N A T I O N A L N U C L E A R S E C U R I T Y A D M I N I S T R A T I O N O F F I C E O F D E F E N S E P R O G R A M S Fusion Ignition and Stockpile Stewardship.

Slides:



Advertisements
Similar presentations
1 The Systems Engineering Research Center UARC Dr. Dinesh Verma Executive Director January 13,
Advertisements

1 NNSAs ICF Strategy Presented to Fusion Power Associates 34th Annual Meeting and Symposium Washington, DC December 11, 2013 Kirk Levedahl NNSA NATIONAL.
1 Getting the Job Done May 2006 Complex 2030 A Preferred Infrastructure Planning Scenario for the Nuclear Weapons Complex Nuclear and non-nuclear strike.
Building blocks for adopting Performance Budgeting in Canada Bruce Stacey – Executive Director Results Based Management Treasury Board Secretariat, Canada.
Portfolio Management at DOE/NNSA Kirby Brace Chief Operating Officer (240) (o) (954) (c)
© 2009 The MITRE Corporation. All rights Reserved. Evolutionary Strategies for the Development of a SOA-Enabled USMC Enterprise Mohamed Hussein, Ph.D.
High Energy Density Physics in the NNSA
Aug 9-10, 2011 Nuclear Energy University Programs Materials: NEAMS Perspective James Peltz, Program Manager, NEAMS Crosscutting Methods and Tools.
April 6, NPR in Context Third comprehensive review of U.S. nuclear policies and posture –Previous reviews in 1994 and 2001 Conducted by DoD.
Advancing Alternative Energy Technologies Glenn MacDonell Director, Energy Industry Canada Workshop on Alternatives to Conventional Generation Technologies.
U.S. Department of Housing and Urban Development (HUD) Enterprise Architecture Managing the Paradigm Shift Deborah Carter, CEA Director, Office of Enterprise.
Advances in Modeling and Simulation for US Nuclear Stockpile Stewardship February 2, 2009 James S. Peery Director Computers, Computation, Informatics and.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Nuclear Safeguards Education at the University of Missouri Current Activities and Future Opportunities Kathleen M. Trauth, Ph.D., P.E. Department of Civil.
1 V&V: What to Expect When You’re Doing Science Karen Pao Division of Advanced Simulation and Computing (ASC) Office of R&D for National Security S&T National.
An Enduring Nuclear Stockpile: New Bomb Plants New Bomb Plans Big Bucks Jay Coghlan Executive Director, Nuclear Watch New Mexico July 3, 2010 Please visit.
Nuclear Infrastructure Development Evaluation: Perspectives from the United States Dr. Marc A. Humphrey Office of Nuclear Energy, Safety and Security U.S.
Task Force CTE Career and Technology Education Task Force Governor’s P-20 Leadership Council of Maryland Career and Technology Education Task Force Draft.
A Dubious Bargain How Nuclear Stockpile Reductions Are Being Held Hostage By Jay Coghlan Executive Director, Nuclear Watch New Mexico July 3, 2010 Visit.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
June 1, 2004Computer Security: Art and Science © Matt Bishop Slide #18-1 Chapter 18: Introduction to Assurance Overview Why assurance? Trust and.
U.S. Department of Energy’s Office of Science Dr. Raymond Orbach February 25, 2003 Briefing for the Basic Energy Sciences Advisory Committee FY04 Budget.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
ICBM Systems Directorate Minuteman III
From the IT Assessment to the IT Roadmap ( )
Framework for Improving Critical Infrastructure Cybersecurity Overview and Status Executive Order “Improving Critical Infrastructure Cybersecurity”
April 5, The President’s Nuclear Security Agenda First articulated in Prague in April 2009 –Reduce nuclear dangers and pursue the long-term goal.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
The Climate Prediction Project Global Climate Information for Regional Adaptation and Decision-Making in the 21 st Century.
US Dependence on Strategic Nuclear Weapons Does shifting to “zero” make sense? Keith Hansen June 15, 2012.
The Challenge of IT-Business Alignment
Tom MAZOUR IAEA, Division of Nuclear Power
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
DRAFT – For Discussion Only HHSC IT Governance Executive Briefing Materials DRAFT April 2013.
Update on NNSA’s Inertial Confinement Fusion Program Presented to: Fusion Power Associates 32nd Annual Meeting and Symposium Washington, DC Presented by:
Advancing Natural and Nature-Based Infrastructure Solutions through Policy and Partnerships Kim Penn, NOAA Office for Coastal Management.
Supporting further and higher education The Akenti Authorisation System Alan Robiette, JISC Development Group.
AFRL Nuclear S&T Investment Strategy Dr. David Hardy SES Associate Director for Space Technology Air Force Research Laboratory 27 August 2010.
DoD Logistics Human Capital Strategic Planning Overview June 26, 2007.
1 Goals and Targets to Direct FY2010 Budget and Stimulus.
DOE PM Workshop Owen F Barwell Deputy CFO April 2012.
Chapter 3 Strategic Information Systems Planning.
By: Tyler Callese. Thesis America’s aging nuclear deterrent must be either modernized or have a life extension program enacted because of the imminent.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
N A T I O N A L N U C L E A R S E C U R I T Y A D M I N I S T R A T I O N O F F I C E O F D E F E N S E P R O G R A M S The National Academy of Sciences.
Lesson 2 – Disarmament.  Review goals of NPT treaty.  Compare different types of weapons.  Identify key treaties regulating nuclear arsenals.  Describe.
1 Capacity Building: Concept, Definition and Methodology for Self Assessment 4 th Meeting of Steering Committee on E&T December 4, 2012 Shahid Mallick.
Developing Technology for Inertial Fusion Energy David H. Crandall Advisor to the Under Secretary for Science On National Security and Inertial Fusion.
PRESENTED TO: ENERGY FACILITY CONTRACTORS GROUP SAFETY ANALYSIS WORKING GROUP SAFETY ANALYSIS WORKSHOP BY: CHRIS CHAVES NSR&D PROGRAM OFFICE OF NUCLEAR.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
IAEA International Atomic Energy Agency The Human and Organizational Part of Nuclear Safety Monica Haage – International Specialist on.
New Framework for Strategic Goal Assessment NSF Advisory Committee for Business and Operations November 8-9, 2006 Tom Cooley, Director, BFA.
UNCLASSIFIED Defense Threat Reduction Agency Small Business Innovation Research (SBIR) Small Business Technology Transfer (STTR) Mark Flohr Program Manager.
1 Defense Programs Predictive Science and Program Credibility: “Beyond M over U” July 2008 Njema Frazier, PhD Acting Deputy Director, Office of Advanced.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Business Intelligence Pathway Method 5 th Meeting Course Name: Business Intelligence Year: 2009.
IAEA International Atomic Energy Agency Milestones in Development of a National Infrastructure for Nuclear Power Infrastructure Issue: Management C.R.
Environment, Safety, and Occupational Health Opportunities in DoD Business Transformation May 4, 2006.
Slide #18-1 Introduction to Assurance CS461/ECE422 Fall 2008 Based on slides provided by Matt Bishop for use with Computer Security: Art and Science.
Cost Estimating Investment Planning and Project Management
International Security and Peace
“Existing world order is being redefined.” Henry Kissinger Jan 2015
Goals and Targets to Direct FY2010 Budget and Stimulus
DOE Nuclear Safety Research and Development Program
TSMO Program Plan Development
8 Building Blocks of National Cyber Strategies
Sequential Phase II Awards at the Department of Energy
Complex 2030 A Preferred Infrastructure Planning Scenario for the Nuclear Weapons Complex Nuclear and non-nuclear strike capabilities Defenses Responsive.
MODULE 11: Creating a TSMO Program Plan
Presentation transcript:

N A T I O N A L N U C L E A R S E C U R I T Y A D M I N I S T R A T I O N O F F I C E O F D E F E N S E P R O G R A M S Fusion Ignition and Stockpile Stewardship Presentation to: Fusion Power Associates Annual Meeting “Fusion Energy: Expectations” Dr. Donald Cook Deputy Administrator for Defense Programs National Nuclear Security Administration 15 December 2011

2 Overview National strategic policy for nuclear weapons Requirements resulting from 2010 Nuclear Posture Review Logical structure connecting policy to programs and campaigns Weapon Life Extension Program (LEP) planning requirements and structure Enabling Tools Predictive Capability Framework (PCF) Component Maturation Framework (CMF) Role and application of Stewardship tools Role and application of Fusion Ignition and Burn in Stockpile Stewardship

3 National Strategic Policy for Nuclear Weapons has been clearly formulated “In order to sustain a safe, secure, and effective U.S. nuclear stockpile as long as nuclear weapons exist, the United States must possess a modern physical infrastructure – comprised of the national security laboratories and a complex of supporting facilities – and a highly capable workforce with the specialized skills needed to sustain the nuclear deterrent and support the President’s nuclear security agenda.” Department of Defense, “Nuclear Posture Review”, April “ The United States will take concrete steps towards a world without nuclear weapons... Make no mistake: As long as these weapons exist, the United States will maintain a safe, secure and effective arsenal to deter any adversary, and guarantee that defense to our allies...” President Obama, April 5, 2009 Prague, Czech Republic

4 National Strategic Policy for Nuclear Weapons has been clearly formulated The NPR stated the following as priorities, among others: “…providing annual stockpile assessments through weapons surveillance.” “…funding fully the ongoing LEP for the W76 submarine-based warhead and the LEP study and follow-on activities for the B61 bomb…” “…initiating a study of LEP options for the W78 ICBM warhead, including the possibility of using the resulting warhead also on SLBMs to reduce the number of warhead types…” “…the science, technology and engineering base, vital for stockpile stewardship as well as providing insights for non-proliferation, must be strengthened…” Department of Defense, “Nuclear Posture Review”, April 2010

5 PCF and CMF define a systematic array of deliverables in response to stockpile / deterrence requirements PCF and CMF provide a smooth link between key requirements and Program / Campaign activity Strong interaction between PCF, CMF and stockpile modernization requirements provide a strong foundation for the SSMP National Policy And Strategic Planning Fundamental Source Documents – set weapons requirements e.g. LEP Plans ; Primary Certification Plan Programs and Campaigns Implementation PCF LEP 6X Process CMF Definition / schedule of major tasks The Predictive Capability Framework (PCF) and Component Maturation Framework (CMF) have become general tools in Defense Programs Planning

6 LEP Planning Framework Programmatic and Technical Source Requirements Life Extension Options Engineering, Readiness, Stockpile Services (Development/Production) Science, ASC, ICF, Advanced Certification, Engineering Production Readiness/ RTBF CMF PCF Stockpile Modernization Requirements and Drivers Prioritizing and Planning Investment Decision Technology Development, Certification, and Component Maturation Technology Down- Select and Stockpile Insertion Stockpile Services and Systems (Advanced Architecture)

7 The Predictive Capability Framework (PCF) Provides a Roadmap for Science Advances

8 The Component Maturation Framework (CMF) provides a roadmap for stockpile technology development and insertion

9 Flow of Science and Technology Deliverables to the LEP process Phase 6.2/2A Feasibility and Cost Study Phase 6.4 Production Engineering Phase 6.3 Development Engineering Phase 6.5 FPU Phase 6.6 Full Rate Production Phase 6.1Study SSMP-PCF, CMF Refurbishment options analyzed (PCF) Determination of component lifetimes (CMF) CMF Component technology and manufacturing development Integration between DAs, PAs, and FPMs PCF Certification and qualification activities Models and simulations of all aspects of weapon performance Supplies computational tools and data to the CMF Phase 6.x Acronyms DA=Design Agency FPM=Federal Program Manager PA=Production Agency Acronyms DA=Design Agency FPM=Federal Program Manager PA=Production Agency

10 After the explosive phase, weapons rapidly evolve into the HED and plasma regimes (UGTs, sub-crits, DARHT, JASPER, etc) HE phase High explosive creates supercritical assembly Primary phase Super-critical assembly Primary energy production Pre-nuclear phase Energy transfer X-rays transfer energy from primary to secondary Secondary phase Secondary produces energy, explosion and radiation Nuclear Phase (UGTs NIF and, Z) Weapons operation proceeds through the conditions of planetary interiors, to stellar interiors

11 The Predictive Capability Framework (PCF) Provides a Roadmap for Science Advances

12  Implementation of the 2010 Nuclear Posture Review is being pursued aggressively. The results show in an increased focus on support for the New Start treaty, nuclear non-proliferation, weapon life extension programs, infrastructure investments, and weapon dismantlements.  The Stockpile Stewardship and Management Plan provides a roadmap for the advanced science and technology development required to maintain the safety, security and reliability of the stockpile. Conclusions