Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.

Slides:



Advertisements
Similar presentations
M. J. Haigh Well Design Differentiators CO 2 Sequestration in Depleted Reservoirs SPE Presented at Offshore Europe 2009 Conference.
Advertisements

COMPANY MAINTENANCE MANUAL
Ageing Plants.
Final Competence Assessment Assessment Documents Assessment strategy (SummitSkills) Assessment methodology (SQA) Assessment guidelines (SQA)
1 Copyright Electric Power Research Institute 2008 Steam Turbine-Generator Guidelines Quick Start VolumeContent 1General Practices Condition assessment,
ACTIVE LEARNING PROCESS
Preventing Equipment Failures
Power Plant Engineering
Mr.B.L.Prabhu, Safety Officer Boiler Safety Measures.
FOCUS POINTS FOR SITES TO IMPLEMENT TOWARDS BOILER TUBE FAILURES PREVENTION (Actionable points for site based on failure analysis ) SCOPE: BOILER PRESSURE.
CASE STUDY ON BOILER ACCIDENT
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Vishal Lagad - Sr. Corrosion Engineer Asset Integrity
Valmont Servies Group NCSC Omaha Conference October 8, 2013 BABY BOOMER POLES AILMENTS AND FIXES CARL KEMPKES, NACE III CIP DIRECTOR OF OPERATIONS MATCO.
Improving Safety – Reducing Hydrocarbon Releases Pipework Vibration / Fatigue Awareness Stuart McGregorJeremie Neillo Senior Project EngineerBusiness Development.
Materials and Joining March 2005 R&D Forum David Horsley TransCanada Pipelines Limited.
Budget Shortfall Options Ian Wyatt - Atkins JIP on Bursting Disks for Shell & Tube Exchangers – 2 nd Stakeholders Meeting.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
Developing an Energy Management Plan for the Whole School United Learning – 18 th February 2015 Malcolm Hanna, Technical Director Improving the use of.
1 Failure modes, effects and rates and remote maintenance/downtime Introduction –Failure is defined as the ending of the ability of a design element to.
Gas Transmission Pipelines
Reliability Centered Maintenance From a Data Center Perspective March 2013.
 RSM TM is an important component in the processes of  DESIGN,  MANUFACTURING,  MAINTENANCE and  REPAIR of PARTS and WELDED ELEMENTS RESIDUAL STRESS.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
PIPELINE ENGINEERING COURSES DISTANCE LEARNING 12 WEEKS DR. ESAM AM AL-MATOUQ.
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade.
Pressure Vessels.
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
U D T Workshop on the Pressure Equipment Directive, Warsaw June 2004 INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC SYSTEM OF ENSURING.
Remote Visual Inspection
2 © 2005 OSIsoft, Inc. – Company Confidential Paul Ireland Manager – Information Engineering, RWE npower Technology Services P I.
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
REPAIRS AND REHABILITATION OF STRUCTURES UNIT – II
Material failure analysis
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
1 Excellence in Product Development. 10 th July BIFM Application.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Life cycle services for automation products
National Legislation on in- service inspections and the PED.
I. M. DMYTRAKH and V. V. PANASYUK Karpenko Physico-Mechanical Institute, National Academy of Sciences of Ukraine 5 Naukova Street, Lviv, 79601, UKRAINE.
Workshop on the Implementation of the Pressure Equipment Directive In-Service Inspection Overview of UK Legislation Martin Yates Safety Assessment Federation.
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
Nuclear Research Institute Rez plc. Division of Integrity and Technical Engineering BULATOM June LESSONS LEARNED FROM AGING MANAGEMENT ACTIVITIES.
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
DESIGN AND IN-SERVICE INSPECTIONS Guy BAYLAC Technical Advisor to EPERC TAIEX Workshop, Working Group 4 Bratislava – 12 April 2005.
JLAB Pressure Systems Considerations Ed Daly. Outline Introduction Federal Law - 10CFR851 Compliance JLAB Pressure Systems Program –Complies with 10CFR851,
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Cracking in Fire-tube Boilers.
Mechanical Engineering - Design, Drafting & 3D Modeling Mechanical 3D Modelling | Voice: What is.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
1 RIGHT SOLUTIONS RIGHT PARTNER Industrial. 2 RIGHT SOLUTIONS RIGHT PARTNER Testing & Inspection Asset Care Industrial.
New Design Concepts for Aeronautical Applications by Friction Stir Welding Sergio M. O. Tavares Engineering Design and Advanced Manufacturing focus area.
REACTOR PRESSURE VESSEL
REFINARY & PETROCHEMICAL
CASE STUDY ON BOILER ACCIDENT
Turbo Power Life Prediction- Overview
THE PROCESS OF CRACK INITIATION AND ITS PROPAGATION
Ignacio Aviles Santillana
Risk Assessment should include:
PRESENTATION BY TRILLIAN PROPOSED EXECUTION PLAN FOR ESKOM’S POWER PLANT IN SOUTH AFRICA DATE:
Traceability of Gas Pipeline Materials Research & Materials Manager
Diversity analysis for advanced reactor design
SR 1 and 2 Hay Point Fatigue Damage Structural Risk
INTERFACES BETWEEN NATIONAL LEGISLATION AND DIRECTIVE 97/23/EC
Workshop on the Implementation of the Pressure Equipment Directive In-Service Inspection Overview of UK Legislation Martin Yates Safety Assessment Federation.
Gas Transmission Pipelines
Presentation transcript:

Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October 2013

This presentation will incorporate: Brief company overview Summary of the key integrity issues on steam generating plant, arising from the following: Implementation of a flexible operating regime Life extension of ageing assets Overview of the Through Life Asset Management services offered by DB to allow operators to manage component integrity and availability Objective of Presentation

2 Doosan – Heritage

Essentially base loading – around 650 starts in 26 years Flexible operation – 2250 starts in following 15 years Illustration – Operational Changes on an Ageing Unit

4 Asset Evolution Reliability & Availability Performance & Efficiency Condition Monitoring Lifetime Rupture Integrity Management Inspection Strategy & Planning Strategic Spare Parts Regulations Compliance Operational Flexibility Performance Improvement Technological Advancements Modular Upgrade & Retrofit Plant Degradation Plant Enhancements Through Life Asset Life Management – Why?

Asset ageing is not about how old your plant is; it’s about what you know about it’s condition and how that’s changing over time. −Confidence in initial design and fabrication −Knowledge of through life Plant risk factors −Appreciation and quantification of failure consequences  These are critical to understanding ageing and provision of effective asset life management. Through Life Asset Life Management – Integrity Risk Factors

6 Through Life Asset Life Management – Critical Factors Asset Performance Asset Compliance & Safety Asset Reliability Asset Availability Integrity Management

Two-Shifting of Steam Generating Plant Two-shifting of steam generating plant increases the risk of damage to components from a number of mechanisms: Greater and more frequent thermal stress cycles Increase in frequency of pressure stress cycles Increased potential for thermal quenching of components

Pertinent Damage Mechanisms Thermal Fatigue  Gradual deterioration and eventual cracking of material  Caused by alternate heating and cooling during which thermal expansion is constrained  Generally associated with stress raisers and most likely to occur at weld connections or attachments Corrosion Fatigue  Occurs on the waterside surface of tubes  The results of a combination of cyclic loading and offline corrosion  Corrosive environment will accentuate the rate of crack growth Creep  Time/temperature/stress dependant mechanism  Not specifically a flexibility-related concern, although creep / fatigue interaction must be considered

Through Life Asset Life Management Tools Provided by Doosan Babcock Plant Design & Construction Operational Data Analysis Metallurgical & Structural Integrity Design & Constructability Review Risk Assessment & Profiling Water Chemistry, FAC & Inspection Plant Upgrade, Retrofit & Replacement Engineering Strategy for Life Extension

Plant Risk Assessment (Technical Review)

Outage Inspections Inspection techniques including:  Boiler condition assessment  Metallurgical condition assessment of high temperature components  Conventional and specialist NDT techniques  Remote Visual Inspection (RVI)  Pipework support survey in both hot & cold condition  Interpretation of inspection results and sentencing of defects  Capability to manage multi-discipline inspection teams Expert in specifying and deploying relevant inspection techniques

Living with Defects / Fitness for Service  The discovery of defects does not necessarily mean repair works are necessary  DB have extensive experience in managing the integrity of flawed components, with a programme of ‘Inspection Based Assessment’ defect monitoring in place on steam chests and headers at a major UK coal fired station  Thorough understanding of the component’s design and the nature and behaviour of defects is necessary  Images below shows the application of advanced stress analysis techniques and Fracture Mechanics to justify returning a component to service with known defects

Component Modification / Repair Bypass / Balance Connections Star cracking in valve body at penetration Through thickness cracks inside bypass pipework

Component Modification / Repair Valve body following removal of bypass pipework Bore opened out to remove cracking

Component Modification / Repair

Retrofit – Replacement of End-of-Life Components  DB managed the replacement of this complex component, with the following techniques used in the planning of the works: –Virtual Survey Engineering / Datum Measurements –Pipe Stress Analysis / Restraint Design –Specification of machining requirements for replacement chest –Production of NDT and heat treatment procedures following installation

Retrofit – Replacement of End-of-Life Components  Loop pipe outlet weld – target root gap achieved following machining. Benchmark NDT / balanced heat treatment carried out following welding.  Replacement chest machined in accordance with DB instructions and shipped to site.

New Build Considerations Fatigue cracking at tube stub connections is commonplace, due to differential thermal expansion during start-up Exacerbated by weld profile, and mainly observed in tube/weld toe Can be remedied by local repair, however poor access particularly within HRSGs – trepanning header often necessary Joint configuration on new-build optimised for smooth profile (good option for flexibly operated plant)

19 Thank You - Any Questions?