Reformed Infrastructure Contributions MAV Presentation Kathy Mitchell, Chair Standard Development Contributions Advisory Committee 23 May 2014.

Slides:



Advertisements
Similar presentations
Section 106 A Strategic Approach Peter Wilkinson Parks Service Manager Bristol Parks.
Advertisements

Hill PDA Newcastle CBD Urban Renewal Strategy. Hill PDA RESILIENCE REGENERATION RENEWAL REVITALISATION.
Funding Infrastructure Provision through value capture : Examining the implementation of the UK Community Infrastructure Levy (CIL) Brian S Peel Postgraduate.
Maribyrnong’s Way: Service Reviews / Continuous Improvement Integrated Facility Planning Mary Ciliak, Senior Coordinator Corporate Planning & Performance.
NDIS: Preparedness Now and Going Forward Griffith University Symposium December 2014.
Community Infrastructure Levy (CIL) Gwyn Jones City Growth and Development Manager Sustainable Development Panel Briefing 27 July 2011.
New Models for Sustainability Directed Care environment Australian Multicultural Community Services approach to financial tracking in a Client Directed.
LEADERSHIP GROUP 5 TH JULY 2011 BUDGET 2012/13 – 2014/15.
Reformed commercial and industrial zones for Victoria Presentation by Paul Buxton, Statutory Systems, Department of Planning and Community Development.
Development Contribution Reform: Implementing Standard Levies Municipal Association of Victoria 23 May 2014 Christine Wyatt De Christine Wyatt Deputy Secretary,
A stronger economy, cleaner environment and liveable communities Une économie plus forte, un environnement plus propre, des collectivités habitables Over.
January 20, 2015 City Council Meeting. Purpose Council direction on moving forward with: Housing linkage fee in short term based on 2009 Study and existing.
What IHE Delivers 1 Business models - sustainability IHE Australia Worhshop – July 2011 Peter MacIsaac & Paul Clarke.
Presented by: ECONorthwest December 15, Agenda Introductions (10 minutes) Overview of the project (30 minutes) Presentation by ECONorthwest Role.
AUSTRALIAN LOCAL GOVERNMENT ASSOCIATION. Local Government and Federal Government – the importance of the direct relationship, now and into the future.
Responding to a changing climate Tasmanian Climate Change Office Department of Premier and Cabinet.
Facilities Management Category Management Plan Synopsis Version 1.1 (March 2015)
REF Information Session August Research Excellence Framework (REF)
Presentation by Wendy Launder General Manager CRC and Small Business Programs.
LOCAL BUFFER SUPPORT PROGRAM 1 May 2014 MAV. Liveability, growth and waste As Melbourne continues to grow, we need secure the right mix of resource recovery.
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
1 A Framework for Comprehensive Planning City of Sunset Valley.
Investment in VET for a productive and inclusive society Peter Noonan Centre for Economics of Education and Training Presentation originally prepared for.
David Brock Cambridge Futures 2 Funding and Delivery Section 106, PFI, and powers.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
Full Costing An introduction and lessons learnt from the UK and Finland Pierre Espinasse.
Environment Protection (Waste to Resources) Policy TIANA NAIRN November 08.
MKUKUTA/PER Consultations 2007 DPG session MKUKUTA/PEFAR 22 May.
Transportation Industries and Jobs. State Economic Output in Transportation Sectors,
1  The IPM model projects increases in electricity prices as a result of the RGGI policy scenarios which, by themselves, would increase the household.
Resource Allocation & School Planning Councils in Your District Presenter: Sterling Olson.
CORNERSTONES TO MANAGING INFORMATION TECHNOLOGY. WHY SERVICE LEVEL AGREEMENTS? Customer Perceptions---Fantasy? Customer Expectations---Reality Customer.
Section 106 Overview Tony Melia – Section 106 Officer.
‘FROM THE TOP’ VPELA Presentation Kathy Mitchell, Chief Panel Member 11 June 2014.
About the Reformed Residential Zones Geoff Underwood Chairman Reformed Zones Ministerial Advisory Committee.
Can Offsets Deliver a Conservation Gain for Koalas in Queensland? Malcolm Eadie Director of Netgain Environments.
1 7th Framework Programme “Ideas” 2   Basic research has an important impact on economic performance   Europe is not making the most of its research.
EU COMMON STRATEGIC FRAMEWORK FUNDS IN ENGLAND INITIAL PROPOSALS FROM HMG 21 NOVEMBER 2012.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
A Commissioning Framework for Mental Health & Addiction Consultation workshop October 2015.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
Reform of Land Development Fee in Serbia Marko Paunović Center for Liberal-Democratic Studies.
Standard Development Contributions Advisory Committee VPELA - 14 March 2013 Kathy Mitchell, Chair.
PALERANG COUNCIL Proposed Special Rate Variation 2016/ /21 Public Exhibition : Draft Long Term Financial Plan and Draft Delivery Program (as amended)
Transportation Industries and Jobs. State Economic Output in Transportation Sectors,
UDIA HOT TOPICS – STRUCTURE PLANNING REFORM & LIVEABLE NEIGHBOURHOODS REVIEW 26 SEPTEMBER 2012 PAUL ELLENBROEK PROJECT MANAGER – LIVEABLE NEIGHBOURHOODS.
CIL : The Spending. Background and Context The levy cannot be expected to pay for all of the infrastructure required: – 10-30% – Consider CIL as just.
CIL – a local authority perspective Jeni Jackson, Woking BC.
CIL vs S106 The Regulation 123 list. The levy cannot be expected to pay for all of the infrastructure required: – 10-30% – Consider CIL as just one part.
TO CIL OR NOT TO CIL? Alison Fairhurst DCLG January 2016.
S106 Agreements Development Control User Panel. s106 agreements What are s106 agreements? How are they managed? The future:Community Infrastructure Levy.
School Funding Reform Schools Forum 10 October 2012.
Community Infrastructure Levy The fundamentals. Response to questions.
Community Infrastructure Levy S106 vs CIL July 2014.
Demystifying viability The local authority experience Dominick Mennie, Deputy Team Leader (Plan Making)
Transportation Industries and Jobs
AGENDA The current focus on housing Do we need older people’s housing? The role of planning? National Level Local Level Opportunities to influence Planning.
Fair Go Rates System Dr Ron Ben-David Chairperson
2016 IPWEAvic Public Works Conference
Joan Angel Deputy Registrar, Student Administration HOSA 2018
Fair Go Rates System Dr Ron Ben-David Chairperson
Accountability Issues in Proposal Writing
Conducting Needs Assessments for UF/IFAS Extension
Transportation Industries and Jobs
Transportation Industries and Jobs
Transportation Industries and Jobs
Transportation Industries and Jobs
Transportation Industries and Jobs
Transportation Industries and Jobs
Synergies between NDCs & SDGs; Integration into National Planning
Presentation transcript:

Reformed Infrastructure Contributions MAV Presentation Kathy Mitchell, Chair Standard Development Contributions Advisory Committee 23 May 2014

Development Contributions 2 Complex, time consuming, difficult to implement, unpopular, inconsistent, contested Vary markedly in Growth Areas, lack of consistency in application, lengthy debates and hearings to implement Councils – want developers to pay more; Developers - want to pay less In non Growth Areas, no simple and effective way to capture contributions for infrastructure required to service new development catering for growth

Development Contributions Part 3B of the Planning and Environment Act 1987 provides for the preparation of DCPs Key principle – now and post review: Contribution not full cost recovery 3

Advisory Committee Members: Kathy Mitchell (Chair), Trevor McCullough, Rodger Eade, Chris De Silva and Bryce Moore Terms of Reference: Advise the Minister on a system of standard levies to apply to all development scenarios Implementation and operation of a new system Setting and implementing standard levies for development settings and for different categories of Infrastructure Fix the system 4

Key Challenges and Issues Simplicity and certainty Ease of introduction and adaptation Flexibility for users Transparency Demonstrating Need, Equity, Nexus and Accountability Standards and adequate funding for ‘starter’ infrastructure 5

Consultation and Reporting Process 6 Stage 1 Stakeholder meetings late 2012 with over 35 meetings with 100 participants 58 written submissions Report 1 Setting the Framework (submitted to the Minister 17 December 2012) Released by the Minister on 26 January 2013 Stage 2 69 written submissions The Committee met with over 800 people from over 100 organisations Report 2 Setting the Levies submitted to the Minister 31 May 2013 Stage 2 released by the Minister on 1 May 2013 and the new reform agenda announced

Urban Infill and Renewal Areas Typically the contribution to public infrastructure for a development in an urban infill or renewal area is $0 Negotiated s173 agreements for some developments A small number of DCPs outside growth areas, e.g. Darebin $130 to $3,600 per dwelling Manningham (Doncaster Hill) $2,139 per dwelling 7

Interstate Comparisons 8 StateInfill AreasGrowth Areas/Greenfield including State Infrastructure Non-Residential VIC$0 (generally)Approx $15,000/ lot plus GAIC $5,000/ lot Section 173 only (site specific) QLD$20,000/ lot up to 2 bedrooms $28,000 for 3 bedrooms $30-40,000/ lot and upHigh per m 2 rates for different uses. Triggered by change of use. NSW1% of development cost OR Capped at $20,000/ lot (plus State charges) “Capped” at $30,000/lot but typically between $50-60,000/ lot including on average $10,000 State levy Generally 1% of project cost.

How was the Growth Area Levy Determined? 9 Average DCP cost (including open space and $900 per dwelling Community Infrastructure Levy) for Growth Areas: 2008 $194,000 per net developable Ha 2009$215,000 per net developable Ha 2010 $218,000 per net developable Ha 2012$245,000 per net developable Ha Scope creep in boom market saw ‘blow out’ in DCP costs Typically spent on: Community services and open space30% Roads and traffic management 30% Public land purchase40%

How was the Growth Area Levy Determined? 10 Showed consistency across regions Showed ‘normalising’ of total costs over the period Analysed variations across infrastructure categories: Land costs higher in the south-east, although average land values had normalised in 2012 (post GFC) Transport infrastructure costs higher in the west ‘scope creep’ in community and recreation costs over the years Open space levies have been inconsistently applied

How was the Growth Area Levy Determined? 11 Identified the need to: Achieve consistency in the application of open space costs Limit the scope of community and recreation facilities Provide some flexibility in the allocation of levies between land and transport infrastructure Not leave Councils short Not unreasonably impact on development viability

How was the Growth Area Levy Determined? 12 Looked at: A variable land levy A number of options for applying Supplementary Levies Used averages over time period Verified costs through economic peer review Strategic Development Areas calculated as % of Growth Area levy

Allowable Items Provides for a specified lists for each infrastructure category rather than a broad description of ‘basic and essential’ items No State infrastructure where GAIC applies No public open space included in Urban Areas or Strategic Development Areas (Clause or Subdivision Act to continue to apply) Budget for spending on the basket of goods 13

Commercial and Industrial Levy Two categories selected from complex equivalence tables Based on demand these uses generate for transport infrastructure, with minor allowance for community and recreation Quantum informed by recent DCPs Levies set to minimise possible distortion with non levied areas Set at low level to encourage job creating uses Used per square metre as base, not cost of development 14

Thank You 15