Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.

Slides:



Advertisements
Similar presentations
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
Advertisements

9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Methodology Development Stage.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Aug. 22, 2007 CF7S Americas EDR Kick-Off A&E Selection the Fermi Process Tom Lackowski.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort Working Group C Conventional Facilities Parallel Session IRENG07 V. Kuchler, A. Enomoto, J. Osborne September 19, 2007.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Camera PDR/CD1 Planning 19 September 2008
Conventional Facilities and Siting Global Group (ARCFS)
Installation Global System
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Americas KlyCluster Cost Analysis Overview
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
JLEIC Accelerator R&D Meeting
Presentation transcript:

Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler

Feb. 06, 2007 BILCW07 Global Design Effort 2 EDR Defined We had 8 CF&S team members in a room this morning and –schedules –6 definitions of each line on the schedule means –9 definitions of what an EDR is –More than a few ways we might get proceed So we can still discuss some basic moves towards an EDR

Feb. 6, 2007 BILCW07 Global Design Effort T 0 = RDR/Reviews Bid to Host Specs Preparation of Bids to Host Site Selection Process EDR (All CFS) Site Investigations Call for Tender Preparation (CE Works + early Services) Call for Tender Procedure (CE Works + early Services) Contract(s) Placing (CE Works + early Services) Administrative Procedures + Site Preparation Utilities CE + other CFS Works Machine Supply, Install, Assembly Commissioning R&D TENTATIVE OVERALL TIME SCHEDULE 2018 Selection of Main Consultants Site Independent Eng. Studies (All CFS)

Feb. 06, 2007 BILCW07 Global Design Effort 4

Feb. 06, 2007 BILCW07 Global Design Effort 5 The basic charge for CF&S will be to progressively elaborate the Scope, Cost, and Schedule in order to define the ILC Conventional Construction. It will be increasing important to demonstrate and document that we have the accurately assessed the Scope, Cost and Schedule, and that there is a viable plan to accomplish the work. COST SCHEDULE SCOPE

Feb. 06, 2007 BILCW07 Global Design Effort 6 Determining the Deliverable Need to know where we are going! Establishment of EDR objectives. –Find & review similar reports that were used for previous projects – LHC – JPARK- SSC –Develop Straw man of Deliverables –Peruse concurrence with Area System leaders and EC –Update objectives as needed Define who the audience is Plan the work, schedule the work, establish milestones – seek concurrence at each step Develop project and management controls

Feb. 06, 2007 BILCW07 Global Design Effort 7 Project Management CF&S will increasing move to employ more formal project management tools. –Expanded WBS –Bottoms Up Cost Estimates –What – If Schedule Analysis –Integrated cost / schedule –Option Studies / Value Management Analysis –Risk Analysis / Risk Management –Plans for Managing the Project, for Acquisitions, for Configuration Control, Project Controls ….. –Internal Reviews – External Reviews

Feb. 06, 2007 BILCW07 Global Design Effort 8 Shared Scrutiny CF&S and the Area Systems will need to document, justify and defend the requirements. –Area system leaders will need to more formally establish who is responsible and who has the authority to provide requirements. Together we will need to justify requirements to reviewers. Communication paths, the single points of contact, will be re- established. –Formal change control will need to be established by CF&S. This control system will track requirement changes below the project Change Control level. The cost it will take in terms of time and currency to incorporate changes will increase as the designs progress. Area Systems managers will need to formally accept designs at various levels of development.

Feb. 06, 2007 BILCW07 Global Design Effort 9 Additionally CF&S will need to develop options in response to Value Management Analysis, reviews, the EC and other contributors –Will need to choose which studies to spend resources on. –Will need Area System support to develop alternative designs, without derailing main path of development. One such study, near surface siting, will need Area System input in order to develop a defendable option study cost estimate.

Feb. 06, 2007 BILCW07 Global Design Effort 10 Effort Levels The CF&S effort will need to ramp up sharply over the next three years in order to complete what we perceive is required for the EDR. A parallel effort to develop regional selection documents will add to the EDR effort. Regional support and funding is under discussion, but not firm enough to make financial commitments. All regions have limited available in- house engineers. Will need to through expanding A&E consultants.

Feb. 06, 2007 BILCW07 Global Design Effort 11 Outside the GDE Concurrent with the EDR the Regional Site Selection (RSS) process must begin; How each government will address this task is not clear. Who will prepare the proposal Under what government department / ministry Does the GDE issue a Request for proposal? –Requirements, criteria and scope documents established in EDR is expected to be input to RSS Criteria quantifying such things as reliability, stability, and vibrations will part of the technical requirements.

Feb. 06, 2007 BILCW07 Global Design Effort 12

Feb. 06, 2007 BILCW07 Global Design Effort 13 Firm #1 – General Architect/ Engineering Firm ($1,000K to $2,500K) This firm will provide professional architectural and engineering services to support the ILC mission. The general scope of this work may include: Condition Assessments; Surface Building Programming: Site Planning; Building design; Conceptual Design Studies and reports Value Management Analysis Firm # 2 – Underground Engineering Expertise (at least three firms anticipated to be selected) ($5,000K to ($10,000K) Design, cost estimating, and scheduling of hard rock tunnels, caverns and halls. Design, cost estimating, and scheduling of soft rock tunnels, caverns and halls. Design, cost estimating, and scheduling of open cut enclosures. Conceptual Design Studies and reports Presentation Drawings: Value Engineering Analysis Soil borings, and the associated field and laboratory analysis. Geotechnical Reports Geotechnical baseline reports

Feb. 06, 2007 BILCW07 Global Design Effort 14 Firm # 3 – Site Civil Expertise ($500k to $1,000K) This firm will have the expertise in civil engineering discipline including the following: Topographic surveys Storm water hydraulics Storm Sewer design Domestic water well systems, and distribution system design; Establishment of GIS Firm # 4 Electrical Expertise ($300K to ($900K) This firm will have the expertise in the electrical discipline including the following: Conceptual design capabilities to optimize scope, cost and schedule Feasibility studies, project development planning, technical evaluations and recommendations and front-end engineering. Technical studies, calculations and design reports including electrical load flow analysis and short circuit analysis High voltage transmission line engineering and high voltage substation design, including system feasibility studies and system economic evaluations Medium voltage substation engineering and medium voltage distribution systems, including system feasibility studies and system economic evaluations Onsite & Standby Generation for emergency power systems including system feasibility studies and system economic evaluations History of interfacing with Exelon/ComEd in high and medium voltage systems

Feb. 06, 2007 BILCW07 Global Design Effort 15 Firm # 5 Process Cooling and Mechanical Engineering ($600K to $1,200K Refine/Finalize heat load and water System for Sources Provide Water System Design on Area Systems LCW system and distribution design Investigate Water Distribution in BDS dump Investigation of Heat dissipation to Air Value Engineering Review of RDR Water System Concept Bottoms up Cost Analysis Analysis of Site Impact of Process Water Cooling Investigation of Impact on Power from Cooling System Choices Analysis for the piping options for Low Conductivity Water system Cost/benefit analysis of various HX approach temperature Optimization of Skid Distribution Air System optomization Firm # 6 – Life Safety Engineer ($300K to $700K Fire Protection Engineering services Prescription baseline criteria or performance based analysis If required, fire modeling growth including smoke migration and suppression/extinguishing systems Evacuation modeling including compartmentalization and/or refuge areas Establishing criteria for suppression/extinguishing, detection, communication, & smoke management systems Establishing criteria for emergency illumination and power systems Code equivalency documentation and negotiation with authorities

Feb. 06, 2007 BILCW07 Global Design Effort 16 Firm #7 – Configuration Controls and Project Controls Systems ($400K to $1,200) This firm will have expertise in development of developing and various project configuration control and project control systems. It is anticipated that many of the project controls will be in force at some point during the EDR / Develop and maintain the CF&S project management documents such as Project management Plan, Acquisition Plans Assemble and maintain the CF&S intergraded cost / schedule derived from a number of other firms. This task would include resolving project cost/ schedule with various provided funding profiles. This cost / schedule will be incorporated into an overall project cost / schedule. Develop and maintain earned value system. Establish project control tools for the Construction Management of the CF&S work. Project status reports Firm # 8 – Environmental, Safety and Health (($300K to $600K) Preparation of Environmental Assessments Preparation of regulatory and permit submittals Preparation of Lead Analysis Firm # 9 – Land Acquisition Support ($200K to $500K) This firm will have expertise in developing strategies in land acquisitions. The governing body that will accomplish the acquisition of surface land and sub-surface rights or easements has not yet been determined. In order to support the project and whichever governing body that will accomplish this task, the effort to define the land acquisition requirements ….