Second Peer Review for New MGI Valves for NSTX-U (Update on Valve Testing) R. Raman, et al. October 29, 2013 1.

Slides:



Advertisements
Similar presentations
XP 1157 Increasing the CHI start-up current magnitude in NSTX B.A. Nelson et al. 1.
Advertisements

EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Vacuum Vessel Production Readiness Review
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Progress of the BEPCII Injection System Kang Wen.
WBS3 Diagnostics Planning Update Presented by B. Stratton with input from T. Brown, M. Cole, E. Fredrickson, R. Feder, P. Goranson, L. Guttadora, D. Johnson,
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Magnetic Diagnostics for GLAST-III Tokamak M. A. Naveed, Aqib javeed and GLAST Team National Tokamak Fusion Programme Islamabad Pakistan IAEA First Technical.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Vacuum system.
Remote operation of the GOLEM tokamak Gent University, December 14, 2009 Jan Stockel Institute of Plasma Physics, Prague Vojta Svoboda.
1Physics Operators Course, PCS Navigation, D.J. Battaglia, September 15, 2015 Devon Battaglia, Keith Erickson, Dennis Mueller, Stefan Gerhardt, Roger Raman,
NSTX-U NSTX-U PAC-31 Response to Questions – Day 1 Summary of Answers Q: Maximum pulse length at 1MA, 0.75T, 1 st year parameters? –A1: Full 5 seconds.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Example: Radially Polarized Tube. Introduction This is a 2D static axisymmetric piezoelectric benchmark problem A radially polarized piezoelectric tube.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
Big Magnet Design II: a) solenoid and cable concept b) short section test V.V. Kashikhin and A.V. Zlobin.
HT-7U CASIPP 1 The Engineering Design of the Poloidal Field System of HT-7U Tokamak PF Group of HT-7U Team Chinese Academy of Sciences, Institute of Plasma.
Superconducting Quadrupoles inside the HERA Experiments M. Bieler, DESY, LHC LUMI 05 Workshop, Arcidosso, September The HERA Interaction Region.
Behaviour of Runaway Electrons during Injection of High Z Impurities/Gas Puffing in HT-7 S.Sajjad INSTITUTE OF PLASMA PHYSICS,HEFEI CHINA.
An Analysis of Shell Structure for Dead Load H.M. Fan PPPL September 16, 2005.
NCSX Operation of the C1 Modular Coil in the Coil Test Facility Peer Review June1, 2006 NCSX.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
EMMA: Pulsed magnets Kiril Marinov MaRS group, ASTeC, Daresbury Laboratory 1.
RF source, volume and caesiated extraction simulations (e-dump)
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
The integration of 420 m detectors into the LHC
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Pacific school of Engineering Sub: I.P.C Topic: Pressure measurement Guided by Piyush modi Mayani Chintak Sudani Dhrutik Bhikadiya.
DESIGN, FABRICATION AND PERFORMANCE TEST OF 10 kA CURRENT LEADS FOR SST-1 Sarkar B, Sahu A. K, Panchal P, Sonara D, Bhattacharya R, Singh M, Shukla P,
Tagger and Vacuum Chamber Design Jim Kellie Glasgow University.
Design of a feedback control system for KTX Hong Li, on behalf of KTX team The 17th International RFP Workshop, October , 2015, Hefei 1.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
MSE Pulsed Septum for g-2 and Mu2e Design Review A. Makarov 2/11/2016.
Electric Pressure Transducer
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
High efficiency work and MBK development for accelerators
Design of the Injection Can
Construction and Status of Versatile Experiment Spherical Torus at SNU
HFM Test Station Main Cryostat
AEGIS Magnet System.
Progress and Issues with VTS Upgrade
Target and Horn status report
Overview of mechanical design & construction
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
SNS Coupler Shipping Plans
Presentation transcript:

Second Peer Review for New MGI Valves for NSTX-U (Update on Valve Testing) R. Raman, et al. October 29,

Valve & System Requirements Empty most of the plenum in <2ms after valve is triggered – Requires large orifice (limited by physical size limitations) – Rapid opening of the vacuum seal (coil voltage/current limits, PS size) Compatible with external magnetic fields – Conventional solenoid valves not suitable Compact in size so it can be installed on NSTX-U organ pipe flanges High reliability – Few and simpler systems for operation 4 – 5 identical systems needed for NSTX-U – Top & bottom organ pipe, 2 in mid-plane location (toroidally displaced) and one above mid-plane – Mid-plane valves need same diameter and length piping as organ pipe locations (one with length of tube ending at vessel & second in which the same length tube gets as close as reasonably possible to the plasma) 2

Up/Down view of MGI valve on Organ Pipe 3

Horizontal view of valve on Organ Pipe (Original Installation Concept) 4

Electromagnetic Valve (similar in design to the ITER MGI valve) Differential pressure across both plenums reduces load on pulsed power system By properly balancing pressures, the power supply requirements are nearly independent of the pressure in the primary chamber FY15: Max 5000 Torr (6.6 bar) – Consider >5000 Torr for FY16 and later – Requires upgrades to NSTX-U GIS 5

Valve Fabrication and Testing Update Primary plenum operated to 3500 Torr Secondary plenum at 2000 Torr 850 V, 500µF, coil current 2.3kA, 400µs pulse (200µs, FWHM) 100 Torr.L N 2 injected FY15 NSTX-U Experiments will use Torr.L neon for poloidal comparison experiments (based on recent DIII-D experiments that used Torr.L neon) 6

Present Test Set-up 7

Next Steps (1) Move test set-up to a different room – Operate power system from an adjacent room, after adding door interlocks – Increase pressure to 5000 Torr in primary chamber – Increase charging voltage to the 1.5 to 2kV range – Collect fast baratron data of pressure pulse inside vessel Finish Characterizing valve operating parameters for this first valve design (upto 1000 Torr.L) 8

TEXTOR Valve Operated at 2T Radial Fields 9 (15 X NSTX-U valve)

Next Steps (2) Test with magnets installed near the valve body – 6 inch x 3 inch x 1 inch magnets with surface field of ~1-1.3T (neodymium magnets to be used) – Higher forces can be simulated by increasing coil current above normal operating levels 10

Next Steps (3) & Modified Installation on NSTX-U (CASE 1) Strengthen internal valve components – Possibly use mm orifice size, dependent on Valve 1 results Characterize this valve upto 1000 Torr.L Describe results in Peer Review (Jan, 2014) – Then fabricate NSTX-U valves Revised installation arrangement also avoids issue of lithium getting trapped near O-ring seals – Need to consider how to support current leads from the valve (2-5kA current, coax or twisted pair) – Additional support for external valve body – Valve will be electrically isolated from vessel by a suitable insulating (non- ceramic) spacer (0.5 inch thick), and insulated bolt sleeves 11