S-1925 Subsection t Stakeholder Meeting November 9, 2012 1:30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ.

Slides:



Advertisements
Similar presentations
Mission: Mission: To protect human health and the environment Primary services: Expertise DEC brings to the ACMP Primary services: Expertise DEC brings.
Advertisements

(a) Amount of funds provided: The amount of funds provided under the terms of the contract shall NOT be less than the Secretary would have provided for.
Waste Generation and Waste Disposal
The Proposed Part 115 Rules and Waste Utilization East and West Michigan Chapters of the Air and Waste Management Association & The Environmental Law Section.
Clean Water Act SAFE 210. History/Amendments Recent major amendments were enacted in 1972, 1977, and – Established the National Pollutant Discharge.
Solar Energy: Hot Today, Cold Tomorrow? 1 David Weinstein, Esquire Robert W. Bucknam, Jr., Esquire Michael Cosack, Independent Energy Consultant April.
Managing Hazardous Solid Waste and Waste Sites
Basic Economic Development Course in Pennsylvania Environmental and Commercial Real Estate Legal Issues Surrounding Economic Development Act 2 Issues Scott.
Part III Solid Waste Engineering
Financial Provisions for long-term Environmental Liability Case study from Norway Tonje Johnsen Senior legal adviser, Section for Legal Affairs.
The current situation in waste management - Slovak Republic Mrs. Slávka Jurkovičová Centre of Waste and Environmental Management SEA Bratislava March 10,
Price Undertakings Under U.S. Antidumping Duty Law Prepared by Import Administration, U.S. Department of Commerce for the June 2 nd Korea Trade Commission’s.
PUBLIC INFORMATION SESSION: Old Fall River Road Landfill Dartmouth, MA Massachusetts Unlined Landfill Closure Policy March 28, 2013 Mark Dakers, Acting.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
Sandy Recovery Improvement Act (SRIA) of 2013 Sandy Recovery Improvement Act (SRIA) of 2013 Public Assistance Program Alternate Procedures Pilot Program.
Annual Conference 2008 Future Challenges for the Waste Management Industry Waste Framework Directive - Impact on the European Waste Management Industry.
The Role of the Licensed Site Remediation Professional (LSRP) Paul Sakson, LSRP Paul D. Sakson Associates, Inc.
SDWA1 The Safe Drinking Water Act (SDWA) The Safe Drinking Water Act (SDWA)
Connecticut Department of Public Works -- Rebecca Cutler – Environmental Analyst.
Office of Smart Growth p. 1 WIND ENERGY SYMPOSIUM THE COLLEGE OF NEW JERSEY Thursday, July 23, 2009 B rownfields R edevelopment I nteragency T eam.
State Financing Programs for Brownfield Redevelopment.
Professor Kenneth C Ross Partner Brodies LLP. Historical background Who pays? Law Society leaflet “Recent clarification of Law Society advice Why is this.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
Pollution Prevention and Minimization. Pollution Prevention Though an obvious concept, this has been one of the most difficult concepts to implement Congress.
Tier II: Module 1C CERCLA 128(a): Tribal Response Program.
* Old gas stations * Old dry cleaners * Oil/chemical spills from past commercial/ industrial operations * Industrial wastes left on property * Old.
Tax Increment Thomas Chapman Raymond James John Repsholdt Ehlers Steven Langert Consolidated High School District 230.
Waste Reduction and Pollution Prevention in Solid Waste and Construction and Maintenance “Putting Waste in its Place” Steve Brachman UW- Extension Solid.
How 1041 Regulations are Impacting Geothermal Development A discussion of how counties are applying 1041 regulations to geothermal development and the.
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Office of Smart Growth p. 1 WIND ENERGY SYMPOSIUM RUTGERS UNIVERSITY Friday, September 25, 2009 B rownfields R edevelopment I nteragency T eam.
Our Creeping Progression to Anaerobic Digestion of Multiple Solid and Sludge Wastes How Regulations, Permitting and Policy are Affecting the Emergence.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Chapter 16 Waste Generation and Waste Disposal.  Refuse collected by municipalities from households, small businesses, and institutions such as schools,
Policy and Legal Framework on Soil Contamination Management in Thailand Workshop on Strengthening Contaminated Soil Monitoring in Vietnam, November.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Proposed Rule for Preventive Controls for Animal Food.
Proposed Rule: 21 CFR 507 Proposed Rule for Preventive Controls for Animal Food 1.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
EU INITIATIVES ON MINING WASTE. Why an initiative on Mining Waste ? Key environmental issues: l Potential environmental risks during disposal m Safety.
Brownfields in Baltic States - Lifelong Educational Project CZ/08/LLP-LdV/TOI/ Legal aspects of brownfield redevelopment in Latvia Edmunds Teirumnieks.
HANNAH WALKER RESOURCE CONSERVATION AND RECOVERY ACT.
Waste Management Amendment Bill B Submission by Business Unity South Africa January 2014.
California Integrated Waste Management Board 1 Committee Items C-D (Board Items 2-3) November 5, 2007 Consideration Of: Item C/2: The Scope Of Work For.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Pete Doorn Special Remediation Branch Superfund Section Division of Waste Management
David K. Paylor Virginia State Board of Health March 17, 2016.
Waste Generation and Waste Disposal Chapter 16. Waste Waste – nonuseful products generated within the system throw-away society Municipal Solid Waste.
Chapter 16 Waste Generation and Waste Disposal.  Refuse = waste (something discarded or worthless)  Refuse collected by municipalities from households,
Department of Environmental Quality Life-of-Site Permitting Required Changes to Solid Waste Management Rules 15A NCAC 13B March 10, 2016.
The City of Rochester New York Environmental Institutional Control System Prepared By: Mark Gregor City of Rochester, New York Division of Environmental.
Task Manager Construction Coordinator Training -- EMS-- Fermilab 95% of Asbestos found is either Amosite or Chryosotile95% of Asbestos found is either.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Town of Bethlehem DG Bethlehem Solar, LLC Zoning Board of Appeals Wednesday, October 1, 2014 David Albrecht, P.E., PV Engineers, D.P.C. Virginia Cook,
Bellwork: 03/15/2011 What is “e-waste” and why is it a problem?
Goals: ◦ Minimize the environmental impacts of construction projects and tasks undertaken at the Lab; ◦ Remain in compliance with environmental rules;
Content 1.The main flowchart and technology 2.Advantage and disadvantages of each technology, way to improve. On-Nuch disposal site Group Member: Lu Li.
Solar PV Implementing Solar Farms on Landfills and Brownfields
Apalachee Regional Planning Council BROWNFIELDS 101 9/28/2017.
Pollution Prevention and Minimization
Solid Waste Handling Standards
Georgia Update Jeff Cown Land Protection Branch
Environmental Science 5e
Overview on the Regulations and Technical Requirements for E-Waste Management in Rwanda. RURA.
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
Presentation transcript:

S-1925 Subsection t Stakeholder Meeting November 9, :30-2:30pm NJDEP Public Hearing Room 1 st Floor, 401 East State Street Trenton, NJ

t.(1) No more than 180 days after the date of enactment of P.L.2012, c.24, the board shall, in consultation with the Department of Environmental Protection and the New Jersey Economic Development Authority, and, after notice and opportunity for public comment and public hearing, complete a proceeding to establish a program to provide SRECs to owners of solar electric power generation facility projects certified by the board, in consultation with the Department of Environmental Protection, as being located on a brownfield, on an area of historic fill or on a properly closed sanitary landfill facility, including those owned or operated by an electric public utility and approved pursuant to section 13 of P.L.2007, c.340 (C.48: ). Projects certified under this subsection shall be considered “connected to the distribution system”, shall not require such designation by the board, and shall not be subject to board review required pursuant to subsections q. and r. of this section.

Definition – Properly Closed Landfill “Properly closed sanitary landfill facility” means a sanitary landfill facility, or a portion of a sanitary landfill facility, for which performance is complete with respect to all activities associated with the design, installation, purchase, or construction of all measures, structures, or equipment required by the NJDEP, pursuant to law, in order to prevent, minimize, or monitor pollution or health hazards resulting from a sanitary landfill facility subsequent to the termination of operations at any portion thereof, including, but not necessarily limited to, the placement of earthen or vegetative cover, the installation of methane gas vents or monitors and leachate monitoring wells or collection systems at the site of any sanitary landfill facility.

Definitions – Brownfield & Historic Fill “Brownfield” means any former or current commercial or industrial site that is currently vacant or underutilized and on which there has been, or there is suspected to have been, a discharge of a contaminant. “Historic Fill” means generally large volumes of non- indigenous material, no matter what date they were emplaced on the site, used to raise the topographic elevation of a site, which were contaminated prior to emplacement and are in no way connected with the operations at the location of emplacement and which include, but are not limited to, construction debris, dredge spoils, incinerator residue, demolition debris, fly ash, and non-hazardous solid waste. “Historic Fill” shall not include any material which is substantially chromate chemical production waste or waste from processing of metal or mineral ores, residues, slags, or tailings.

Basic DEP Requirements for Certification While we don’t know exactly what the certification application process will entail, we do have certain basic requirements that must be met by the applicant. Some of those basic requirements are as follows: – An applicant must demonstrate that the site meets the definition in the bill of the applicable category (properly closed landfill, brownfield or area of historic fill). – For sites applying for certification as a Brownfield or Area of Historic Fill, final certification will only be issued when all remediation activities required under the Spill Compensation and Control Act (commonly referred to as the “Spill Act”) for the site have been successfully completed. – Conditional certification will be granted for sites that have yet to complete final remediation at the time of application. – Immediate certification will be granted for sites where final remediation is already complete at the time of application. – Projects with conditional certification will receive final certification only when the applicant demonstrates that all Spill Act required remediation has been completed.

t. (con’t) Notwithstanding the provisions of section 3 of P.L.1999, c.23 (C.48:3-51) or any other law, rule, regulation, or order to the contrary, for projects certified under this subsection, the board shall establish a financial incentive that is designed to supplement the SRECs generated by the facility in order to cover the additional cost of constructing and operating a solar electric power generation facility on a brownfield, on an area of historic fill or on a properly closed sanitary landfill facility. Incentive Program

Incentive Program – Initial Thoughts DEP must ensure that all remediation required under the Spill Act has been successfully completed prior to the issuance of any incentive funds. The incentive program is intended to “supplement the SRECs generated…in order to cover the additional cost of constructing and operating a solar electric power generation facility on a brownfield, on an area of historic fill or on a properly closed sanitary landfill facility.” DEP, BPU and EDA must determine what those “additional costs” are and what type of costs will be deemed eligible for the incentive. DEP would like to model the incentive on an existing state financial program that reinforces the following core principles: – Ensures that remediation is successfully completed; – Incentive money is paid out only after remediation is completed; and – The amount of the incentive is flexible based on the project’s alignment with environmental review criteria as well as the goals of the Energy Master Plan. We are currently investigating potential funding sources for an incentive program. We are also investigating what kind of time frame is appropriate for implementation of an incentive program given the current SREC market conditions.