TNMP Load Forecasting Methodology for the ERCOT Steady State Cases

Slides:



Advertisements
Similar presentations
T&D Losses Reflecting Losses in DR within ERCOT August 22, 2012.
Advertisements

1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
NAESB UPDATE MEETING MAY 30, 2008 DSM EE RETAIL GROUP.
Utilizing IED Capability to Reduce Wiring Terrence Smith, GE Digital Energy Multilin Richard Hunt, GE Digital Energy Multilin Jakov Vico, GE Digital Energy.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Distributed Generation (DG)
A Solar Generation Forecasting System for ERCOT Where Would the Data Come From? Jay Zarnikau | President Steve Wiese | Senior Consultant, Energy Efficiency.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
GDS Associates, Inc. ERCOT Reliability Operations Subcommittee June 10, 2010 Tex-La Electric Cooperative of Texas Load Forecast Methodologies.
1 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Overview – Non-coincident Peak Demand
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
1 Overview of Allocating Revenue Requirements Based on Shares of Marginal Costs May, 2012.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
ERCOT Reliability Operations Subcommittee Meeting June 10, 2010 Austin, Texas AEP-Texas: Load Projections/Forecasting and Steady State Base Cases.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Coincident Peak Load Forecasting Methodology Prepared for June 3, 2010 Meeting with Division of Public Utilities.
…While Investing To Achieve Excellence In Reliability 30% Transmission capital investment 03-06; $ millions Distribution capital investment 03-06; $ millions.
Group Meeting – Pepco Holdings, Inc. July 17, 2014.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
Price Responsive Load Next Steps – Data Collection Paul Wattles Karen Farley DSWG and RMS sub team October 16, 2012.
Distributed Generation Benefits and Planning Challenges CREPC/SPSC Resource Planners’ Forum October 3, 2012 Arne Olson.
Power / Energy Management. Background  USA has 6% of worlds population - Uses 33% of energy consumed  In 1946 we used 30*10 15 BTU  In 1980 we used.
Retail Smart Grid Trends Paul Wattles Senior Analyst, Market Design & Development UT Energy Week: “How Smart Grids Enable Consumers” Feb. 18, 2015.
August 01, 2008 Performance Modeling John Meisenbacher, MasterCard Worldwide.
Project 2.3 Demand Response Technologies and Strategies: Energy Management and Metering Kankar Bhattacharya and Claudio Cañizares.
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Rick Allison – Chief Engineer, Enercon Engineering Presented by Lawrence Tangel V.P. Enercon Engineering Chairman of USCHPA NON TRADITIONAL METERING flkjsflkfjl.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
September 24, 2007Paying for Load Growth and New Large Loads APPA September 2007.ppt 1 Paying for Load Growth and New Large Loads David Daer Principal.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Author name Country ID Session X – Block Y – Question Z Barcelona May Geographic information system (GIS) and their role in power utility.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
March 1, 2011 Load Analysis Update Calvin Opheim Manager, Load Forecasting and Analysis.
Voltage Reduction in ERCOT Feasibility Report to ROS Voltage Reduction Task Force.
1 Knowing Your Customers Better Through Load Research Presented By: Lawrence M. Strawn Senior Retail Pricing Coordinator Orlando Utilities Commission September.
1 Electricity Use in California: Past Trends and Present Usage Patterns Rich Brown May 2002.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ERCOT PUBLIC 10/7/ Load Forecasting Process Review Calvin Opheim Generation Adequacy Task Force October 7, 2013.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
South Texas Electric Cooperative Load Forecasting Methodology ROS Meeting, 6/10/10.
Discussion and Preliminary Findings Concerning Voltage Reduction (VR) for Peak Shaving Mark Carpenter Sr. VP T&D Operations December 6, 2012 Presentation.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS GAS LOAD FORECAST.
Demand Forecast Deviations Working Group Presented to: Stakeholder Advisory Committee Presented by: Pat Doran January 24, 2007.
Price Responsive Load / Retail Demand Response 2013 Analysis Report Overview ERCOT Staff & Frontier Associates RMS Meeting August 5, 2014.
Methodology for Demand Forecasts for Bandera Electric Cooperative, Inc. Brian D. Bartos, P.E. Manager, Engineering Presented to ERCOT Reliability & Operations.
Proxy $G and other Loads in SCED 2 Litmus Tests Loads in SCEDv2 Subgroup Dec. 2, 2014.
SUBJECT : POWER DISTRIBUTION AND UTILIZATION (PRESENTATION) INSTRUCTOR:KASHIF MEHMOOD.
Voltage Reduction Task Force Update September 25, 2014 Presentation to ERCOT TAC.
DRMEC Spring 2016 Load Impacts Evaluation Workshop San Francisco, California May 10, SDG&E Summer Saver Load Impact Evaluation.
FORECASTED ENERGY CONSUMPTON AND PEAK DEMAND FOR MARYLAND Summer Reliability Status Conference State of Maryland Public Service Commission May 10, 2004.
Analysis of Load Reductions Associated with 4-CP Transmission Charges in ERCOT Carl L Raish Principal Load Profiling and Modeling Demand Side Working Group.
ERCOT 2001 Marketing & Business Plan Review Meeting
Time of Use Rates: A Practical Option – If Done Well
Reflecting Losses in DR within ERCOT August 22, 2012
Demand Response in the 7th Power Plan
Independent Load Forecast Workshop
Design of Electric Power Systems and Utilities
DEC System Voltage Planning - June 2018
Resource Adequacy Demand Forecast Coincidence Adjustments
MODELING DG IN BASE CASES
MODELING DG IN BASE CASES
Transmission System Update
UM 1856 PGE’s Energy Storage Proposal – Commission Workshop #1
Presentation transcript:

TNMP Load Forecasting Methodology for the ERCOT Steady State Cases Tony Hudson Transmission Planning

TNMP’s load forecasting methodology varies between two categories of load types Industrial load, which typically does not “creep” with any consistency. Commercial and residential load, which typically does creep in a consistent manner.

Load Forecasting for TNMP Industrial Load Load growth/reduction is typically in the form of unpredictable addition/removal of blocks of load. TNMP is in frequent contact with all of the large industrial customers and some of the smaller industrial customers and diligently pursues up-to-date load forecast information. Load for the remainder of the smaller industrial customers usually does not change significantly, which is verified through archived SCADA telemetry or ALDR data obtained from distribution engineers.

Load Forecasting for TNMP Industrial Load (continued) TNMP uses archived SCADA telemetry to maintain baseline MW/MVAR load models and to verify load forecasts the customers have communicated in the past. Peak loads of the individual customers not necessarily coincident with TNMP local area peaks or ERCOT system peaks. Can, and have occurred during various seasons and low ERCOT/TNMP local area loading periods.

Load Forecasting for TNMP Industrial Load (continued) TNMP uses engineering judgement in applying the concepts and data discussed in the previous two slides to produce industrial load models that should be appropriately conservative for the given Data Set A or Data Set B case.

Load Forecasting for TNMP Commercial/Residential Load TNMP has SCADA visibility on over half of its distribution feeders. Transmission Planning collects archived MW/MVAR values on these feeders. Currently utilizing three years of archived data as one of the sources for projecting load. Transmission Planning collects non-coincident load data from distribution engineers for the distribution feeders without SCADA visibility. Distribution engineers also provide estimated growth factors for existing load and information on planned incremental increases in distribution load (blocks of new load).

Load Forecasting for TNMP Commercial/Residential Load (continued) TNMP uses engineering judgement along with the data discussed in the previous slide to: Estimate MW creep factors. Estimate appropriate load power factor adjustments corresponding to real power growth/reduction. Estimate TNMP loads coincident with the ERCOT peak, TNMP local area peaks, TNMP local area off-peaks, and TNMP local area minimum loads.