a network diagram of the roads from the plant to the warehouse and the amount of time for each branch is given.

Binder’s Beverages What is the shortest route from the plant to the warehouse? To solve this we must first correct an error in the network diagram provided in the text book. This is the diagram as provided in the text. 2 4 8 5 7 9 3 6 1 10

Binder’s Beverages When looking at the information about how much time it takes on the branches to and from the nodes, it becomes apparent that there should be a branch connecting code 3 and 5. This is the corrected network diagram, with the added branch in red. 2 4 8 3 5 7 9 6 1 10

Binder’s Beverages Open QM For Windows. Select the modules drop down menu and select the networks option.

Binder’s Beverages Next open a new shortest route file.

Next Enter the number of branches for the problem. Binder’s Beverages Next Enter the number of branches for the problem.

Binder’s Beverages Fill in data grid with problem data. Also set the destination and origin. Solve the problem by clicking the solve button

Binder’s Beverages 7. The solution can be viewed in the data grid

Binder’s Beverages The shortest route is 1  2  4  8  9  10. It takes 65 minutes. The shortest route is shown in red on the following diagram. 2 4 8 5 7 9 3 1 6 10