“Landfill Final Cover Stormwater Drainage” Mark A. Taylor, PE EcoLogic Associates, P.C.

Slides:



Advertisements
Similar presentations
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Advertisements

Leachate Collection Systems. Class Objectives  To discuss landfill water balance  To present liner and leachate collection system (LCS) design information.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
1 CTC 261 Hydraulics Storm Drainage Systems. 2 Objectives Know the factors associated with storm drainage systems.
CE 3372 Storm Sewer Conduit, Junctions, Inlets. Storm Sewers 0 Inlets capture stormwater 0 Junctions connect laterals to trunk lines. 0 Conduits (pipes)
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Measuring Erodibility of Cohesive Soils By Gregory J. Hanson USDA-ARS Hydraulic Engineering Research Unit.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Pond and Wetland BMPs, Retrofitting Detention Basins.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR LID FACILITY DESIGN Prepared.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
CE 515 Railroad Engineering
Env 247 Overview of Stormwater Management March 1, 2011.
Design of Hydraulic Controls & Structures
Drainage System Design and Layout. Design Process Flowchart Background Information (Soils, Topo, Crops) Confirm Outlet Drainage Needed Select DC, Spacing.
CE154 Hydraulic Design Lectures 8-9
Design of Open Channels and Culverts CE453 Lecture 26
Design of Open Channels and Culverts
CE 3372 Water Systems Design
Surface Drainage CE 453 Lecture 25.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Design of Grass Swales Norman W. Garrick
 An adequate drainage system for the removal of surface and subsurface water is vital for the safety of aircraft and for the long service life of the.
Curt Madsen, P.E. TRC Environmental Corporation November 28, 2012 Landfill Leachate Collection System Design CEE 427.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
DIMITRI LAZARIDIS AND PHILIP APPLETON SUCCESSFUL GOLF COURSE DRAINAGE.
UNIFORM FLOW AND DESIGN OF CHANNELS
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Open Channel Flow Closed pipe Pump or fan driving force No free surface Open channel Gravity driving force Free surface.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Design of Infiltration Practices
Vegetated Filters Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
CTC 440 Review Determining peak flows Rational method Q=CIA
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
Urban Storm Drain Design: Rainfall-Runoff relations.
Landfill Installation Considerations – Solar PV By: Gary Garfield, PE, LSP URS Corporation Salem, New Hampshire Renewable Closed Landfills.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
STORMWATER MANAGEMENT
An-Najah National University Engineering College Civil Engineering Department Project title : Management of stormwater for a portion of Faisal street “Nablus”
CTC 261 Culvert Basics.
Basic Hydraulics: Culverts – I
CE 3372 Water Systems Design Lecture 17: Storm sewers, inlets, conduits and related hydrology and hydraulics.
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Basic Hydrology & Hydraulics: DES 601
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Landfill Closure SWANA November 2015.
Basic Hydraulics: Storm Water Management concepts
1 Structural Control Practices ©2002 Dr. Bradley C Paul.
IRON HORSE PARK (SHAFFER LANDFILL) Don McElroy, EPA Region 1, Remedial Project Manager Source:
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Critical Components July 26, 2012 John Carrigan MassDEP Northeast Regional Office.
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Construction Inspection for FO Activities - Geosynthetics
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Design and Construction of Composite Lined Landfills
Bridges Reach analysis Fundamental tool for design
Norman W. Garrick Design of Grass Swales.
Designing Swales Norman W. Garrick CE 4410 Spring 2017 Lecture 15.
INDOT Culvert Sizing Policy
CE 3372 Water Systems Design
CTC 261 Hydraulics Storm Drainage Systems
Love Field Modernization Program
PWCS Fifth Edition DIVISION 1000 Edits
Presentation transcript:

“Landfill Final Cover Stormwater Drainage” Mark A. Taylor, PE EcoLogic Associates, P.C.

Purpose To Review the Design of Stormwater Management Features for a Landfill Final Cover and Propose a Design Strategy

Presentation Overview Final Cover Design Considerations Stormwater Drainage Considerations and Design Guidance Removal of Stormwater Runoff - H&H Analyses Other Drainage Considerations Conclusions

Final Cover Design Considerations - Functions Waste and By-products Containment Rainfall Infiltration Barrier Landfill Gas Barrier Odor and Vector Control Aesthetics (“Reclamation”)

Consequences of Failure Cover Damage (Structural) Erosion and Sedimentation Releases to Surface Water and Air Health & Safety (Vectors, Fire, etc.) Compromise of Leachate Collection and Landfill Gas Systems Increased Post-Closure Maintenance Costs

Final Cover Design Considerations - Owner Expectations Frequency of Failure Maintenance Requirements Cost (Construction & Post-Closure)

Final Cover Design Considerations - Design Factors Final Configuration and Post-Closure Use Removal of Stormwater Durability Stability Erosion and Sediment Control Constructability and Maintainability Cost

Principle Stormwater Drainage Considerations Removal of Stormwater Runoff Cover Stability Erosion & Sediment Control Durability, Constructability, and Maintainability

Deficiencies in Design Guidance How to handle Long, Steep Slopes in general Criteria for Diversion Channel Design on Side Slopes (longitudinal slope, spacing, freeboard) Design Storm Selection Accommodation of Differential Settlement Failure Criteria and Replacement Frequency

Hydrologic & Hydraulic Analyses Layout the System, Calculate Runoff Size Diversion Channels and Berms Select Channel Lining (Iterative) Design Downslope Conveyances (Slope Drains, Inlets and Conduits) Adjust the Layout as Necessary

System Layout Do Conceptual Layout of Diversion Channels (Berms) and Downslope Conveyances (e.g., Slope Drains) Experience in Temperate, Piedmont Mid- Atlantic Region where Annual Rainfall  40” Diversion Spacing = feet Downslope Conv. Spacing = feet

Calculate Runoff Rational Formula Q = CiA (cfs) C = Runoff Coeff. (Use 0.6 or higher for Side Slopes, 0.45 for 5%-10% Top Slopes) i = Rainfall Intensity (Use 10 Yr., 5 Min. Storm, T c less than 1 Min.) A = Drainage Area (A max is typically  2 acres)

Diversion Channels and Berms TRIANGULAR CHANNEL FLOW Manning’s Eqn. V=1.486/n x R 2/3 x S 1/2 (fps) Continuity Eqn. Q=AV (cfs) Solve for d = Flow Depth (ft) and V (fps)

Diversion Channels and Berms Assume values for ‘n’, Consult Mfrs. specs and adjust for impediments to flow Recommended range of slope,S = 3-5% Continue with Iterative Design, varying n, S, and layout as needed for workable ‘d’ with freeboard (minimum 1 foot recommended)

Channel Lining Calculate Tractive “Force”, T T = y x d x S (psf) For low V,T Use a temporary erosion control mat For high V,T Use a non-degradable turf reinforcement mat (TRM) For very high T Use rip-rap or SI’s Pyramat®, a permanent erosion and reinf. matrix

Slope Drains Corrugated HDPE with Sewer-type, ‘Soil- tight’ Connections are Recommended Inexpensive; Ready to Install; Quick Construction; Place Directly on Prepared Subgrade, Geosynthetics, or Infiltration Layer Pleasing Aesthetics, Ease of Maintenance

Slope Drains - Inlet Design Assume Inlet is a Sharp-crested Weir Weir Eqn. Q = 3.33LH 3/2 (cfs) Solve for L based on flow from one direction For Circular Inlet, L max =  D/2, Use L min =D TYPICAL RESULTS D min = 2 Ft. (Side Slopes), 3 Ft. (Top) Use a Splitter-Type Anti-Vortex Device

Slope Drain Inlets Check for Hydraulic Jump where channel widens at Inlet Check Critical Depth, d c, to see if flow will go from supercritical to subcritical When Specific Energy is at its minimum (Critical Depth), d c = 2 x V 2 /g (ft) Assume a Hydraulic Jump, Calculate d 2 by trial and error (Formula in paper)

Slope Drain Conduits PROPOSED DESIGN CRITERIA Pipe should not flow full to avoid “slugging” Assume/assure exit is “free” (Unsubmerged) Assume/assure all flow is Supercritical (pipe slope exceeds critical slope) Assume entrance is submerged (Orifice entrance condition)

Slope Drain Conduits Orifice Eqn. Q = C d x A x (2g(h-a)) 1/2 (cfs) Use C d = 0.6 and h from Inlet Design, then Simplify and Solve for Dia., d (2a or (4A/  ) 1/2 ) by trial and error. TYPICAL RESULTS Use 15- and 18-inch Diameter Pipe

Slope Drain Conduits Check Flow in Corrugated/Smooth HDPE Pipe Avoid disruptions to flow where flows from inlets converge; thus, use Wye connections Check Pipe Capacity as Flows Accumulate Specify Watertight Connections and Provide Anchorage Provide robust Energy Dissipation and Outlet Protection at the outlet

OTHER DRAINAGE CONSIDERATIONS

Drainage Effects on Veneer Stability Calculate Maximum Spacing of Drainage Outlets (Diversion Channels): L max = k 2 /k 1 (sin  )(h 2 ) (After Thiel and Stewart (1993)) Note that, for a given L, the ratio of Drainage Layer permeability, k 2, to Cover Soil permeability, k 1, has a Minimum Value in order to Maintain Stability

Erosion & Sediment Control Careful and accurate grading Pre-vegetation protection (critical) Liberal use of geosynthetics Vegetation selection and soil analysis Stormwater detention, sediment storage Proper and regular Maintenance

Durability, Constructability, and Maintainability Durability (Geosynthetics (TRM’s), Drought-resistant Vegetation, Flexibility (Soft Armor, Slope Drains)) Constructability (Uniform Slopes, Slope Drains, Geosynthetics (RECP’s)) Maintainability (Smooth Slopes for Mowing, RECP’s reduce Repairs and Sediment Removal, Clog-free Slope Drain Inlet Grates) Good Layout and CQA Testing and Surveying

CONCLUSIONS Landfill Final Cover Design is a Complex Process Involving Many Factors Landfill Owners need to Recognize Challenges and Should Establish Clear Design Goals and Realistic Budgets Erosion and Sediment Control is a Critical Item in Post-Closure Maintenance

CONCLUSIONS Short- and Long-term Cost-effectiveness are Potential Benefits of Improved Stormwater Management A Rigorous Design Approach to Stormwater Management and Erosion & Sediment Control is Recommended

QUESTIONS?