Solid Waste Integrated Resources Plan Draft Program Environmental Impact Report Solid Waste Integrated Resources Plan Draft Program Environmental Impact.

Slides:



Advertisements
Similar presentations
Solid Waste Management Coordinating Board Solid Waste Management Coordinating Board Ramsey County Commissioner Victoria Reinhardt SWMCB Chair November.
Advertisements

Taskforce Meeting March 4, Focus on food waste Also other organics such as leaves and yard waste and agricultural wastes Food waste about
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Composting Rule Update Tim Farnan 2013 Minnesota Composting Council Fall Workshop.
Part III Solid Waste Engineering
ZERO WASTE The RENEW LA Goal To reduce, reuse, recycle, or convert the resources (municipal solid waste) now going to landfills so as to achieve an overall.
Zero Waste Operational Plan Policy & Services Committee 3/13/2007.
Draft Program Environmental Impact Report Public Meeting November 30, 2011.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
Presented to SWAC February 16, 2012 City of Cleveland Automated Waste Collection And Curbside Recycling Program.
MULTI-FAMILY SOLID WASTE COLLECTION WHY FOOD SCRAPS IN GARBAGE ARE A PROBLEM ? More than 40% of garbage is food scraps Tipping fee for garbage $109/MT.
Albuquerque Recycling Now & In the Future Mayor Martin J. Chávez __ Ed Adams, P.E., Chief Administrative Officer Irene García, Chief Operations Officer.
Getting to 50% and Beyond: Zero Waste in the RDN.
1 Bringing Curbside Recycling to Delaware A Proposal by: The Recycling Public Advisory Council (RPAC) The Delaware Solid Waste Authority (DSWA) The Department.
June 23, 2007 Alternatives Brainstorming Workshop Brisbane Baylands Specific Plan EIR.
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
Fourth Meeting June 26, 2012 "The Cleaner Greener Lincoln initiative will make the City of Lincoln an active leader in the area of sustainability, building.
70% to Zero What’s it going to take? Ruth C. Abbe HDR Engineering, Inc. October 19 th, 2009.
City of Fort Collins Department of Natural Resources The Role of Solid Waste Reduction Programs in Climate Protection Plans Annual Conference of Colorado.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
2013 Annual Strategic Action Plan Evaluation. Overview Background Role of SAP Implementation Evaluation process Council feedback Enhancement of SAP.
Department of Public Works Zero Waste Strategic Plan October 20, 2014.
Anaerobic Digestion and the Path Towards Zero Waste Paul Relis Senior Vice President CR&R Incorporated July 14,2009.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review April 28, 2014.
Organics Policy Roadmap  Sub-directive 6.1: 50% reduction of organics in waste stream by 2020  Need additional capacity to process 15 million tons per.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
Building the Infrastructure Beyond Recycling GRRN National Zero Waste Action Conference Saturday, July 30, Ruth C. Abbe National Practice Leader.
Santa Monica Sustainable City Plan Purpose The Sustainable City Plan was created to enhance our resources, prevent harm to the natural environment and.
Roadmap to a Sustainable Waste Management Future Waste Diversion Strategies in the Unincorporated Communities of Los Angeles County Throughout the Region.
Santa Monica Sustainable City Plan Purpose The Sustainable City Plan was created to enhance our resources, prevent harm to the natural environment and.
Tom Brady City of Glendale ZERO WASTE BEYOND RECYCLING Rethink, Reduce, Reuse.
Skyline Heights City of Corona Scoping Meeting March 4, 2014.
CA Regional Water Quality Control Board San Diego Region CEQA SCOPING MEETING: TENTATIVE CLEANUP AND ABATMEMENT ORDER (CAO) NO. R January 21,
The Role of Local Government in Improving the Environment Bruce Walker City of Portland Office of Sustainable Development October 20, 2005.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
March 2003 Focused Workshop on the Informal Draft Revised Disposal Reporting System Regulations Session #2: Transfer Station Issues.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
Ministry of Environment Environmental Protection Branch Solid Waste Management Strategy November 2015.
1 Public Meeting to Update the Board on Mandatory Commercial Waste Recycling October 21, 2011.
Smooth Sailing Ahead Partnering With Sustainability and Waste Compliance & Mitigation Fernando Berton, CIWMB.
Discussion of Priority Activities for Next Eighteen Months Action Plans.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
1 The Future of Organics Management in Palo Alto City of Palo Alto Public Works Operations March 8, 2010.
March 8, 2016 Presentation of Item CCW – Solid Waste Management Infrastructure Projects – Final Siting Report.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
Policy Committee Report Virginia Recycling Association Annual Members Meeting Charlottesville, Virginia November 8, VRA Policy Committee Report1.
Southern California Emerging Waste Technologies Forum July 27, 2006 Conversion Technology 101.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
John Davis Mojave Desert and Mountain Recycling Authority.
Buena Park General Plan Update Overview Presentation.
Waste Diversion Planning
Organics Diversion Legislation in New York State
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
Providence Saint John’s Health Center Phase II Project
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Developing a MRF Public-Private Partnership in the City of Dallas
GREENHOUSE GAS EMISSIONS INVENTORY
Solid Waste Franchise Agreements and New State Legislation
Overview What is the CEQA environmental review process?
South San Gabriel Boulevard Pacific Square SG Scoping Meeting Case Planner: Tracy Steinkruger, Planning Manager.
Fifth Standard Solar Project Complex
Tajiguas Resource Recovery Project Doing More with Our Waste
2017 Total Revenues were: $9,165, Revenues by program:
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Solid Waste Integrated Resources Plan Draft Program Environmental Impact Report Solid Waste Integrated Resources Plan Draft Program Environmental Impact Report All of us together can make

Agenda 1.Background 2.Solid Waste Integrated Resources Plan (SWIRP) 3.Draft Program Environmental Impact Report (Draft PEIR) 4.Next Steps

The Solid Waste Integrated Resources Plan (SWIRP) is a long-range master plan that includes Policies, Programs and Facilities to achieve the City’s goal of 90 percent diversion by 2025

SWIRP Schedule 2007 – 2008 Tasks: Public Outreach & Stakeholder Guiding Principles Events: Regional Workshops Citywide Conferences 2009 – 2011 Tasks: Policy, Program & Facility Plan Events: Regional Workshops Citywide Conference Tasks: Environmental Impact Report Events: Public hearings on Draft PEIR 2012 – 2014 Tasks: Financial Plan & Implementation Strategy Events: Regional Workshops Citywide Conference

Stakeholder Involvement SWIRP is a Stakeholder-driven Planning Process 42 regional workshops and 3 citywide conferences during Phase 1 21 regional workshops and 1 citywide conference during Phase key constituent interviews 27 house meetings 75 business meetings

Stakeholder Guiding Principles 1.Education to decrease consumption 2.City leadership as a model for zero waste practices 3.Education to increase recycling 4.City leadership to increase recycling 5.Manufacturer responsibility 6.Consumer responsibility 7.Convenience 8.Incentives 9.New, safe, technology 10.Protect public health and the environment 11.Equity 12.Economic efficiency

SWIRP Master Plan Elements 1.Expansion of existing residential and commercial programs 2.Implementation of new downstream policies and programs 3.Implementation of mandatory participation programs 4.Adoption of upstream policies 5.Development of processing facilities 6.Disposal of remaining residual waste at local or remote landfills

Expansion of Existing Programs To further increase solid waste management and landfill diversion Proposed Sample Programs: Expand recycling for multi-family buildings LAUSD blue-bin recycling program Restaurant food scrap recycling program

Leader Among Big Cities in the U.S. Source for City of Los Angeles: Zero Waste Progress Report, March 2013 Source for other cities: Waste & Recycling News, Municipal Recycling Survey 2011, February 21, 2011

Downstream Policies and Programs Address collection, processing, diversion, and disposal of materials after they are generated Proposed Sample Programs: Recycling ambassadors Bulky item reuse and recycling Food scrap recycling program

Mandatory Participation Programs Motivate all waste generators to separate materials and place them in the appropriate blue bin, green bin, or other appropriate collection bins on a regular basis Proposed Sample Programs: Mandatory recycling separation Mandatory organics separation Increase diversion at construction/demolition facilities

Upstream Policies Minimize the amount of waste prior to the point of generation Proposed Sample Policies: Advocate for legislation to make businesses responsible for their products and packaging Producer responsibility for toxics and difficult to recycle material Plastic bag ban/$0.10 fee on paper bags Blue Dot/Green Dot Program

Processing Facilities Development of future facilities to meet the City’s recycling and solid waste infrastructure needs through 2030 SWIRP does not determine where these facilities would be located, rather, it identifies the potential number of facilities that would be needed

Facility Types Blue and Green Bin Processing Facilities Clean Material Recycling Facilities (MRFs) Composting and/or Anaerobic Digestion Resource Recovery Centers Black Bin Processing Facilities Alternative Technology – Mixed Material Processing Alternative Technology – Advanced Thermal Recycling Alternative Technology – Biological Alternative Technology – Thermal

Clean Materials Recovery Facility (MRFs) Blue Bin Stream Tons per day Revenue per ton$10-30 Acres required5 Phoenix North Transfer Station and Material Recovery Facility Curbside Processing Tonnage, cost, and acreage estimates from SWIRP Facility Plan, October 2013

Composting - Large Scale and Small Scale Green Bin Stream Z-Best Composting Facility, Gilroy Griffith Park Composting Facility Tons per day100-1,000 Cost per ton$40-60 Acres required15-60 Tonnage, cost, and acreage estimates from SWIRP Facility Plan, October 2013

Resource Recovery Center Blue Bin Stream Tons per day1-10 Cost per ton$100 Acres required2 Monterey Regional Waste Management District Tonnage, cost, and acreage estimates from SWIRP Facility Plan, October 2013

Alternative Technology – Mixed Material Processing (Black Bin Stream) Tons per day Cost per ton$40-60 Acres required5-7 Rainbow Disposal, Huntington Beach Mixed Material Processing Tonnage, cost, and acreage estimates from SWIRP Facility Plan, October 2013

Alternative Technology – Advanced Thermal Recycling (Black Bin Stream) Tons per day500-2,000 Cost per ton$ Acres required5-15 Müllverwertung Rugenberger Damm Advanced Thermal Recycling Facility - Hamburg, Germany TREA Breisgau Advanced Thermal Recycling - Freiberg, Germany Tonnage, cost, and acreage estimates from SWIRP Facility Plan, October 2013

Alternative Technology - Biological (Anaerobic Digestion) - Black Bin Stream Tons per day Cost per ton$ Acres required5-10 Dranco, Brecht, Belgium Valorga Process, Barcelona, Spain Tonnage, cost, and acreage estimates from SWIRP Facility Plan, October 2013

Alternative Technology – Thermal (Gasification/Pyrolysis/Plasma Arc) – Black Bin Stream Tons per day500 Cost per ton$ Acres required7 JFE Thermoselect - Chiba, Japan Plasco Conversion System - Ottawa, Canada Tonnage, cost, and acreage estimates from SWIRP Facility Plan, October 2013

Facility Needs Full implementation of the SWIRP policies and programs would require the permitting, construction, and operation of the following additional blue, green, and black bin facilities: One large-scale composting facility or six small- scale composting facilities Three clean material recovery facilities One resource recovery center Five alternative technology facilities

Disposal of Remaining Residual Waste After implementing various policies, programs, and constructing needed facilities to achieve the goals of SWIRP, the residual waste will need to be transported and disposed at landfills Options include: Local Landfill, Truck Haul Remote Landfills, Truck Haul Remote Landfill, Rail Haul

Policy, Program, and Facility Phasing 1 1 Phasing assumed may not reflect actual implementation and/or roll-out of specific policies, programs and/or facilities. 2 Facilities may be implemented by either the public or private sector, or by joint public-private partnerships, and may also include expansions to existing facilities. 3 Statewide mandatory commercial recycling for commercial customers generating four cubic yards or greater of solid waste per week was implemented in July Mandatory recycling and composting for all generators will be implemented locally by 2020.

Environmental Review Process Development of Program Environmental Impact Report (PEIR) pursuant to the California Environmental Quality Act (CEQA) Circulated Notice of Preparation Held Scoping Meeting Prepared Technical Studies and Draft PEIR Circulate Draft PEIR for review (45 days) Prepare response to public comments Produce Final PEIR SWIRP Plan and PEIR considered at City Council hearing

Purpose of Environmental Review Disclose potential impacts of a project Inform decision-makers and the public Identify mitigation measures to reduce impacts

About Program EIRs Prepared for a series of actions that can be characterized as one large project Analysis will be programmatic in nature Additional CEQA analysis required

Potentially Significant, Mitigable Impacts Aesthetics Agricultural Resources Biological Resources Cultural Resources Geology and Soils Hazards and Hazardous Materials Hydrology and Water Quality Land Use and Planning Mineral Resources Noise Population and Housing Public Services and Utilities Recreation Implementation of proposed mitigation measures in the PEIR would reduce the potential significant impacts associated with each environmental issue area to a level that is less than significant.

Potentially Significant, Unmitigable Impacts Air Quality and Greenhouse Gas (GHG) Emissions (Cumulative) Transportation and Traffic Implementation of proposed mitigation measures will reduce the potential impact to these resources to the extent feasible; however, the potential impact will remain significant and unmitigated at this program level of environmental review and pending more detailed site-specific analysis at the project level of environmental review. If the City chooses to approve the SWIRP project, it must adopt a “Statement of Overriding Considerations” pursuant to Sections and 15126(b) of the CEQA Guidelines.

SWIRP Draft PEIR Alternatives Alternative 1 No Project /Landfill Alternative Alternative 2 Expansion of Existing Policies and Programs - No New Policies or Programs Alternative 3 Expansion of Existing Policies and Programs plus New Downstream Policies and Programs Alternative 4 New Policies and Programs plus Implementation of Mandatory Participation Policies and Programs Alternative 5 New Policies and Programs plus Implementation of Upstream Policies and Programs None of the alternatives considered are environmentally superior to the proposed project because they do not meet all the project goals and objectives.

Next Steps Circulate Draft PEIR for 45-day public review −Opportunity for public comment −Comments due December 20 th, 2013 Prepare Final PEIR and Response to Comments −January-February 2014 Council Hearing −Spring 2014 −Opportunity for public comment

Lead Agency Contact Ms. Reina Pereira, P.E. City of Los Angeles Department of Public Works, Bureau of Sanitation Public Works Building (PWB) MS South Broadway, 5 th Floor Los Angeles, CA Phone: (213)