Visaginas, 2008 INPP Decommissioning Strategy, Programme, Licensing.

Slides:



Advertisements
Similar presentations
Mike Peckham CAC January 16, 2007 Pickering A Units 2 & 3 Safe Storage Project.
Advertisements

Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
VIEW TO CO2-EMISSIONS IN THE BALTIC STATES THROUGH REORGANIZATION OF ENERGY INFRASTRUCTURE Gintaras DENAFAS Department for Environmental Engineering, Kaunas.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
MODULE “PROJECT MANAGEMENT AND CONTROL” PHYSICAL PROTECTION AND SAFEGUARDS SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Sogin’s mission Post Operation activities of the four Italian NPPs Decommissioning, Spent Fuel Management and sites restoration and /or reutilization Third.
NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that no longer.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
1 Preparing a decommissioning project (part III) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3.
National Radioactive Waste Disposal Institute Bill Presentation to the NCOP Select Committee on Economic and Foreign Affairs October 2008.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
0 Tadas Matulionis Lietuvos Energija AB Strategic planning manager Minsk, December 07, 2007 Environmental Impact Assessment of a New Nuclear Power Plant.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
The embassy of Lithuania in Finland Ambassador A. Jievaltas Lithuanian Energy Policy.
Group Presentation to 27 th - 29 th May 2009 International Nuclear Forum BULGARIAN NUCLEAR ENERGY – NATIONAL, REGIONAL AND WORLD ENERGY SAFETY.
MODULE “PROJECT MANAGEMENT AND CONTROL” QUALITY ASSURANCE SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Key outcomes of IRRS Mission in Finland Kirsi Alm-Lytz.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Nuclear Decommissioning in the UK Presented by Chris Jones.
Aspects of the Management of High Level Waste and Spent Fuel – the Swedish Perspective Johan Anderberg Director, SSM Sweden Johan Anderberg.
Licensing procedures for interim storage of spent fuel in Germany
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
1 BULATOM - SUPPORT TO ENERGY POLICY OF GOVERNMENT OF ARMENIA SUPPORT TO ENERGY POLICY OF GOVERNMENT OF ARMENIA International Nuclear Forum Bulgarian Nuclear.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Lithuanian Electricity Supply Assignment #3 to be announced February 17, due March 8 MS&E 290.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
State Enterprise Radioactive Waste Presented by: Momchil Kazakov – Chief Technologist SD “Decommissioning 1-4 unit”, SERAW 15–17 June 2016 Golden Sands.
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
Decommissioning San Onofre
Analysis of Low Activity Waste Streams and Volumes in Decommissioning NPPs  Lisa Edwards Sr. Program Manager, EPRI LLW Forum April 13-14, 2016.
Massimo Garribba Director, Nuclear Energy, Safety and ITER
Nuclear decommissioning: Turning waste into Wealth
Sustaining Cradle-to-Grave Control of Radioactive Sources (INT-9182) Workshop on implementation of a national cradle-to-grave control system for radioactive.
János Krutzler Hungarian Atomic Energy Authority
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Research Reactor Decommissioning Demonstration Project (R2D2)
Back-end options for a small country with long term nuclear program
Joseph D. Anderson, Chief
Biodegradable waste and its management in the Slovak Republic
REGULATORY VIEW OF FUTURE NUCLEAR WASTE MANAGEMENT
IAEA Safety Guidance on Licensing and Oversight Activities
Possible Transition from Operating to Decommissioning
USNRC IRRS TRAINING Lecture18
Decommissioning Rulemaking
Research and Test Reactor Decommissioning Inspections
National Radioactive Waste Management Agency Bill
Radioactive Waste and Spent Fuel Management in Hungary
Regulatory system in Hungary
Dr. Mitica Dragusin, Project Manager,
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Visaginas, 2008 INPP Decommissioning Strategy, Programme, Licensing

AGENDA INPP Decommissioning Strategy INPP Decommissioning Programme INPP Decommissioning Licensing

INPP Decommissioning Strategy Immediate Dismantling Deferred Dismantling (Safe Enclosure) Entombment

INPP Decommissioning Strategy INPP dismantling strategy selection support document was prepared mid 2002 and was officially issued to the Ministry of Economy on the 16th of October 2002

INPP Decommissioning Strategy The Decision of the Lithuanian Republic Government: “Decommissioning of Unit 1 of the State Enterprise Ignalina NPP shall be planned and implemented in accordance with the Immediate Dismantling Strategy”

INPP Decommissioning Strategy Reduce nuclear risk: –defuel the units and provide safe interim storage for spent fuel Reduce environmental risks: –retrieve, condition and safe interim-store the operational and decommissioning waste

INPP Decommissioning Programme Units Final Shutdown dates: Unit 1 – 31/12/2004 Unit 2 – 31/12/2009 Reactor defueling dates: Unit 1 – 19/01/2010 Unit 2 – 23/11/2011 Pools defueling dates: Unit 1 – 27/02/2014 Unit 2 – 28/12/2015

INPP Decommissioning Programme Reactor dismantling period: Unit 1 – 01/2015 -> 12/2021 Unit 2 – 01/2019 -> 11/2025

INPP Decommissioning Licensing U1 RFS U2 RFS U1 Defuelled U2 Defuelled Licenses U1 operation license U2 operation license U1 Decom License Site Decom License U1 U2 SITE Authorisations for Decontamination & Dismantling projects U1 U2 SITE Landfill FRMF SWMSF

THANK YOU FOR YOUR ATTENTION !