Materials. Items to cover Monthly phone meetings started (2 so far) –Details on Twiki –Item check list to keep us on track – included at end of slides.

Slides:



Advertisements
Similar presentations
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.
Advertisements

1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
RaDIATE Meeting February /21/14P. Hurh RaDIATE Feb 2014 Meeting 1.
Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
Technical Support Activities in PH-ADO-PO
Radiation Damage in Epoxy Resins Steve Robertson, Simon Canfer.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
PS Module Gluing Tests USCMS Outer Tracker Workshop Ulrich Heintz, Meenakshi Narain, Bill Patterson, Sinan Sagir, Adam Lanman, Eric Spencer, Juan Trenado,
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
BNL & Yale Mechanical Stave Developments BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will Emmet, Tom.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Glue Programme (Tim). Origins Came out of ‘decision’ to migrate from SE4445 to ‘something else’ for module mounting during stave production. General realisation.
Thin ladder development 28/3/2006. Targets Aiming for 0.1 % X 0 Uniformity over full ladder Compatibility with wire and bump bonding Provision for optical.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Materials R. Bates. Contents What we said that we would do What we have done – What is left to do from original list New things to add.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
Pixel Upgrade Carbon Foam and Outer Stave Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, T. Johnson, J. Silber Lawrence Berkelely National.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
Stave production.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Mechanics R&D Ian Wilmut. Talk Scope This talk is to provoke conversation – not to direct activities. The slides should do no more than start the conversation.
Some Comments on the Use of CGL for the Foam-Pipe Interface 1 D. Lynn (BNL), LBNL Mechanical Meeting, Sep 2012 We have been using CGL exclusively in the.
AIDA WP8.4 Qualification of components and common database Simon Canfer Rutherford Appleton Lab, STFC AIDA Annual meeting, DESY,
1 2S Module meeting, 24 September 2012 S tudies on module support inserts Refers to work by Riikka Häsä, Helsinki Institute of Physics, summer student.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Stave Tooling & Plans for Future Stave-building (Tim)
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
Birmingham Status ASIC shear tests (250nm Panel with hybrids cured at room temp and with heated plate, sent to Berlin for shear testing. (Complication:
AMS TIM January, Houston 1 AMS 02 –Thermal Control System Design AMS Thermal Control System (TCS): A Status Report Group Leaders: Drj Sun – AIDC,
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Experiences and Issues with Carbon Foam at BNL & Yale BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Silicon Strip Detector Section of LOI Editors: David Lynn (primary), Nigel Hessey (secondary) Subsections: 1.Silicon Strip Sensors 2.Strip System Front-End.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
QCG Report Francesco Forti University and INFN, Pisa.
Thermal modeling, interfaces, test results LBNL Composites Workshop February 29-March 3, 2016.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
UK ATLAS Stave materials research
WP8 – Improvement and equipment of irradiation beam lines
Materials qualification meeting
Graham Beck, QMUL, WP4 RAL 2 May 2013
Studies of Quad Pixel Module assembly using paper laminate
Material Studies for HL-LHC Strip Stave Design
Communications Share Point Collaborative WS:
Materials R. Bates et al..
Presentation transcript:

Materials

Items to cover Monthly phone meetings started (2 so far) –Details on Twiki –Item check list to keep us on track – included at end of slides Some items from list Report –Yet another delay - sorry BN loaded Hysol –New material ordered from Momentive with bigger grains -> higher conductivity –Order placed 8/3 ? – hopefully have soon Poco-S/S interface under shear –Mechanical test sample proved jig –Real measurements next week – aim for first data for AUW Thermal conductivity of Allcomp Foam –Previous measurements were probably wrong –Material appears isotropic with k=70 W/mK measured in through & in-plane Glue creep measurements –Standards ordered and test spec being written Foam Modules tests –Difficult problem to understand correctly. –Talking with Ryan Page from “low mass” project viz modelling Cleavage test of glued CFRP samples –Need new samples Radiation tests –Big late – working on this for AUW

WP4 (Mechanics) Materials task action list Updated S Canfer/S Jones 8 March 2011Update after 8th March 2011 meeting ItemWhoDates Write up previous resultsRLB (with input from others as requested)First draft by March 25 th Write up 2011 resultsRAL (with input from others)First draft by Dec 1 st Thermal conductivity measurements Thermal conductivity of thin pieces of Allcomp foam in cold to understand if pervious result is repeatable Isaac, Fiona, RLB (Glasgow)End March. Progressing well and expect to be on time. Measurement of poco foam thermal conductivity after a shear force. Look at different glue loadings Isaac, Fiona and RLBMechanical trails done early March. End of March for first measurements Measurement of Allcomp foam thermal conductivity after a shear force. Look at different glue loadings Isaac, Fiona and RLBEnd April (if above works) BN loading of Hysol Can we improve thermal conductivity with particle size mix or different wetting agents RLB to talk with companies Isaac/Fiona to make measurements Send sample to Graham to cross check this. Mid Feb to talk with companies and identify items to purchase. End Feb ordered new BN – done start March. End March to make measurements Waiting on material Degassing of BN loaded glue at RAL and measured at Glasgow – issues with gas content in the glue affecting the conductivity. RAL and GlasgowNeed more BN. 2 nd week of April. CNT loaded HysolRLB and QMU (possibly)End March to find sources of glue/CNT End April to have samples End May to make measurements Foam to pipe studies. Samples from real pipe to foam joints to be measured QMUwaiting on Glasgow numbers from Poco to s/s and CFPR numbers

Studies of Module to Stave glue DC SE4445 thermal conductivityRLB, Isaac Maybe some help from Liverpool with their LineSourceProbeMeasurement Done. Thermal conductivity of Intertronics IRS 2125 GlasgowSlight delay - April DC SE4445 creep test. Need to understand if modules will move with time if glued with DC RAL/Glasgow Need to understand technique RAL (Simon) to advise on technique and perform tests. If tests are portable to Glasgow, the Glasgow able to perform long term testing ASTMs ordered, SHJ has written a technical note on creep testing End April Market survey of other glues to glue silicon detector. RAL –to look into options. Discussed with MGEnd March – on going Testing of other gluesRAL or Glasgow for creep (see DC creep tests item) End April/May Measurements of CTE Measurement of CTE using Strain gauges. Look at foams, glues and foams filled with glue before irradiation Glasgow (and Liverpool?)End of April – not started in Glasgow. Depends on calls on Fiona’s time.

Mechanical tests Poco foam – outstanding issues on modulus data. RAL (Simon/Stephanie)Parked for now, this is a huge area for study CFPR stress/strain relationship under tension. Measure with strain gauges RAL (Simon/Stephanie)Familiar with test methods, now a standard test for RAL as and when required. To be written up for a Monday meeting Bend tests of corrugated samplesRAL/OxfordTo do Cleavage test of glued CFRP samples with DCB. RAL/Tim JonesDone, but supplied samples were too thin. To contact Tim Jones for new samples Thermal expansion tests of foams – Use the DMA with quartz loading system RALQuartz probe away for repair Modulus using DMA to compare technique developed by Ryan page for SiC foam to Poco & Allcomp foams RAL/Ryan PageTo do

Radiation testing Define a list of items to irradiateRLB to coordinate – input from RAL/QMU/Liv/Oxford etc To include CFRP End March – For ATLAS upgrade week. Potential for AIDA collaboration Make itemsAs defined by above (RAL/Liv/Oxford)End April Potential for AIDA collaboration Irradiate itemsPS (Liverpool/Sheffield/QMU)May Potential for AIDA collaboration Thermal test of itemsGlasgow/QMU2-3 months from available. Note still waiting on samples to be shipped for June 2010! Mechanical test of itemsRAL2-3 months from available Studies of different CFPR samples Look at different gluesOxford/RAL? Studies of CFRP prepreg with DSC and FTIR for QA on uncured and cured materials RAL/OxfordLonger term project, Steve Robertson working with Georg V.