National Impact Assessment Programme (NIAP) Public Participation in EIA – How Can it Help in Resolving Conflict ? Asadullah Faiz, Director General, Pakistan.

Slides:



Advertisements
Similar presentations
Head of Policies & Planning Division Ministry of Environment
Advertisements

8-11 September 2008 Chiang Mai, Thailand Experiences of Dhaka SoE Report Process, Policy Impacts, Weakness/Areas of Improvement? UNEP/IEA Methodology for.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Social and Environmental Dimensions of Large-Scale Land Acquisition of Land Rights ZAMBIA Davison Gumbo.
HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
Bic river basin management plan and involvement of local authorities in the implementation of the program of measures Dumitru Drumea, Executive Director,
NATIONAL SOLID WASTE MANAGEMENT PROGRAMME RIVERTON LANDFILL.
Part III Solid Waste Engineering
Japanese Experiences in Urbanization & Urban Planning System in Japan JICA Expert Kenichi WAKAMATSU 23 Aug.2001 Jakarta.
Oil for Development – OfD November 2007.
Waste Sector Problems during INC preparation Eng. Saber Mahmoud Osman Environmental Researcher Climate Change Unit Climate Change Unit Egyptian Environmental.
INTEGRATED PLANNING: THE LINKS BETWEEN URBAN WASTE MANAGEMENT, SANITATION AND ENERGY.
“Building Effective Public Participation in Environmental Impact Assessment in a Transboundary Context” in Bulgaria Institute for Ecological Modernisation.
Local Self Government in environmental management Jadranka Ivanova Head of EU Department Ministry of Environment.
National Impact Assessment Programme (NIAP) Prospects of Strategic Environmental Assessment in Pakistan Case Study of “Clean Drinking Water for All” Programme.
Wenxin Zhang Department of Civic Design University of Liverpool
Public Disclosure in Vietnam National Environment Agency.
RECOMMENDATIONS TO SAARC TO ADDRESS URBAN ENVIRONMENTAL CHALLENGES AND POVERTY ALLEVIATION IN THE REGION.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA): A Way for NGOs to be Effective by Robert B. Smythe, Ph.D.
Institutional Set-up and Staffing Arrangements for FNR_Rio Project in Afghanistan 26 January 2011 Mauritius.
CEMEPE Skiathos island, June 2007 Business activities in the environmental sector in Greece: Current status and prospects E. Kondili 1 *, J. K. Kaldellis.
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
BUILDING SUSTAINABILITY: PARTNERSHIPS AND FINANCE by S. Adrian Ross Senior Programme Officer PEMSEA.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Monica Brezzi – Francesca Utili Department for Development Policies Ministry of Economic Development 17 th session of the Territorial Development Policy.
Compliance and Enforcement Priorities and Successes in Indonesia 2008 AECEN Regional Forum November 25, 2008 Bali, Indonesia Rosa Vivien Ratnawati MINISTRY.
Country Summary for Ukraine (part 1) status for Roman Volosyanchuk, IUCN CPC.
MOVING TO GREEN TECHONOLOGIES VODAFONE GHANA EXPERIENCE by Mamle Asare Sustainability Manager Vodafone Ghana.
0 Tadas Matulionis Lietuvos Energija AB Strategic planning manager Minsk, December 07, 2007 Environmental Impact Assessment of a New Nuclear Power Plant.
Consultant: CMDC Joint Venture Reflections on draft Recommendations for Revision to Administrative Regulations: By Norman Sheridan, Legal & Institutional.
National Impact Assessment Programme (NIAP) Is Effective EIA practice possible when socio-economic development is slow? The case of Pakistan IAIA 2011.
Development of Environmental Law in China: Prof. Dr. Qin Tianbao Research Institute of Environmental Law Wuhan University.
Challenges to Separate Collection: The Case for Turkey Novotel, Bucharest, Romania Mete IMER.
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Ingunn Selvik Norwegian Pollution Control Authority.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
1 BULGARIA PUBLIC- PRIVATE PARNERSHIP FOR REMEDIATION OF HISTORICAL POLLUTION Dr. Vania Grigorova Ministry of Environment and Water Bulgaria Managing for.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
EIAReview11.07(Gajaseni, 2007)1 Reviewing. 2 Reviewing is the process of EIA report assessment produced during EIA process is concerned with assessing.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
Social Acceptance of Waste Management Facilities A real challenge Experience from Tunisia.
SEA in the Czech Republic Prague, 24 September 2008.
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Legal aspects of brownfield redevelopment in Latvia Edmunds Teirumnieks.
Institutional Set-up and Staffing Arrangements FNR_Rio Project Afghanistan 13 March 2012 Tehran, Iran.
Promoting Regional Green Development BRUNEI DARUSSALAM’S BRUNEI DARUSSALAM’SPERSPECTIVE ASEAN-China Environmental Cooperation Forum Naning, China 22 October.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
National Impact Assessment Programme (NIAP) Using EIA Mapping to Identify Priorities for EIA Strengthening in Pakistan EIA Mapping Workshop IAIA 2011 Puebla,
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
The World Conservation Union Objectives of the Workshop Mohammad Aqib Pakistan Clean Air Network IUCN Pakistan National Workshop on Urban Air Quality &
DEVELOPING THE WORK PLAN
Solid Waste Management Department of Geology and Environment science at Islamic University of Gaza (IUG) - represent- -March Presented by Prof. Dr.
CAPACITY BUILDING FOR ENVIRONMENTAL ASSESSMENT IN TANZANIA H. Sosovele Institute of Resource Assessment University of Dar es Salaam.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 Ministry of Environment and Spatial Planning of Kosovo Mr. Muhamet Malsiu, Acting Head.
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Participatory Environmental Governance : Role of Communities in Europe and Asia Jona Razzaque Reader in Law Bristol Law School, UWE, Bristol, UK Bristol.
STATUS OF IMPLEMENTATION OF 2015 ACTION PLAN ENVIROMENTAL PROTECTION AGENCY A PRESENTATION TO THE REGIONAL COORDINATING COUNCIL Sally Biney Director/EPA/ACCRA.
CARICOM WORKSHOP ON ENVIRONMENT STATISTICS St. Vincent and the Grenadines 7 th and 8 th April 2014.
ISO Session 3 Environmental Management and Ethics in Management.
United Nations Environment Programme
State Audit Bureau of Kuwait
Office of Legal Affairs
Lao People Democratic Republic
“Developing Solid Household Waste Management in Ukraine”
Debbie Kopsick EVPP 991 February 22, 2007
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
Scenario Analysis Based on Life Cycle Assessment Approach
Presentation transcript:

National Impact Assessment Programme (NIAP) Public Participation in EIA – How Can it Help in Resolving Conflict ? Asadullah Faiz, Director General, Pakistan Environmental Protection Agency IAIA 2011, Puebla, Mexico

National Impact Assessment Programme (NIAP) Contents Introduction Kurri Landfill Project Design Considerations EIA, Review Process and Public Consultation Challenges Conclusions Way Forward

National Impact Assessment Programme (NIAP) Introduction Pakistan (South Asian Country) Pakistan – Population: million – Area: 796,095 sq km – GDP: US$ Billion – Per Capita Income: US$ 1051 ( ) Islamabad (Capital City) – Population: 1.33 million – Solid Waste Production: tons per day – Capital Development Authority (CDA): Municipal authority to provide civic amenities for Islamabad

National Impact Assessment Programme (NIAP) Introduction Planning and Development Division, Government of Pakistan – 5 Year plan for developing 5 landfill sites in Pakistan – Kurri at Islamabad (the 1 st project)

National Impact Assessment Programme (NIAP) Kurri Landfill Project Integrated Waste Management Project Design: International Standard & Specifications Area: Hectares Assessment of Alternate Sites Land recommended by Civil Aviation Authority (CAA), Pakistan Council of Scientific and Industrial Research (PCSIR) and Pak-Environmental Protection Agency (Pak-EPA) Acquisition of Land

National Impact Assessment Programme (NIAP) Kurri Landfill Project Facilities at the Landfill Site – Composting Facility – Leachate Treatment Facility / Gas Collection Facility – Environmental & Waste Management Training Institute for Training of Staff – Ancillary & Support Facilities – Waste Transfer Station / Material Recovery Facility

National Impact Assessment Programme (NIAP) Design Consideration Technology: Anaerobic Life Span: 22 – 25 years Specific Pollution Control Technologies Technical Studies / Technical Experts Inputs Development in 3 Phases to Minimize Construction Period Noise and Vibration Air Pollution Topography, Geology and Soil Surface and Ground Water Ecology

National Impact Assessment Programme (NIAP) EIA, Review Process and Public Consultation EIA Submission, Review by Pak-EPA & Committee Public Consultations – 7 Public Consultations Public Hearing – Attended by 179 representatives Meetings of all Stakeholders – 5 Consultations with Local residents, Environmentalists, NGOs, Educationists, CDA, Consultants, Media Representatives, NGOs, WWF, IUCN, International Experts, etc. Conditional Environmental Approval by Pak-EPA – 28 th Feb, 2008 Writ Petition in the court of law – 3 rd July 2008

National Impact Assessment Programme (NIAP) Challenges Lack of Political Will Lack of Vision Tyranny of Participation Social Issues – Paternalistic Societies, Interest Groups, Compensation, Resettlement, etc Lack of Trust Between Communities and Municipal Authorities Regulatory Challenges

National Impact Assessment Programme (NIAP) Conclusion Relevant Stakeholders to be consulted from inception stage Writ of the Government to be exercised judiciously Official ownership and will to defend at legal form

National Impact Assessment Programme (NIAP) Way Forward Environmental Protection Agency to play more assertive role Improvement in Legislative Framework Ministry of Environment and CDA in consultation with Planning & Development Division to make efforts for reviving the project

National Impact Assessment Programme (NIAP) Thank you!