Workshop on “Enforcement of Contract Clauses & Timely Recovery” on 23-24th February, 2012 ‘Time and Cost Over-run in AAI Projects (Causes and Solutions)’

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

ABC Change Orders College of Environmental Design
Project management Information systems for management1 Project Management.
Linkages Between NPoA and MTEF
IMPLEMENTING FINANCIAL AND ACCOUNTING SYSTEMS FOR GOVERNMENT CHRISTIAN T. SOTTIE THE CONTROLLER AND ACCOUNTANT-GENERAL GHANA.
Monitoring and Controlling the Project
AIMS OF PROJECT MANAGEMENT:  Ensure the respect of dead-lines  Ensure the respect of users’ requirements  Ensure the quality of the systems  Meet the.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
OBJECTIVES OF PMS  PMS is a web based application for monitoring progress of all projects undertaken by CPWD  Monitoring of projects both at pre and.
On implementation of RTI Act 2005: Government’s initiatives Department of Personnel and Training November 4, 2008, Delhi.
The Medium Term Expenditure Framework
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Managing the Information Technology Resource Jerry N. Luftman
Course Technology Chapter 3: Project Integration Management.
Chapter 3: The Project Management Process Groups
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Budgeting According to hotel management consultant Kirby Payne, ‘Managing expenses is among the most important things a manager does. (I never say it.
XII- COST CONTROL, MONITORING & ACCOUNTING
 PPP Projects ◦ Re structuring of Brownfield Airports (Delhi & Mumbai Airports) ◦ Greenfield Airports (Hyderabad & Bangalore Airports)  AAI Projects.
Expenditure control & Management 4.2.3A. Expenditure Management Introduction – It is the art and science of managing the budget – Essential for any organised.
WORKSHOP ON ENFORCEMENT OF CONTRACT CLAUSES B.PRADHAN,CVO,AAI GUWAHATI
Environmental Impact Assessment (EIA): Overview
Understanding Financial Management
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Establishment and Development of the Internal Audit System for the Public Sector in Kyrgyz Republic INTERNAL AUDIT COMMUNITY OF PRACTICE ISTANBUL
1 Ministry of Education Budget Execution March 28, 2010 As of.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
Compensation events and claims Presented by Prof. Khem Dallakoti.
STANDING COMMITTEE ON APPROPRIATIONS Presentation by Zandile Mathe Deputy Director General: NWRI 11 February Briefing by Department of Water Affairs.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
STRATEGIC PLANS, BUDGETS AND ANNUAL REPORTS Presentation to Portfolio Committee on Arts and Culture 11 March 2008.
Service Transition & Planning Service Validation & Testing
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Basic of Project and Project Management Presentation.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
REPORTING, MONITORING AND PERFORMANCE EVALUATION PROVISIONS ON NON-FINANCIALS – 2013/14 1 MIG Quarterly Workshop 3 – 4 September 2013.
Project monitoring and Control
1 of 5 Time & Cost Overrun in North Eastern Projects – Causes and Solutions. Workshop on ‘Enforcement of Contract Clauses and Timely Recovery’ Barapani.
The Multilateral Fund and its Management Structure UNFCCC Workshop on the Adaptation Fund 3-5 May 2006 Alberta, Canada Maria Nolan Chief Officer - Multilateral.
Special Railways Phase III Proposed approach to regulatory changes Jakarta 16 May 2011.
Construction Contracts
Paulius Baniūnas Ministry of Finance of the Republic of Lithuania EU Structural Support Management Department Monitoring and Analysis Division SYSTEM OF.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
State Administration Staffing a report by the Office of Program Evaluation & Government Accountability FINAL REPORT May 2008 FISCAL OPPORTUNIT Y STUDY.
Kathy Corbiere Service Delivery and Performance Commission
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
State IT Agency Briefing on Annual Report 2014/15 to Parliamentary Portfolio Committee on Telecommunications and Postal Services 16 October 2015.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
1 Chapter 8 karvaytMélKMerag nig kareFVIr)aykarN_ nig karbiTKMerag Project Evaluation, Reporting, and Termination.
Sarva Shiksha Abhiyan SSA, UT Mission Authority Andaman & Nicobar Islands loZ f’k{kk vfHk;ku CIVIL WORKS.
INTRODUCTION Mehmet Sait Andaç Web: Office: 431.
Regional Accreditation Workshop For Asia and Eastern Europe Manila, Philippines th March, 2012.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Lecture 3: Procedures of extension work
Administration of a FIDIC Contract - Project Control
Structural Funds Financial Management and Control, Romania
Administration of a FIDIC Contract - Financial Management
Monitoring and Controlling the Project
PRESENTATION TO THE SELECT COMMITTEE ON ECONOMIC AND BUSINESS DEVELOPMENT ANNUAL PERFORMANCE REPORT OF THE COMPENSATION FUND FOR THE FINANCIAL YEAR
Chapter 7: Project Cost Management
Budget Formulation: good practices
PROJECT MANAGEMENT WORKSHOP
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Workshop on “Enforcement of Contract Clauses & Timely Recovery” on 23-24th February, 2012 ‘Time and Cost Over-run in AAI Projects (Causes and Solutions)’ TOPIC

 A cost overrun, also known as a cost increase or budget overrun, is an unexpected cost incurred in excess of a budgeted amount due to an under- estimation of the actual cost during budgeting.cost Cost overrun

 Cost overrun is common in infrastructure, building, and technology projects. A comprehensive study of cost overrun published in the Journal of the American Planning Association in 2002 found that 9 out of ten construction projects had underestimated costs. Overruns of 50 to one hundred percent were common. infrastructurebuilding technologyprojects Cost Overrun…….

 Cost overrun should be distinguished from cost escalation, which is used to express an anticipated growth in a budgeted cost due to factors such as inflation.cost escalation Cost escalation

 Professor Bent Flyvbjerg of Oxford University believes that big public- works projects almost always have cost overruns due to strategic misrepresentation—"that is, lying", as he defines the term.Bent FlyvbjergOxford University Continu…..

 A time overrun, also known as a time increase is an unexpected time incurred in excess of a estimated/ allocated time.time Time Overrun

Interesting Facts  Nine (9) out of Ten (10) infrastructure projects fall victim of cost escalation  Cost escalation generally varies from 10% to 50%  Cost escalation exists across twenty (20) Nations and five (5) Continents; it is a global phenomenon. India is NOT an exception.  Cost escalation appears to be more pronounced in “Developing Nations” than in “Developed Nations”  Cost escalation has not decreased over the past 70 years - No learning seems to take place  The worst part is that the pattern has not changed for the past years  Bandra-Worli Sea Link cost escalated from Rs.300 to Rs.1600 Crores with Five (5) years delay Contd..

Interesting Facts….  According to the Economic Survey of India for till September 2005, of the 683 infrastructure projects, having an estimated cost of Rs.2,81,890/- Crores, spread over 16 sectors, 171 projects (25%) are having cost over runs to the tune of 38.87% as compared to their latest approved estimates. There are 247 projects (36%) which have a time over run, ranging from one (1) to 168 months.  The project that look best on paper have the largest cost over run.  P ublic Ownership:- “Problematic” because of lengthy/complicated procedures.  Private Ownership:- “Successful” in cost control due to over simplification.  Most of the projects of Delhi Metro of DMRC have been completed on time and within budget

 The analysis of the Ministry of Statistics and Programme Implementation shows that cost overrun in projects even with respect to the original approved cost have come down from 62% in March, 1991to 12% in March, 2008 and the increased to 21% in September This has resulted into indirect savings of more than 2,50,000 crore over a period of 10 years. This has been possible due to the dedicated effort of the infrastructure and Project Monitoring Division of MOSPI and

 Other Ministries. The increasing trend of in cost overruns in the recent years is mainly due to the impact of high increase in the cost bulk materials such as cement and steel in and recent recession. The trend of cost overruns is depicted in the Figure 1.

 The analysis of time overrun in terms of percentage of projects running behind their original schedule also shows a declining trend. Percentage of projects behind schedule declined from 62% in 1991 to lowest ever to 31.72% in March 2001, to 34.13% in March 2007 and increased again to 52.10%. The increasing trend of percentage of delayed projects is also due to the same reasons as in case of cost overruns. The projects in the Highway, Power, Petroleum, Shipping and Ports, Telecommunication, Steel, Fertilizers and Railway sectors suffered the most. The trend of percentage of delayed projects is depicted in Figure2.

Scope Quality

 Project constraints have been listed as “quality," "time," and "cost“. These are also referred to as the "Project Management Triangle," where each side represents a constraint. One side of the triangle cannot be changed without affecting the others.Project Management Triangle

 The time constraint refers to the amount of time available to complete a project. The cost constraint refers to the budgeted amount available for the project. The scope constraint refers to what must be done to produce the project's end result. These three constraints are often competing constraints: increased scope typically means increased time and increased cost, a tight time constraint could mean increased costs and reduced scope, and a tight budget could mean increased time and reduced scope.

Status of Projects in AAI as on Total Ongoing Projects52 Annex I & II Projects in Progress within time0 Projects delayed upto 25% of stipulated time 06 Projects Delayed upto 50% of stipulated time 08 Projects Delayed more than 50% of stipulated time 38 Status of Mega Projects at Kolkata & Chennai Airports Annex III

STATUS OF ONGOING PROJECTS RegionTotal On- going Projects Projects in progress within time Delay up to 25% of Stipulated time Delay up to 50% of Stipulated time Delay more than 50% of Stipulated time Northern Southern Western Eastern North- Eastern TOTAL Annex-I Engineering Works 17

STATUS OF ONGOING PROJECTS CNS Works RegionTotal On- going Projects Projects in progress within time Delay up to 25% of Stipulated time Delay up to 50% of Stipulated time Delay more than 50% of Stipulated time All Regions Annex-II 18

STATUS OF MEGA PROJECTS AT KOLKATA & CHENNAI Annex-III PARAMETER Kolkata Airport Chennai Airport Estimated Cost (Crs.) Stipulated Date of Completion Present Physical Progress 93 %96.5% Delay already occurred 33%54%

IPreparation of Faulty Estimates: - Inadequate site condition survey/data for finalizing Scope of Work - Improper Design & Drawings - Unrealistic Time Period fixed for Completion - User Consultation Process not done. 20

Preparation of Faulty estimate (Contd…) - Rates not based on actual market rates - Narrow range of approved makes - Non- consideration of rehabilitation of existing structure/services at the time of planning - Factors of insurgency / disturbed area 21

IIDelay in applying/issuing of NOC / clearance from statutory authorities IIIDelay in Environmental Clearance IVNon-availability of complete land/site free from encumbrances 22

VSelection of consultant & contract agencies: - Selection without assessing Technical & Financial capability - Lack of experience in similar nature of work 23

VIDelay in issue of working design & drawings VIIDelay in issue of NOTAM – indicative of prior lack of coordination VIIIFrequent changes in scope of work, drawings & specifications 24

IXDelay in rehabilitation of existing structures / services XNon-availability of construction material ( points to inadequate site survey resulting into costly substitution at a later date) XIIncomplete/Improper nomenclature of items in contract agreement 25

XIILack of co-ordination amongst the various disciplines and other airport functionaries XIIIInadequate monitoring system 26

1.Estimate should be based on actual site data /drawings 2.Scope of work should be well defined & finalized in consultation with user Agencies 3.Presumptions should be minimized 27

4. Realistic time frame to be kept 5. Proper Market Survey for estimates 6. Proprietary / Imported items should be minimized. 7. Timely action for statutory clearances 28

8. Technical Sanctioning Authority to ensure availability of land 9. Advance / timely actions for diversion of services/obstructions relocation of structures etc. 10. Proper Selection of Consultant & Contract agency 29

11. Regular monitoring of performance of consultants/contract agency 12.Yearly performance evaluation mechanism for timely action to weed out non- performing contract agencies/consultants 13.Timely issuance of working drawings 30

14.Proper co-ordination among the disciplines & other airport functionaries 15.Penalty Clause for deficiency in services of Consultant/Contract Agency 16.Timely decisions/ approvals / sanctions regular monitoring of Projects 31

1.Advance actions to remove hindrances, structures, diversion of services coming in the alignment of the project structures 2.Clear and well defined scope of work vetted by all stakeholder departments within AAI 3. Dedicated and independent PM&QA cell to monitor progress of work. 32

4.Web enabled project monitoring software being put into place 5.Delegation of power is decentralized with accountability 6.Project In-charge to monitor slippages in targets. 33

The “GOAL” can be achieved if we have “WILL, COMMITMENT, DEDICATION AND PASSION” to feel the need and purpose.

Important tips for effective contract management Immediately on receipt of letter of acceptance, open site order book. Hand over the site. This is important, since time allowed in contract for execution of work commences from 10 th day after the date on which the Engineer-in-Charge issues written orders to commence the work. If handing over site is made in phases. Please make an entry in site order book to the extent site handed over.

In accordance with clause 13, insist time & progress chart from the contractor. Closely monitor the progress made. Compare the progress achieved in relation to clause 13.1 of contract. This clause envisage progress of work with relation to time lapsed. In case, there is backlog in the progress, promptly issue a diligence notice. The notice should highlight the slippages.

Clause 32 of contract envisages compensation for delay. This clause stipulate that the contractor, if failed to maintain the required progress (as agreed), they are liable to pay compensation. Hence, diligence notice should invariably notify the intended action for breach caused. Closely watch the progress at the portion of site handed over. Read the contract thoroughly. Take timely decision.