Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.

Slides:



Advertisements
Similar presentations
Status of test beam data analysis … with emphasis on resistive coating studies Progress and questions 1Meeting at CEA Saclay, 25 Jan 2010Jörg Wotschack,
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
RAD Engineering BLM VME J2 Backplane Printed Circuit Board Backplane Crosstalk Comparison January 25, 2005.
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
Star Week 6-10 Frb 2002SSD Status Report 1# SSD Status Report Main components Production status Last news: first ladder Schedule SSD pages:
Stations There are six stations of RPCs. They are 1-3 north, and 1-3 south. RPC3SRPC2S RPC1SRPC1N RPC2NRPC3N This document is available at
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.
Electronics II Lab. Two Weeks. power connections Solderless Prototyping Board jacks for power connections.
Walls crates cables gas chambers electronics CERN adb.
MKD stack upgrade MKD generator meeting Viliam Senaj 23/06/2015.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
RC chip Junji Tojo RIKEN VTX Meeting February 9 th, 2005.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of NA62 straw electronics Webs Covers Services Readout.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
Information for the assembly of the test board w/ PMT and preamps
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
CLAS12 Drift Chamber Prototyping
12/17/01 Ron Sidwell 1 Run2b Datapath 17 Dec Update Bill Reay, Ron Sidwell, Noel Stanton, Russell Taylor, Kansas State University.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule.
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Future Work: LAPPD 6cm system and device Lei Xia.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
PPAC production and status Kwangbok Lee Low Energy Nuclear Science team Rare Isotope Science Project Institute for Basic Science July 11,
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
ELENA installation progress F. Butin / ELENA collaboration.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Update of Prototype AT-TPC May 6, 2010 Weekly meeting Daisuke Suzuki, NSCL.
Structure and etc Shoji Uno (KEK) at B2GM
Some proposals on HV circuits realization for segmented straw detector
Noise on chambers M1R4 N.Bondar
Update of Prototype AT-TPC
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Presentation transcript:

Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1

More Clamps Installed in IR 2 Installed upto 28 clamps to North St.3 and monitored drawing currents for a week. Installed upto 28 clamps to North St.3 and monitored drawing currents for a week. Basically clamps didn’t add much drawing current up to humidity of 60+  %.

Input AC pulse from Cathode Action Items from Review (I) 1.AC readout 3 Reported in the June DC meeting In order to see clear difference between connected/unconnected channels, the connection between clamp and GND needs to be modified. Test bench using St-1 test chamber. Clamp channel in contact w/ pad Clamp channel not in contact w/ pad

AC Readout 4 HV side GND side HV side GND side DC Voltage Readout AC Voltage ReadoutOne AC readout clamp will be available for test on June 15 th.

AC Readout Input AC Readout AC (connected) Readout AC (not connected) Input AC Difference is 1/3 but it is kind of touchy Difference is 1/3 but it is kind of touchy

Plan for AC readout We need to sit down and thoroughly repeat the AC readout test bench. Pin down why we pickup AC signal even in non-connected channels. We’ll test AC readout again in 1008 in August. Move on to Production with AC readout design. 6

Action Items from Review II 1 Week Humidity test 7

Action Items from Review III Capacitors 8 3kV Rated Capacitors being used for ~ 1.9kV Operation. Should be verified reliability. 3kV Rated Capacitors being used for ~ 1.9kV Operation. Should be verified reliability. DEBB33F101K (Prototype) DEBB33F101K (Prototype) DEHR33F151K (Production) DEHR33F151K (Production) DEA1X3F101J 100pF 150pF Generating Heat Size of Capacitor Last longer (reliable) DEB DEH DEA Space constraint prevent from employing DEA model. -> DEH

Production Status Print Board Assembly $40k ~ $90k Procurement Base and Spacer ~ $10k Tokyo Precision Co. (Itabashi) Delivery to RIKEN in Oct.31 Dry Air Cover ~$16k AB Model Co. (Kawasaki) Delivery to BNL in Sept.31 Assembly of base and print board will be done by Students RIKEN. 9

Recap Assembly CompanyLocationMeetingContactQualification REPIC Co, OK Cnex Co.Tokyo6/27TakahashiD Soushin Co.Tokyo6/29SatoD Arusu Co.Fukushima6/29SatoC Pulax Co.Tokyo7/4OkamotoC Raising Co.Osaka 関 10 Trying to get quotes from several companies. Expecting bidding from a couple of companies above. Three companies are qualified to bid (Rank >= C).

Print Board Assembly Production Schedule Procurement : 7/13 ~ 7/29 Judge & Order : ~ 8/7 Production (560 clamps) : – Getting Materials (1 ~ 1.5 Month) – Assembly (1 ~ 2 Months) – Delivery to RIKEN (Oct.14) (Parylene?) Coating (1~ 2 weeks, End of Oct.) Assembly and (2weeks) Shipping to BNL (1week, Mid~End of November) 11