1Furmanite Confidential - 1/9/04 Pressure Systems Integrity Management.

Slides:



Advertisements
Similar presentations
Why Plan Ahead? Limit Susceptibility Limit Risk Contain Material Loss Contain Human Impact Limit Down-Time Ensure Longevity FEMA Fact: 80% of businesses.
Advertisements

Gas Plant Operation and Maintenance Overview Presented by Geoff Vail.
CHAPTER 45 Engine Lubrication.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
1Furmanite Confidential - 1/9/04. 2 Saving You Money Through Maximising Your Plants Availability.
Office: (903) Web: Advanced Technology for the Heat Treatment Industry.
Introducing…. Zafety Lug Lock ® Wheel Nut Security System.
Tire Servicing Program. Agenda WorkSafeBC Requirements Definitions Responsibilities General safety.
Improving Safety – Reducing Hydrocarbon Releases Pipework Vibration / Fatigue Awareness Stuart McGregorJeremie Neillo Senior Project EngineerBusiness Development.
21 April 2010 Growing and packing citrus to meet export market requirements.
WHY USE A FLUID SEALING SPECIALIST? FOR SAFETY & RELIABILITY BECAUSE…….
1 James M c Intyre. 2 Outline Overview  TAGM Milestones  Documents & Travelers  Personnel Training  Special Training & Hazards Construction Plan 
Gas Transmission Pipelines
for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack
Presented by Environmental Health and Safety
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
WHS Management Plans.
© 2010 Fluor. All Rights Reserved. 17 Terawatts to 30 Terawatts – a building perspective February 2, 2015.
Capless Induction Sealing
DELIVERING SAFE & RELIABLE OPERATION
7A1 Friction & Galling Test
The Airtex Educational Partnership (AEP) was started several years ago by Airtex Automotive Division as a way to merge corporate automotive expertise with.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
ABC Chemical Complex1 Maintenance of DOT Regulated Valves ABC Company ABC Chemical Complex Engineering Specification.
한국매스타이트㈜ 한국매스타이트㈜ WHAT IS MASTITE NON-ASBESTOS ?
B & M Industrial Services “The Leader in Industrial Contract Services”
Safety & Project Management by NABEEH JUM’AH. Eye on Safety  Proactive  Reactive.
ISO OPERATIONAL CONTROL
VULCAN ENGINEERING LIMITED VISIT OUR TELEPHONE : +44 (0) FAX : +44 (0)
FAILURE ANALYSIS Sources of failure - - Sources of failure - - Material Related Failures. Deficiency in Design. Service Related Failures. Environmental.
Presentation on Preventive Maintenance
PRE s ENT TO TRANSFER CASE WORK…….. ALL TO THE GEAR BOX……. -MAINTAINANCE….. -CHANGING OIL GEAR BOX…. -CHECKING OIL GEAR BOX……
HOUSTON, TEXAS1 Maintenance of DOT Regulated Valves ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
Division of Risk Management State of Florida Loss Prevention Program.
Nearmiss Presentation
Guess The Profession Use the clues to try and guess which profession is on each slide. Can you guess all 5?
Modern Maintenance. Management
NEW TANK REPAIR PRODUCTS INSPECTION COATING Global AST Solutions Provider Since Personal Safety Awareness Initiative.
OUTAGE MANAGEMENT. OUTAGE APPROACH/PHILOSOPHY A) Time based / machine operating hours based concept related to OEM recommendations - More expensive than.
Hydraulic Torque Wrench, RTJ Machining, Bolt Tensioners, Boltite.com.
for rigging up smaller ID BOPs to a Drilling or Workover BOP Stack
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Under Ground Hard Rock Mining T&M Equipment Expert Model for Winch Systems.
Temperature Test Allows monitoring of temperature changes.
Introducing…. Zafety Lug Lock® Wheel Nut Security System
MAINTENANCE ENGINEERING
Automotive Engines Theory and Servicing
Maintenance of DOT Regulated Valves
Fans & Heaters technical seminar
Risk management - HIRAC awareness presentation
Fundamentals of PROCESS PLANT PIPING DESIGN
Piping.
CHAPTER 45 Engine Lubrication.
INDUSTRIAL FIREPROOFING Evaluation Services
Emergency Electrical Power Supply for Buildings
Welcome! Drafting 2323: Pipe Drafting
Flanges.
HAZOP Guidewords Base Set
Safety Alert Screwed Fittings 04/95 Background
LOCKOUT/TAGOUT By: Kory Hildebrand.
Engine Sealing and Reassembly
Automotive Technology Principles, Diagnosis, and Service
Gas Transmission Pipelines
Maintenance of DOT Regulated Valves
Fluid Power System Maintenance and Troubleshooting
Presentation transcript:

1Furmanite Confidential - 1/9/04 Pressure Systems Integrity Management

2Furmanite Confidential - 1/9/04 Pressure Systems Integrity Management Objective - To provide a total flange service Result - Zero Leaks

3Furmanite Confidential - 1/9/04 Fugitive Emissions Environmental  Legislation PSI Management

4Furmanite Confidential - 1/9/04 Fugitive Emissions PSI Management Environmental  Legislation Safety  Occupational Health & Safety

5Furmanite Confidential - 1/9/04 Fugitive Emissions PSI Management Environmental  Legislation Safety  Occupational Health & Safety Commercial  Efficiency

6Furmanite Confidential - 1/9/04 Fugitive Emissions Causes  Damaged sealing faces  Warped sealing faces  Gasket selection  Poor assembly procedures  Incorrect bolt load  Uneven bolt load  Flange rotation PSI Management

7Furmanite Confidential - 1/9/04 Fugitive Emissions Costs  Loss of product  Process inefficiency  Cost of leak repair  Environmental fines  Image PSI Management

8Furmanite Confidential - 1/9/04 PSI Management Sequence Planning  Consultation  Analysis  Site inspection  Specifications  Resources  Documentation PSI Management

9Furmanite Confidential - 1/9/04 PSI Management Sequence Planning Site  Inspection  Supervision  Manpower  Equipment  Documentation PSI Management

10Furmanite Confidential - 1/9/04 PSI Management Sequence PSI Management Planning Site Post Job  MDR  Documentation

11Furmanite Confidential - 1/9/04 Planning PSI Management Consultation Identification of ‘critical’ plant:  History  Product contained  Temperature / pressure  Strategic (risk assessment)  Physical size/access

12Furmanite Confidential - 1/9/04 Planning Analysis – Overview  When a bolted gasketed flange joint is assembled the gasket seal is subjected to a compressive force – “W”  When a system is pressurized the initial compressive force is relieved by ‘H’  To maintain seal integrity there must be a residual compressive force on the gasket when the system is in service PSI Management

13Furmanite Confidential - 1/9/04 Planning FlangesGasketBolts Type Material Strength Corrosion Resistance Surface Finish Surface Condition Surface Flatness Chemical Compatibility Creep Resistance Elasticity Cost Handling Strength Temperature Resistance Strength Temp Relaxation Compatibility to Flange Cost Corrosion Resistance PSI Management Analysis Maintenance involves opening/closing bolted gasketed joints. Appreciation of the ‘system’ is necessary. The system fails, not the gasket when there is a leak.

14Furmanite Confidential - 1/9/04 Planning PSI Management Site Inspection – Accuracy of Bolting Systems   Flogging Spanner?   Impact Wrench±50%   Controlled Torque Wrench±30%   Hydraulic Bolt Tensioner±15%   Micrometer±10%   Ultrasonic Monitoring±2%   Strain Gauging±1%

15Furmanite Confidential - 1/9/04 Planning PSI Management Site Inspection – Torque to Tension Time

16Furmanite Confidential - 1/9/04 Planning PSI Management Specification   Flange Surface Finish   Flange Flatness   Gasket Selection   Bolt Material

17Furmanite Confidential - 1/9/04 Planning PSI Management Resources   Right skills for the job   Right equipment for the job   Work scheduled

18Furmanite Confidential - 1/9/04 Planning PSI Management Documentation   Generic Engineering Procedures   Specific Engineering Procedures   DS-155   DS-156   DS-158   Colour Coded Tagging

19Furmanite Confidential - 1/9/04 Site PSI Management Typical Site Workscope   Tagging   Unbolting / removing flanges   Inspection   Clocking   On-site machining   Gasket installation & flange assembly   Controlled bolting   Documentation

20Furmanite Confidential - 1/9/04 Post Job MDR & Documentation PSI Management

21Furmanite Confidential - 1/9/04 Training Flange inspection Flange assembly Bolting procedures PSI Management For non-critical plant

22Furmanite Confidential - 1/9/04 PSI Management Only when all the components of the bolted gasketed flanged joint are working together will an effective long term seal be achieved:  Selection of correct components for the application  Careful inspection, preparation, installation and assembly  Correct bolt tightening KEEP RECORDS PSI Management

23Furmanite Confidential - 1/9/04 PSI Management Santos Mobil TXU BP WMC Caltex ABF WMC PSI Management PSI Management Past Performance

24Furmanite Confidential - 1/9/04 Past Performance Santos Moomba Gas Plant  LRP Shutdown  Furmanite - Turn-Key Contract  30 Furmanite Technicians  40 Sub-Contractor  Full scope of JIMS + rigging, scaffolding, welding, cleaning, insulation, blasting & painting  150 Critical Flanges serviced  Workscope completed 11 hours ahead of schedule  Subsequently Furmanite involved on every major shutdown PSI Management

25Furmanite Confidential - 1/9/04 Past Performance BP QLD Clean Fuel Project 2000  Construction - HGU & HCU Plant  Furmanite -  Bolt Load / Flange Stress Calc’s  Equipment  Supervision (Hands on)  Documentation  97 Critical Flanges  2 crews - 12 Large Flanges in 1 x Day  Full Pressure Test - Zero Leaks PSI Management

26Furmanite Confidential - 1/9/04 Past Performance WMC Phosphate Hill  First Major Shut Down  Furmanite - Control of 80 Critical Flanges on Ammonia Plant  Engineer, Supervisor and 5 Technicians-  Zero Leaks at Start-Up ( Client signed off Furmanite 4 weeks after start up)  Ammonia Plant Shut Down finished on schedule PSI Management

27Furmanite Confidential - 1/9/04 Past Performance ABF 9th Critical Joint Shut Down  Approx 4600 man hours  20 Furmanite Personnel (1 Project Mngr, 3 Sup’s & 16 Tech’s )  17 Day shutdown  58 Critical Joints – assembled and bolted (18 not part of the original scope)  Bolting from 7/8” to 5-1/4” dia.  10 RTJ Flange faces machined or lapped and polished  31 Lens Rings Machined  20 x 2-1/4” seized studs - drilled, threads picked then re-tapped  3 x 4-3/4” seized studs - drilled, threads picked then re-tapped  All work handed back on or ahead of schedule. PSI Management

28Furmanite Confidential - 1/9/04 Past Performance ABF 9 th Critical Joint Shut Down PSI Management

29Furmanite Confidential - 1/9/04 Past Performance WMC Phosphate Hill  Major Shut Down – 2003  Furmanite assisted UKG & WMC with development of shutdown work packs from Jan – July 2003  Furmanite - Control of 970 Plant Flanges, including 150 critical on Ammonia Plant  20 personnel, including Project Manager, Engineer, Safety Representative all with the ability to be hands on  Over 5,500 shutdown man-hours  Zero Injuries throughout works.  Zero Leaks at Start-Up.  Plant Shut Down finished on schedule PSI Management

30Furmanite Confidential - 1/9/04 Plant Benefits Safety & Efficiency  Right first time  Re-work significantly reduced  Reduced shutdown duration  Down time reduced All above = Plant owner’s confidence increased All above = Improved Safety performance PSI Management

31Furmanite Confidential - 1/9/04 Plant Benefits Efficiency Example  Critical flanges – Syngas line  Flange failure – 7 days downtime* at $30,000/hr = $5million  7 days = 3 days cool down + 1 day rectification + 3 days start up  JIMS – 100% success on syngas flanges to date. PSI Management

32Furmanite Confidential - 1/9/04 PSI Management Cost of leaks & un-planned re-work is far greater than cost of avoiding it. PSI Management

33Furmanite Confidential - 1/9/04 Worldwide Furmanite America Inc. - Corporate Headquarters 2435 North Central Expressway Suite 700 Richardson TEXAS USA Tel: Furmanite International Ltd - UK Furman House Shap Road Kendal Cumbria LA9 6RU Tel: