ERPC, Kolkata.  Definition and Concepts  Standards and regulation for TTC calculation  Calculation of TTC  Challenges in calculation of TTC  Way.

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

Operating Reserves --- Again A Discussion Primer
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Sharing of ISTS Charges & Losses Regulation
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
Announcements Be reading Chapter 6, also Chapter 2.4 (Network Equations). HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
Available Transfer Capability Determination Chen-Ching Liu and Guang Li University of Washington Third NSF Workshop on US-Africa Research and Education.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
Borah Mitigators Remedial Action Scheme for the Borah West Path Sponsored by: IDAHO POWER Team Members: Kyle Jones Mark Magee Jason Rippee.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Optimization for Operation of Power Systems with Performance Guarantee
1 TTC/ATC Computations and Ancillary Services in the Indian context.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
ATC/TTC Basics Transmission Customer Forum Doug McLaughlin 9/22/06 Transmission Customer Forum Doug McLaughlin 9/22/06.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
TTC/ATC Computations and Ancillary Services in the Indian context
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Sharing of Inter-State Transmission Losses 11/29/
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
1 TTC/ATC Computations and Ancillary Services in the Indian context.
PS ERC 1 Reactive Power Considerations in Linear Load Flow with Applications to Available Transfer Capability Pete Sauer (With a lot of help from Santiago.
Regulatory Framework in Indian Power Sector Module C5 V K Agrawal ED, NLDC POSOCO.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Distribution Systems-General
Western Area Power Administration Transmission Customer Meeting October 17, 2007.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Agenda TSOG 8th November
Open Access.
Team Members: Kyle Jones Mark Magee Jason Rippee
Scheduling of Collective Transactions Through Power Exchange
Economic Operation of Power Systems
ISO New England System R&D Needs
Congestion regulations
Project WECC-0100 Update Load Modeling Task Force
DEC System Voltage Planning - June 2018
Project WECC-0100 Update Load Modeling Task Force
National Institute of Wind Energy(NIWE)
Presentation transcript:

ERPC, Kolkata

 Definition and Concepts  Standards and regulation for TTC calculation  Calculation of TTC  Challenges in calculation of TTC  Way forward

 To facilitate non discriminatory open access in transmission  Specifically to ascertain the limit up to which transactions in a given direction can be safely accommodated by the network, with a reasonable degree of accuracy.

 “Total Transfer Capability (TTC)” means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency  “Credible contingency” means the likely-to-happen contingency, which would affect the Total Transfer Capability of the inter-control area transmission system Outage of single transmission element (N-1) in the transmission corridor or connected system whose TTC is being determined Outage of a largest unit in the importing control area

750 MW 630 MVA 515 MW Area A Area B 515 MW TTC = 630 MVA TTC = 315 MVA considering N-1 security criteria

500 MW Area A Area B 500 MW1000 MW Gen 500 MW Transfer Capability from Area A to Area B = 1500MW After N-1 contingency=1000 MW Transfer Capability from Area B to Area A = 500MW After N-1 contingency= 0 MW

 Thermal Limits  Voltage Limits  Stability Limits Limiting conditions may shift with time as network operating conditions changes Time Horizon Power Flow Thermal Limit Voltage Limit Stability Limit Total Transfer capability

 Transmission capacity ◦ Refers to ratings  Transfer capability ◦ Refers to the system’s capability of transfer-varies considerably with system conditions ◦ Can not be arithmetically added for the individual line capacities and ratings ◦ Always less than the aggregated transmission interface between two areas 750 MW 630 MVA 1015 MW TTC = 630 MVA

Transmission CapacityTransfer Capability 1Is a physical property in isolationIs a collective behaviour of a system 2Depends on design onlyDepends on design, topology, system conditions, accuracy of assumptions 3DeterministicEstimated 4Constant under a set of physical conditions Always varying 5Time independentTime dependent 6Non-directionalDirectional 7Determined directly by designEstimated indirectly using simulation models 8Declared by designer/ manufacturerDeclared by the Grid Operator 9Understood by allOften misunderstood 10Considered unambiguous & sacrosanct Subject to close scrutiny by all stakeholders

Sl NoCorridorTransmission Capacity Transfer Capability (For January 2015) 1ER to NR12130 MW3400 MW 2ER to W MW1000 MW 3ER to SR3630 MW2650 MW 4ER to NER2860 MW720 MW 5NR to ER12130 MW2000 MW 6NER to ER2860 MW590 MW 7W3 to ER10690 MW1800 MW

 “Transmission Reliability Margin (TRM)” TRM is defined as the amount of transmission transfer capability necessary to provide reasonable assurance that the interconnected transmission system will be secure.  TRM accounts for the inherent uncertainty in system conditions and the need for operating flexibility to ensure reliable system operation as system conditions change.

 Need ◦ To take care of uncertainty like  Aggregate Load forecast  Load distribution uncertainty  Forecast uncertainty in transmission system topology  Variations in generation dispatch  Quantification ◦ Two percent (2%) of the total anticipated peak demand met in MW of the control area/group of control area/region (to account for forecasting uncertainties) ◦ Size of largest generating unit in the control area/ group of control area/ region

 “Available Transfer Capability (ATC)” Transfer capability of the inter-control area transmission system AVAILABLE for scheduling commercial transactions (through long term access, medium term open access and short term open access) in a specific direction, taking into account the network security.  ATC is a prediction of the remaining amount of power that could be transferred on a path between two systems for defined system conditions. ATC = TTC – TRM

ATC = TTC – RM Reliability Margin (RM) Long Term Open Access (LTOA) Medium Term Open Access (MTOA) Advance Short Term Open Access (STOA) First Come First Served STOA Collective (PX) STOA Day-ahead STOA Intra-day STOA

Standards and Regulatory requirements

 CEA Transmission planning criteria ◦ N-1 Contingency ◦ Line loading limits for planning ◦ Voltage limits ◦ Stability limits  Indian Electricity Grid Code.  CERC regulation “Measures to relieve congestion in real time operation” amendment dated 22 nd April 2014 ◦ Methodology for assessment of TTC, TRM and ATC ◦ Power System model to be considered for simulation studies

Role of SLDCs :  SLDC shall assess the TTC, TRM and ATC on ◦ Inter-State transmission corridor considering the meshed Intra State corridors for exchange (import/ export) of power with ISTS.  These figures along with the data considered for assessment of TTC would be forwarded to the respective RLDC.  The details of anticipated transmission constraints in the intra State system shall also be indicated separately.

Role of RLDCs :  Consider the inputs provided by SLDCs  Assess TTC, TRM and ATC for ◦ intra regional corridors (group of control ◦ areas) ◦ individual control areas within the region (if required) ◦ Inter-regional corridors at respective ends for a period of one month & three months in advance.  Forward the results along with the input data considered, to NLDC  Also indicate the anticipated constraints in the intra-regional transmission system Procedure for declaration of TTC, TRM, ATC and anticipated Constraints

Role of NLDC :  Assess the TTC, TRM and ATC of inter and intra-regional links/ Corridors respectively for a period of one month & three months in advance based on ◦ The inputs received from RLDCs ◦ TTC/ TRM/ ATC notified/ considered by CTU for medium-term open access.  Inform the TTC/ TRM/ ATC figures along with constraints observed in inter-regional/ intra- regional corridors to the RLDCs

Role of NLDC (contd)  Revise the TTC, TRM and ATC due to change in system conditions (including commissioning of new transmission lines/ generation), vis-à-vis earlier anticipated system conditions  Revise TTC, TRM and, ATC based on its own observations or based on inputs received from SLDCs/ RLDCs

Method and approach

 Setting up power system model  Developing representative scenario to arrive at an initial base case  Separate base cases for calculating export and import capability: both peak and off-peak conditions ◦ Load Generation Balance ◦ Checking of networks  Assessing TTC and TRM with the help of simulation studies

Transfer Capability assessment Anticipated Network topology + Capacity additions Anticipated Substation Load Anticipated Ex bus Thermal Generation Anticipated Ex bus Hydro generation LGBR Last Year Reports Weather Forecast Trans. Plan + approv. S/D Last Year pattern Operator experience Planning criteria Operating limits Credible contingencies Simulation Analysis Brainstorming Transfer Capability Reliability Margin less Available Transfer Capability equals Planning Criteria is strictly followed during simulations

 Violation of grid voltage operating range or  Violation of transmission element loading limit in n- 1 contingency case or  Violation of emergency limit in the n-1-1 contingency case or  Stability under n-1-1 contingency of a temporary single phase to ground fault on a 765 kV line close to the bus or a permanent single phase to ground fault on a 400 kV line close to the bus  Angular difference of 30 degrees between adjacent buses under n-1 contingency.

 TTC/ TRM/ ATC figures to be made available in the website of NLDC as well as RLDCs  Any revisions in these figures also to be published on the website of NLDC & RLDCs, along with reasons  Revision of TTC Changes in anticipated conditions ◦ Commissioning of new element (generator / line / ICT) ◦ Unforeseen change in generating station availability ◦ Forced outage of a transmission element or a generator ◦ Unforeseen change in demand (due to weather fluctuations)

 As per CEA transmission planning criteria ◦ The loading limit for a transmission line shall be its thermal loading limit. ◦ Generally, the ambient temperature may be taken as 45°C; however, in some areas like hilly areas where ambient temperatures are less, the same may be taken. ◦ Emergency loading limit of line (to be considered during N-1-1 contingency ) should be considered as 110 % of thermal loading limit.

Type of ConductorThermal Limit (MVA /Ckt) * 765 KV Hexa ACSR_Zebra D/C KV Quad ACSR_Bersimis S/C KV Twin ACSR_Lapwing D/C KV Quad ACSR_Bersimis S/C KV Quad ACSR_Moose D/C KV Quad Moose_AAAC S/C KV Twin ACSR_Moose D/C KV Twin Moose_AAAC S/C KV Twin ACSR_Moose S/C KV Single ACSR_Moose S/C KV Single ACSR_Zebra S/C KV Single ACSR_Panther S/C83 * Assuming 45 deg C ambient temperature & 75 deg C maximum allowable temperature

Challenges in calculation of TTC

 Load forecast ◦ Carried out by RLDC ◦ Input from LGBR ◦ Historic data ◦ Passive involvement of state ◦ Need to be done more scientifically with involvement of all parties  Network ◦ Input from planned shutdown ◦ Operational Practice  Proper location of changing load & generation

 Segregation of corridor ◦ Sharing of ATC among entity utility  NR and Bihar  NER and North Bengal/Sikkim ◦ In some cases, same constraint may come for multiple entities  How to balance between them Source Sink Common Constraint

 Taking care of loop flow ◦ Ac power flows through least impedance path  Power pusher from ER-NR part will flow through ER- WR-NR corridor which may cause over loading in WR  No well distinguished method is there to take care this SR ER+ NER WR NR

 Planning Criteria vs Operating Criteria ◦ Operation criteria should me more or less stringent than planning criteria ?  Frequency of Revision of TTC ◦ Daily ◦ Hourly ◦ Event triggered

30 revisions in the month of November,14

Way forward

 More active involvement of state  State declares there ATC and TTC ◦ Delhi, Punjab and UP already started  Finalization of operational criteria  Line loading limits with change in ambient temperature  Input from National Reliability Council for Electricity ◦ Representation from RPC, CEA and academia ◦ Draft Operational Guidelines for calculation of TTC/ATC and RM circulated

Thank you Reliability Market TTC

Thank you

Draft Operational Guidelines for calculation of TTC/ATC and RM

 According to CEA transmission planning criteria ambient temperature should be considered as 45° for planning purpose. ◦ As temperature through out the country varies significantly with place and season, thus this will create margin during operation.  If ambient temperature falls from 45° to 40° ampacity of ACSR moose conductor rises from 798 Amps to 874 Amps a rise 0f 9.5 % (as per IEEE standards )  CERC amended regulation for detailed procedure for reliving congestion in real time operation it stated that ◦ Permissible Normal and Emergency limits for transmission element shall be as defined in CEA Transmission Planning criteria

 In a demonstration smart grid project approved by Federal Electricity Regulatory Commission (FERC), it is mentioned that with drop in ambient temperature by 10°C the Ampacity goes up by 11 % all other factor remaining same.  Since the ambient temperature over the length of line may vary it is proposed considering maximum temperature as forecasted by IMD for the next day, at two ends of the line. ◦ Ampacity of relevant line may be raised by 2% for every 2° temperature lower than ambient of 45°C, considered as based ampacity

 Different ambient temperature may be considered for day and night and between seasons.  Before Increased thermal limit on account of fall in ambient temperature is used system Operator may confirm from the owner of the terminal equipment on both side of the line if the terminal equipment is capable of carrying the increased current and also if the relay setting are in accordance with the same.

 The SPS must be considered for calculation of TTC and ATC  The relay setting of the SPS for carrying out load shedding should be set with such time delay so that the load tripping takes place, considering the emergency loading limit of the line, to prevent frequent tripping of load. ◦ Emergency loading limit even for old conductor is 40% over load over the thermal limit for 5 minutes. ◦ However keeping a safe margin, the time delay for SPS operation could be set at seconds for an overload of up to 40%.

 Before Increased thermal limit on account of emergency is used system Operator may confirm from the owner of the terminal equipment on both side of the line if the terminal equipment is capable of carrying the increased current and also if the relay setting are in accordance with the same.  It has been pointed out by POSOCO that some lines developed hot spots and have to be frequently taken out for attending to the same. ◦ It is mentioned that hot spots are result of loose connections and are likely to develop, even when the nominal current is being carried, which however may get aggravated when a higher current is carried

 Contradiction with CEA transmission planning criteria ◦ No re-despatch required for N-1 contingency which contradicts with suggestion of enhancement of TTC by SPS operation ◦ Suggest upto 110 % loading in case of N-1-1 contingency which contradicts with suggestion of loading upto 140 %.  How do we get the Temperature data for substations located in rural areas say Ramagundam, Gooty