1 PROJECT PROFILE : Lining of TGP Canal from KM 0.000 to KM 96.130 (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.

Slides:



Advertisements
Similar presentations
1Year of IncorporationYear of commissioning 2. a. Share Capital as on 31/03/12 ( R lakhs) Government Holding (%) i. Paid up Capital as on 31/03/12 ( R.
Advertisements

1 1 National Highways Development Project(NHDP) Ministry of Road Transport and Highways National Highways Authority of India.
Panchayati Raj Department
OBJECTIVES OF PMS  PMS is a web based application for monitoring progress of all projects undertaken by CPWD  Monitoring of projects both at pre and.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
1 Performance review of the D/o RD & PR for RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
PHASE – I & PHASE - II.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
Company is giving a fix income on every lead which is complete by you or by your Executive, I.E. Rs. 900/- E.G. if a single field executive.
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
INDIRA GANDHI SUPER THERMAL POWER PROJECT 3X500 MW Design, Engineering, Supply, Erection, Testing and Commissioning of Coal Handling System.
PRESENTER: K.P.REDDY B.E (Elect), F.I.E S.E (Retd.) APGENCO Associate President, Telangana Retired Engineer's Forum 1.
11th National Food Security Mission Executive Committee Meeting on Department of Agriculture Andhra Pradesh 1.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living KARNATAKA MUNICIPAL REFORMS PROJECT 1.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
#80 Virtual Review by Hon’ble CM dt: 5 Nov. 2018
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
Polavaram Irrigation Project
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
#82 Virtual Review by Hon’ble CM dt: 19th Nov. 2018
Polavaram Irrigation Project
#85 Virtual Review by Hon’ble Chief Minister, Dt. 21st January 2019
#87 Virtual Review by Hon’ble Chief Minister Dt: 04 FEB 2019
#89 VIRTUAL REVIEW BY HONBLE CHIEF MINISTER Dt. 25th FEBRUARY 2019
Polavaram Irrigation Project
#86 Virtual Review by Hon’ble Chief Minister, Dt. 28th January 2019
Presentation transcript:

1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement value of packages: Rs Crs. (EPC Rs Crs.) 4Expenditure :Rs Crs :Rs Crs. TOTAL EXP.:Rs Crs. 5Land Acquisition:Nil 6Mob. Advance.Paid Recovered :Rs Crs :Rs Crs.Rs Crs Total:Rs Crs. Rs Crs. 7Target Date:7/2007 TELUGU GANGA PROJECT – NANDYAL CIRCLE

Package No.50 / Cat-II : i.Lining to main canal from Km to Km i.e. upto Velugodu Balancing Reservoir. ii.Lining of main canal from Km to Km iii.Construction of high level D.L.B. at Km across Nippulavagu near Velpanur. Contractor Name : M/s E.C.C.I. & M.R.K.R.(J.V.) Agreement Amt.: Rs Crs. Agreement Date: Period of Completion: 24 Months Target date of Completion: 7/2007 Investigation:Completed Expenditure: :Rs Crores (Inc. Mob. Adv. Rs Crs) Present Status:Work in good progress Target date of completion: 7/2007 TELUGU GANGA PROJECT – NANDYAL CIRCLE

Package No.51 / Cat-II : i.Lining to Main canal from Km to Km i.e., upto Kurnool-Kadapa Border excluding where lining is already completed Name of the Contractor: M/s SVEC Constructions Agreement Amount : Rs Crs. Agreement Date: Period of Completion: 24 Months Target date of Completion: 3/2007  Investigation: Completed  Design: Approved  Execution (Canal): 17 Km lining completed against Kms  Qty. of C.C. Lining: Sq.m against Sq.m  Qty. of RR Masonry: 9440 cum done against cum  Qty. of grouting done: 46,200 Sq. mt against Sq. Mt.  Expenditure : Rs Crs. (inc. Mob. adv. Rs.6.66 Crs. ) against Rs Crs.  : Rs Crores (mob. Adv.)  : Rs Crores (including mob. adv. Rs.3.29 Crs.)  Mob. Adv. Recovered : Rs.6.01 Crores.  Target date of completion: 7/2007. It is programmed to be completed by 7/2006 itself. TELUGU GANGA PROJECT – NANDYAL CIRCLE

1 PROJECT PROFILE : Construction of SPVBR left canal, right canal and Chennamukkapalli Canal, etc. 2No. of Packages (EPC) :2 Nos. 3Agreement value of packages:Rs Crs. 4Budget Provision ( ):Rs. 465 Crs. 5Expenditure of the Project :Rs Crs :Rs Crs. Total Exp.:Rs Crs. 6Utilisaiton:29 TMC 7Ayacut:2.75 Lakh acres Kurnool – 1.08 Lakh Acres Kadapa – 1.67 Lakh Acres 8Mob. Advance.Paid Recovered :Rs Crs :Rs Crs.Rs Crs TOTAL:Rs Crs. Rs Crs. TELUGU GANGA PROJECT – KADAPA CIRCLE

Package No. 2 i.Construction of SPVBR Left Canal upto Porumamilla tank and the distributory system. ii.Construction of Irrigation canal taking off from SR-II and its distributory system. iii.Construction of Chennamukkapalli Canal and lining vulnerable reaches of main canal in Kadapa District. Name of the Contractor: IVRCL,SEW&PRASAD (JV), Hyd. Agreement Amount : Rs Crs. Agreement Date: Period of Completion: 24 Months Target date of Completion: 10/2006  Investigation (canal): Completed  Designs (Canal): Approved  Execution : 152 Km in progress against total length of 434 Km Structures: 45 Nos. against 48.  No. of Machinery deployed : 118 Nos (Poclains-15, Tippers-70, Dozers-6, SFR-3, VRR-4, Water Tankers-20)  Qty. of earth work done: Lakh cum against Lakh cum  Qty. of concrete work done: 1.15,5 Lakh cum against 3.54 Lakh cum  Expenditure : Rs Crs. (inc. mob. adv. Rs Crs) against Rs Crs.  Exp : Rs Crores (including Mob. Adv. of Rs Crores)  Exp : Rs Crores (including Mob. Adv. of Rs Crores)  Mob. Adv. Recovered: Rs Crores.  Land Acquisition: Required Ac., Requisition – 1387 Ac., Acquired: Ac. TELUGU GANGA PROJECT – KADAPA CIRCLE

Package No.3 / Cat - I i.SPVBR Left Canal beyond Porumamilla tank and SPVBR right canal. Name of the Contractor: IVRCL,SEW&PRASAD (JV), Hyd. Agreement Amount : Rs Crs. Agreement Date: Period of Completion: 24 Months Target date of Completion: 10/2006  Investigation : Completed  Designs (Canal): Approved (Structures): 66 Nos. against 314 Nos.  Execution: 60 Km in progress against total length of 120 Km  No. of Machinery deployed : 174 Nos (Excavators-35, Dumpers-100, Dozers-8, Crusher-1, Batching Plant-2 & Mixer Machines-20 etc)  Qty. of earth work done: 20 Lakh cum against 54 Lakh cum  Qty. of concrete work done: 22,500 cum against 5,11,750 cum  Expenditure : Rs Crs. (inc. mob. Adv. Rs Crs.) against Rs Crs.  Exp : Rs Crores (inc. Mob. Adv. Rs Crores)  Exp : Rs Crores (inc. Mob. Adv. Rs Crores)  Mob. Advance recovered : Rs Crores.  Land Acquisition: Required Ac; Acquired Ac. TELUGU GANGA PROJECT – KADAPA CIRCLE