MINI HYDRO POWER DEVLOPMENT IN SRI LANKA - INITIATIVES

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Renewable Energy in Islamic Republic Of Iran
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Donors’ Conference on Sustainable Energy for Kosovo
Bandula S. Tilakasena Project Director Trincomalee Coal Power Project Ceylon Electricity Board 21 October, 2007 Pricing policy for renewable energy: Avoided.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Hydropower Development: Experience of Nepal
The Need for an Energy Grid in the Maldives
Barriers to Greenhouse Gas Mitigation Options in Developing Economies like Sri Lanka and Strategies to Overcome them Professor Priyantha D.C. Wijayatunga.
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
6 -19 Nov Ministry of Industry Electricity of Vietnam Institute of Energy Participant To Thi NGOC Nov KOICA – Follow- Up Workshop in.
Draft Energy Policy for Nairobi City County An Initiative of UN-Habitat in Collaboration with Nairobi City County Rose Muema Chief Officer, Urban Planning.
Kenya project concepts Maputo april BACKGROUND POPULATION 32MILLION 80% rural 68% SHARE OF BIOMASS ENERGY &9% ELECTRICITY, 22%PETROLEUM, 1%OTHERS.
Energy Renewable Energy in Germany Uta Zähringer - RENAC, Athens - September 15, 2009 placeholder partner logo Renewables Academy (RENAC) AG Schönhauser.
The Caribbean Renewable Energy Development Programme, CREDP Roland Clarke, Ph. D. Project Manager, CREDP Tel: thru 9 ext. 2631
Empowering Rural Electrification in Myanmar: Opportunities and Policies Tungapuri Hotel Nay Pyi Daw, Myanmar Dr. Chris Greacen March 9, 2013.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
© Fraunhofer ISE INTERCONNECTED MINI-GRIDS FOR RURAL ENERGY TRANSITION A CASE OF NEPAL Binod Prasad Koirala 1, Alexander Schies 1, Brisa Ortiz 1, Tilak.
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Workshop for EUEI Facilitation and Policy Dialogue By Ghirmai Abraham (PhD), Ministry of National Development and Semereab Habtetsion (PhD) Department.
2014 Distributed Generation Contracts Program – Recommended Megawatt Allocation Plan November 27, 2013.
Turkish Power System Overview March 2012
PV Policy Group KOM Catania, 6-7 October About PV in Portugal Luís Silva Pedro Paes Hybrid PV-Wind power plant.
BUSINESS OPPORTUNITIES IN RENEWABLE ENERGIES FOR CHILE BUSINESS OPPORTUNITIES IN RENEWABLE ENERGIES FOR CHILE Javier García M. Deputy Head Investment and.
1 RENEWABLE ENERGY MARKET TRANSFORMATION PROJECT.
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Sanjay Garg General Manager PGCIL/ Ministry of Power
1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
Croatian Power System 1 The Electric Power System - Croatia -
Energy Agency of the Republic of Serbia
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
1 Project Development Work in Progress Uganda Team.
INTERNATIONAL RENEWABLE ENERGY AGENCY IRENA Renewables Readiness Assessment Comparative Analysis Silia Kilepoa Ualesi Suva, Fiji Islands 13 November 2015.
VANUATU Renewables Readiness Assessment Report November 2015.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Philippine Feed-In Tariff System Implementation 1.
Creating a Successful Clean Energy Business The Project Development Puzzle Richard Harkrader Carolina Solar Energy CEO March 9th 2011 Conference on a Renewable.
Renewable Energy Act of 2008
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
BRIEF ON RE PROGRAMMES STATUS AND REFITS IN TANZANIA. For International seminar on Global Renewable Energy Support Programme focusing on Globally funded.
Myanmar: Toward Universal Access to Electricity by Role of Minihydro Xiaoping Wang Senior Energy Specialist World Bank July 30, 2015.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Renewable energy support schemes in the Republic of Moldova
South East Europe Regional Consultation Meeting Bucharest, Romania 6 – 7 October 2016 Session II: Opportunities and Challenges in RE Deployment in the.
ELECTRICITY COMMISSION
Damitha Kumarasinghe Director General
Template for country interventions (5 min)
CURRENT STATUS - ENERGY TRANSITION
APEC 21st Century Renewable Energy Development Initiative
Overview on Renewable energy in Bulgaria
COUNTRY PRESENTATION OUTLINE: BURUNDI
Power generation in Sri Lanka:
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
March, 30 – April 3, 2009, Honolulu, Hawaii
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

MINI HYDRO POWER DEVLOPMENT IN SRI LANKA - INITIATIVES Eng. P.L.G. KARIYAWASAM Deputy General Manager (Energy Marketing) CEYLON ELECTRICITY BOARD

Content Introduction Whether Pattern & Geography Background to Grid Interconnection Grid Interconnection Small Power Purchase Agreement Features of SPPA Technical Consideration

Important Data (2011) Population - 20.6 million Area - 65610 sq km Elec. Cons. - 480 kWh/person Ene. Cons. - 0.43 TOE /person Annual Rain Fall - 1500 – 6000 mm Humidity - 70% (Day), 90% (Night) Avg. Temp - 30 oC

Introduction Ceylon Electricity Board IS THE Single Buyer of Electricity POWER SECTOR REGULATOR introduced in year 2009 SINCE EARLY 1990s PRIVATE SECTOR HAS BEEN ALLOWED to Built, Own and Operate Small Hydro Power GENERATION. ALL PRIVATE POWER MUST BE SOLD TO THE CEB GRID. POWER PLANTS OVER 10 MW SIGN INDIVIDUAL PPAs. Renewable Energy BASED POWER PLANTS UP TO 10 MW SIGN A STANDARD PPA VALID FOR 15-20 YEARS.

Electric Power Generation Capacity - 2011 Installed Capacity: Hydro Power - CEB 1207 MW - Private 548 MW Thermal - CEB 848 MW - Private 842 MW Wind - CEB 3 MW - Private 47 MW Maximum Demand – Day 1626.6 MW on 20.05.2011 - Night 2163.1 MW National Electrification Level – 91 % Share of Electricity to Total Energy – 9.4%

Installed Capacity in MW Energy Generation in GWh Power & Energy - Demand   Installed Capacity in MW Energy Generation in GWh 2004 2006 2008 2010 Hydro Power CEB 1207 2755 4290 3700 4988 Private 74 109 150 175 206 346 435 646 Thermal 618 548 2507 1669 2083 1384 455 567 737 842 2064 3082 3680 3600 Wind 3 12 2.7 2 o 83 Gross Generation 9389 9901 10714 Maximum Demand Day 1104.6 1312.4 1402.7 Night 1563.4 1892.5 1922.2 National Electrification Level 73.40% 78.10% 83% Source - CEB Statistical Digest

Whether Pattern & Geography Monsoons in Sri Lanka - North East (NE) Monsoon - December – February -  1st Inter Monsoon - March – April - South West (SW) Monsoon - May – September -  2nd Inter Monsoon - October - November

History of MHP Utilization of micro hydro energy in the plantation industry at the beginning of 20th century Mostly provided mechanical shaft power for the industrial process machinery. Around 500 such plants in early 20th Century Around 50 such plants are in operation in 1990’s.

Background to Grid Interconnection of Small Hydro Power Official Committee was appointed in 1992 to study Sri Lanka's power needs for the period 1991-2005. Recommended private sector participation in MHP-development Appointment of Consultants to study   Technical and legal requirements Power purchase policy Economic and financial analysis. Rehabilitation and modernization strategy.

Background to Grid Interconnection… The final study report of the consultants was presented in November 1993. The Consultants main recommendations were, Establishment of technical standards for grid connection of MHP plants, and Formulation of a contract document containing all commercial and legal aspects concerning the relationship between CEB and the MHP plant owners

Background to Grid Interconnection…. First Estate MHP Plant (60 kW) was connected to the GRID in 1994 The first new Grid Connected BOO SHP was commissioned in 1995.

Initial Small Power Purchase Agreement Developed with assistance of the World Bank Standardized Terms Published Tariff based on CEB’s Avoided Costs Applicable for; Capacity : Less than 10 MW Energy produced from : Renewable energy sources Waste Co-generation

Features of Initial Small Power Procurement Program of Ceylon Electricity Board Term of the Contract : Negotiable Transmission Interconnection : paid for by the developer Interconnection Standard : BEA Engineering Recommendation G 59.1 and CEB Guidelines Metering equipment : provided by CEB Credit for energy delivery during the Dry Season Power Purchase Guarantee by CEB: 100 % Tariff : based on CEB’s Avoided Costs each year Tariff : Payable in Sri Lanka Rupees, but calculated in US Dollars, using the prevailing exchange rates Tariff stability : Assured by a 90% Floor price

Power Sector Policy Power Sector Policy Directions 1997 Hydro power generation potential of the country will be developed to its full potential Private sector financing will be utilized for power generation from small hydro power plants Private Sector will be encouraged to develop non-traditional energy including Mini and Micro Hydro, Wind, and Solar Power up to a ceiling of 10% of the island wide demand for electricity. Dendro-Power development will also encouraged. ( (Page 10 of Proposed Power Sector Policy Guidelines November 2002)

Government Energy Policy Guidelines - Published in May 2008 High priority to energy sector Three important sections Energy policy Elements Implementing Strategies Specific Targets and Milestones and Institution Responsibilities

Government Energy Policy Guidelines Developers will be encouraged to develop non-traditional energy including Mini and Micro Hydro, Wind, and Solar Power up to a ceiling of 10% of the island wide demand for electricity. Dendro-Power development will also encouraged. – Target 2015 (Clause 4.4 of National Energy Policy May 2008)

Technical Consideration – CEB Guide for Grid Interconnection of Embedded Generation – Dec. 2000 This Guide is based on the requirements of Ceylon Electricity Board (CEB), Sri Lanka, and the conditions and constraints under which the CEB system operates. The primary intention of this Guide is to establish procedures and equipment to protect CEB personnel, equipment and the system from any harmful effects arising out of the interconnection and operation of Embedded Generators. The total capacity of embedded generation is expected to be less than 6% of the peak load, and about 15% of the minimum load. Otherwise, review the guide accordingly.

Guide for Practical Implementation of Grid-Interconnection Specification Prepared a detailed design guidelines to assist project developers (mini hydro and other renewable power facilities upto 10 MW) in selecting and designing interconnections and electrical and Electro-mechanical equipment/systems to ensure that the the project meets the technical integration with CEB grid system

Key Factors for the SHP Development Availability of profitable sites. Availability of loan funding. Availability of Technical Expertise Reliable data to carry out feasibility studies available. Prior history of SHP development in Sri Lanka. The standard PPA and Technical guidelines. BOI concessions

Data :- Statistical Digest - CEB

Village Hydro Power Plants More than 150 plants are in operation Capacity 500 W – 50 kW Total capacity 1652 kW Serving more than 6000 households

Off-Grid Renewable Energy Project Development Training Training in all aspects (financing of renewable energy projects, including off-grid systems, analyses of technical, financial and institutional capabilities for preparation of project proposals) of off-grid subproject preparation to relevant CEB staff, the private sector and village co-operatives.

Low head hydropower projects - Turbine

Low head hydropower projects - Turbine

KEY FACTORS HELPING THE DEVELOPMENT OF THE SHP SECTOR THE STANDARD PPA. AVAILABILITY OF LOAN FUNDING. AVAILABILITY OF PROFITABLE SITES. RELIABLE DATA TO CARRY OUT FEASIBILITY STUDIES AVAILABLE. PRIOR HISTORY OF SHP DEVELOPMENT IN SRI LANKA. PLANT AND MACHINERY FREE OF DUTY. INCOME TAX CONCESSIONS. DEMONSTRATION PROJECT SUBSIDISED BY NGO. MANY OF THESE FACTORS APPLICABLE TO OTHER FORMS OF RET BASED POWER. (Dr Romesh Bandaranayake, CEO, ECO Power (Pvt.) Ltd.), 2000

Thank you