Tullamarine Rehabilitated Landfill > 26 November 2014.

Slides:



Advertisements
Similar presentations
Introduction. What is ISO14001? A documented system of all impacts a company are having on the environment. A detailed strategy to reduce these impacts.
Advertisements

Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Your logo here WasteMINZ Mid-Year Roundup Wellington.
© 2013 Sri U-Thong Limited. All rights reserved. This presentation has been prepared by Sri U-Thong Limited and its holding company (collectively, “Sri.
2014 Vapor Intrusion Guidance Amendments Discussion Points Waste Site Cleanup Advisory Committee Meeting May 22, 2014.
BoRit Superfund Site Timeline
Environment Engineering I
Water and Wastewater Focus Wireless Sales Push 2009.
Part III Solid Waste Engineering
Further Site Investigation Sutton Walls Former Landfill
S53X Environmental Audit – 140 to 204 Western Avenue, Westmeadows VIC Anthony Lane Tullamarine Community Meeting, 12 March 2014.
Western Ave S53X Audit  12 th March 2014  7 pm Mantra.
Tullamarine Rehabilitated Landfill > 27 November 2013.
Bioremediation of contaminated soil. ..our focus is service…guaranteed! Root causes of oil spillages and site contamination Hose failures on mining machines.
Air Force Plant 4 Superfund Site Evaluation of SVE Combined with ERH for the Remediation of TCE Source Material Jeffrey Ragucci SWS 6262 – Soil Contamination.
“GAS MART” petroleum facility in Florida By: Ernest Twum-Barimah Zhengzhong Fang (John) Zhengzhong Fang (John)
It’s not my Fracking Problem! Regulations, Liability, and the Process of Hydraulic Fracturing Katie Heath November 30, 2010.
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
BIOMASS POWER PLANT Jo-Carroll Energy, Inc. (NFP).
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
Rhode Island Department of Environmental Management
Sustainability and Best Management Practices Environmental Remediation Russell Downey Pfizer Global Engineering 5 November 2014.
WELCOME: EPA PUBLIC MEETING
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
1 Facilitating Reuse at RCRA Sites: Innovative Technologies for Groundwater Characterization and Cleanup Introduction Walter W. Kovalick Jr., Ph.D. Associate.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
ESTA Technical Standards Committee Product Stewardship.
WasteSection 3 Section 3: Hazardous Waste Preview Bellringer Objectives Types of Hazardous Waste Resource Conservation and Recovery Act The Superfund Act.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Jan Smolders ( 史默德) Independent Consultant Soil & Groundwater Remediation Jan Smolders, Client Advisor Soil & Groundwater Remediation 1.
TURNING BROWNFIELDS. Definition US EPA 1997 abandoned, idled or under-used industrial and commercial facilities where expansion or redevelopment is complicated.
First Generation Magnox Storage Pond (FGMSP) Programme Partner Requirements February 2014 Steve Topping.
WasteSection 3 Types of Hazardous Waste Hazardous wastes are wastes that are a risk to the health of humans or other living organisms. They may be solids,
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
LIFE AFTER LANDFILL – THE TRANSITION FROM LANDFILLS TO RESOURCE RECOVERY AND TRANSFER STATION 27 September 2007 "Planning – Guidance on Planning Issues.
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
Monitored Natural Attenuation and Risk-Based Corrective Action at Underground Storage Tanks Sites Mike Trombetta Department of Environmental Quality Environmental.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines June 17, 2009 Mark Dakers, Environmental Analyst Massachusetts.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
South Australia’s Environment Protection Authority Articulating aesthetics Monday 24 August 2015 Andrew Pruszinski.
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
A presentation for by ROUX ASSOCIATES, INC. Environmental Consulting and Management International Petroleum Environmental Conference 22.
Feb. 2006IHA/pm1 Site remediation 1 Planning site remediation Excavation: Pros/cons & How.
UK Tour de Table NATO/CCMS Pilot Study Baia Mare, Romania 2003 Dr Theresa Kearney.
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
PALERANG COUNCIL Proposed Special Rate Variation 2016/ /21 Public Exhibition : Draft Long Term Financial Plan and Draft Delivery Program (as amended)
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Evaluating the Practicality of LNAPL Recovery Jeff Lane, P.G. November 17, 2015 International Petroleum Environmental Conference (IPEC) IPEC 22 Contact.
By Alex Walton Josh Bush Alex Walton, Josh Bush1.
David K. Paylor Virginia State Board of Health March 17, 2016.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Towage Procurement Process – Industry Briefing 05 May 2014.
Groundwater Pollution
Permission to reprint or distribute any content from this presentation requires the prior written approval of Standard & Poor’s. Copyright © 2011 Standard.
Results of the Review of MSW Landfill Regulations from Selected States and Countries Landfill Facility Compliance Study presented to California Integrated.
Proposed Plan for No Further Action
Sustainable Remediation Case Studies
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
Common method of solid waste disposal.
Lecture (5): Waste treatment and disposal
ASSESSMENT OF CORRECTIVE MEASURES PUBLIC MEETING
Mark Bennett, Head of Agribusiness, ANZ
Scientific or Engineered Landfilling of Waste
Environmental Upgrade Finance
© 2013 Sri U-Thong Limited. All rights reserved
Presentation transcript:

Tullamarine Rehabilitated Landfill > 26 November 2014

Post Closure Management Plan Progress 2 Mounds 1 & 2 Cap Construction Drainage connection approved by Tender & Works Melb Water & SEWPaC Works Commence 2014/15. Liquid Product (LNAPL) Extraction (Feasibility trial commenced 2014) Landfill Gas Management (Landfill Gas Sampling and Perimeter Monitoring completed 2013 & final flare design & install 2014) Groundwater & Surfacewater Management (Risk Assessments Completed in 2004 & 2007 and Indicated Low Risks. A technical review was completed in 2011/12 of over 100 boreholes and along creek continues to confirm the same). Cap Audit Completed Groundwater Management Protocol (Approved by SRW) Cap Water Gas Oil Green Arrows = Water Act Vic, 1989 Deliverables Grey Arrows = Environmental Protection Act Vic, 1970, Deliverables Next Review 2014/15

Deliverables (Anticipated Dates) >LNAPL Trial Practicability Assessment (March 2015) >Groundwater technical review (March 2015) >Groundwater management plan update (March 2015) >Landfill Gas Audit (September 2015) >Stormwater Connection (Construction to Commence Summer 2014/15) >Landfill maintenance (mainly mowing - ongoing) >Ongoing monitoring (landfill gas, groundwater)

LNAPL Trial Remaining Tasks >Consultation (workshop & questions tonight) >Questions are able to be put to EHS (and the IRP) until end of December (note now end of February 2015 as discussed in meeting) >Draft report issued to community mid to late January >Special meeting with EHS & A. Lane mid February >Practicability Assessment Report (Issued March 2015) >The Practicability Assessment Report will include consultation process and responses to questions from community.

Reminder - What does the EHS report mean? >The trial has shown LNAPL extraction is not feasible because the volumes and recovery rates are so low >At current levels of recovery extraction will take in the order of 1,000 years >The LNAPL is effectively immobile >Other technologies were ruled out during planning / design because of risks to cap integrity and/or risk of mobilising contamination

>The EHS information is indicating further field trials are not justified >However it is only fair that the community and stakeholders have time to consider the detail in the technical information Reminder - What was proposed?

>Biodegradation is occurring in the landfill >Microbial bugs consume the easier less viscous (thinner more mobile) compounds first leaving thicker and less mobile compounds until last >Biodegradation is happening because : >The landfill temperature is declining >The landfill gas production is also occurring (and declining) Why is it so difficult to extract?

>It won’t move >It will eventually turn into an inert material that looks something like black carbon >It will undergo anaerobic biodegradation and this will be explored in the EHS Practicability Assessment report (the process is called anaerobic reductive degradation and includes dechlorination, ie, chlorine in PCB is removed) >Transpacific will continue to monitor What will happen to the LNAPL?

Next Steps >Opportunity to ask questions and seek clarification. >Reports were made available on the community web site. >Consultation continues beyond the original 6 to 8 weeks envisaged from the 15th Sept (when the community can ask questions / comment on the reports). >Opportunity to ask questions at tonight’s meeting.

>Transpacific to make EHS and the Independent Review Panel available for questioning (tonight). >Transpacific will use tonight’s meeting to assist the community formulate questions to our experts. >We will take further questions until end of December (now end of February) and EHS can respond in detail in the Practicability Assessment report (March 2015). >Site visit to the Landfill (two members attended) Next Steps ctd…

Hydraulic Containment Impermeable Barrier Excavation and Disposal In-Situ Vitrification In-Situ Cement Solidification Fluids Extraction Active Skimming Belt Skimming Steam Injection Resistive Heating Solvent Extraction Surfactant Flushing Air Drive / Water Flood Vacuum Extraction Vacuum Enhanced Hydraulic Recovery In-Situ Chemical Oxidation (ISCO) Bioremediation Reminder of The Technology Screen

Health, safety and environmental impacts/ risks, including: Generation of vapour / dust emissions Penetrations through and/ or damage to the land fill cap Permanent changes in LNAPL characteristics LNAPL mobilisation Landfill fires LNAPL storage and handling Technology Considerations

>Cap (Installed) >Hydraulic Control (Assessments will be completed March 2015 – SRA, HA and LNAPL Trial) >Gas Collection and Emissions Flaring (Installed and currently undergoing confirmatory assessment). >GW & LFG Monitoring (Monitoring network installed and monitoring is ongoing) >Natural Attenuation [attenuation assessment completed for the Technical Review (TRAR), currently being reviewed by Auditor]. Multiple Technologies Employed at Tullamarine Landfill

Technology Considerations >The Natural Attenuation assessment indicates dissolution from LNAPL (until it naturally depletes) will be managed effectively via Monitored Natural Attenuation. More to report on this at the next meeting. >The landfill gas collection system vacuum can be considered as an active management measure for collecting vapour emissions and assisting with stripping volatile components of the LNAPL which are typically the most soluble as well.

After R. Charbeneau, 2012 Mobility Over Time Time (Years) Tn (m 2 /d) Data from US

After T. Sale, 2012 Recovery Rate Over Time ML First liquid disposal about 1973 & last disposal in 1987 (about 40 years since first disposal & 27 years since last disposal. Time (Years) Extraction Only Bio degradation Only Extraction + Bio degradation Data from US

Tullamarine Landfill >The landfill is in the period between ability to practically extract and LNAPL being absorbed to clay particles >Note that intervention has potential to cause greater harm

Biodegradation Processes

Biodegradation Processes - Landfill

LNAPL Leachate Waste Cap Gas Collection Layer Flare Biological Activity Biodegradation Processes - Landfill Biological Activity

50 mg/kg NEPM Soil Guideline for Industrials Sites Location PCB Concentration (mg/kg) L115 L421 L529 Well 631 L738 L1360 L14102 L3102 L8106 L12123 L1188 L2210 Well L9215

Monitored Natural Attenuation

Natural Attenuation and Biodegradation >Biodegradation via anaerobic reductive dechlorination and volatilisation enhanced with the landfill gas collection system. These two process are likely the key ones for the ultimate degradation of the LNAPL at the site. >LNAPL at Tullamarine is more complex than “standard petroleum site”. Biodegradation is also considered important for a wide range of contaminated sites and as such has much wider applicability than just standard petroleum sites.

Biodegradation (US EPA Fact Sheet)

>“Fortunately, petroleum hydrocarbons appear to degrade to less harmful products in almost all cases.” USEPA Remedial Technology Options Fact Sheet ‘Monitored Natural Attenuation of Petroleum Hydrocarbons’ Biodegradation (US EPA Fact Sheet)

Disclaimer This document has been prepared by Transpacific Industries Pty Ltd (ABN ) (“Transpacific”) for the purposes of providing the recipient with an update on the status of rehabilitation works at Tullamarine landfill site. This document has been prepared on the condition that it is for the exclusive information and use of the recipient. This document may not be reproduced, distributed or published by any person for any purpose. No part of this document may be quoted or referred to in any other document. With the exception of information provided by external sources, Transpacific retains all applicable intellectual property rights which arise from the creation of this document. This document is subject to the limitations, assumptions and qualifications referred to in it. In addition to any other rights available to them, Transpacific or any related party (“Transpacific Parties”) herein expressly advise that they: 1.make no representation or warranty, express or implied, as to the accuracy, currency, reliability or completeness of any statements, estimates, opinions or other information contained in this document; and 2.to the maximum extent permitted at law, the Transpacific Parties are not responsible or liable in any way whatsoever for any claim, loss, damage, cost or expense, whether direct, indirect, consequential or otherwise, arising (whether in negligence or otherwise) out of use or reliance on this document, its contents or any omissions from it. Transpacific Parties means Transpacific, its related bodies corporate, directors, officers, employees, representatives, consultants and agents; and a Transpacific Party means any of them.

Thank you for your time