Měřící Energetické Aparáty, a.s. www.e-mega.cz. Měřící Energetické Aparáty, a.s. www.e-mega.cz Measurement of voltage quality in electricity meter  Technicaly.

Slides:



Advertisements
Similar presentations
Interharmonic Levels at a DC Arc Furnace Installation Erich W. Gunther Electrotek Concepts, Inc.
Advertisements

Modeling of Reconnection of Decentralized Power Energy Sources Using EMTP ATP Ing. Dušan MEDVEĎ, PhD. Železná Ruda-Špičák, 25. May 2010 TECHNICAL UNIVERSITY.
Energy Cost Optimization in Water Distribution Systems Using Markov Decision Processes Paulo T. Fracasso, Frank S. Barnes and Anna H. R. Costa University.
Power Quality during the late 90’s  PQ was dominated by Fluke and LEM  Power Utilities has just started talking about standards to be followed  National.
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
DISTRIBUTION EFFICIENCY UPDATE 1. Distribution Efficiency – Quick Review Tier 1 study (19 circuits) completed in 2011 – Four circuits identified for pilot.
Analog Circuits for Self-organizing Neural Networks Based on Mutual Information Janusz Starzyk and Jing Liang School of Electrical Engineering and Computer.
Frankfurt (Germany), 6-9 June 2011 Coordination between TSOs and DSOs – a necessity for system planning and operation Dr. Ralph Pfeiffer Amprion GmbH 1.
Precision AC Current Measurement Technique Guildline Instruments Limited.
FRIENDS and WAR The mission of the Power Center for Utility Explorations is to explore all energy issues holistically and to develop innovative solutions.
An introduction to China’s Science & tech. Programs CHENG, Xu May 23,2006 Department of Computer Science and Technology College of EECS, Peking.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Cost Implications of Architectural Design Variables Ahmed S. Al Zahrani December 2005 King Fahd University of Petroleum & Minerals Department of Construction.
Copyright © 2009 Pearson Education, Inc. Lecture 10 – AC Circuits.
CheckMeter 2.3 Portable Working Standard Page 1 March 2009.
in the Age of the Photovoltaic
Fundamentals of Harmonics
Fundamentals of Electric Circuits Chapter 11
Chapter 4 Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Main article: Leakage inductance
Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept /6/20091www.powerquality.org all rights reserve.
/1 Testing Harmonics and Flicker /1 Harmonics & Flicker Two different test standards: EN & EN EN controls.
1 Georgian National Energy And Water Supply Regulation Comission Power Losses Nugzar Beridze June 27-July 3, 2008.
Frankfurt (Germany), 6-9 June 2011 Economic assessment of PQ solutions Helge SELJESETH – Norway – RT 2b – Economic assessment of PQ solutions.
Basics of Measurement and Instrumentation
Copyright © 2009 Pearson Education, Inc. Chapter 30 Inductance, Electromagnetic Oscillations, and AC Circuits.
Fundamentals of Electric Circuits Chapter 11
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Telegestore Paris, February Remote Management System for the Entire Energy Distribution Process Enhances the Role of Low Voltage Network as a Means.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Portable Working Standard and Power Quality Analyzer
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
Low-Power Wireless Sensor Networks
A NEW MARKET PLAYER: THE AGGREGATOR AND ITS INTERACTION WITH THE CONSUMER interaction Ramón Cerero, Iberdrola Distribución Paris, June 9th 2010 ADDRESS.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
VR1710 Voltage Quality Recorder Fluke Confidential 1 VR1710 Voltage Quality Recorder The Fluke VR1710 is a single- phase, plug-in voltage quality recorder.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
1 The Need for Probabilistic Limits of Harmonics: Proposal for IEEE Std 519 Revision Paulo Ribeiro Calvin College / BWX Technologies, Inc Guide Carpinelli.
Grid Connection Issues Micro Hydro Projects Rachel Hodges.
Nelson Kagan BR Session 4 – Block 3 – Planning – Paper #66 Barcelona May Technical Assessment for the Installation of Dispersed Generation.
CheckMeter 2.1 Portable Working Standard Page 1 March 2009.
Introduction & Overview Company Number , registered in England & Wales. December 2015.
Product-Pricing Strawman David Sun Ali Ipakchi 26 October.
Development and Test of Simultaneous Power Analysis System for Three-Phase and Four-Wire Power System Hun Oh 1, In Ho Ryu 2 and Jeong-Chay Jeon 3 * 1 Department.
GCSE Science A Physics 1 Transmission of Electricity Learning Outcomes Understand the need for an electrical distribution system Describe the national.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Power Quality By Using FACTS. CONTENTS INTRODUCTION WHAT IS FACTS? FOR WHAT PURPOSE FACTS ARE USED? BASIC TYPES OF FACTS CONTROLLERS BENEFITS OF UTILISING.
Interconnected Generation Preliminary Engineering Work Related to Fees.
Development of CAD concept model of package transformer substation (PTS) Aleksandra Seledkova Perm National Research Polytechnic University.
PMC-680i web interface Sep.9th 2016.
Agenda TSOG 8th November
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
Beyond the Business Case: AMR Operational Experiences and Benefits
Automated power Factor Correction and Energy Monitoring System
Fundamentals of Harmonics
Development and Test of Simultaneous Power Analysis System for Three-Phase and Four-Wire Power System Hun Oh1, In Ho Ryu2 and Jeong-Chay Jeon3* 1Department.
System Control based Renewable Energy Resources in Smart Grid Consumer
(10s points, with average (black), min (green), and max (red)
EU-IPA12/CS02 Development of the Renewable Energy Sector
Transmission Planning in a Modern Market Environment
Regulators Indices on Power Quality
Presentation on “Power Quality” Mr. P B Tupe.
Peter van Oirsouw (Phase to Phase)
آشنائی با کوره های قوس الکتريکی DC و مقايسه آن با کوره های AC
Nathan Kassees, P.E. Sr. Engineer Oncor Electric Delivery
Power Semiconductor Systems I
PowerLogic™ offer for the basic metering market
Presentation transcript:

Měřící Energetické Aparáty, a.s.

Měřící Energetické Aparáty, a.s. Measurement of voltage quality in electricity meter  Technicaly possible  Price of realisation?  Interrest of custommers?  Feasibility is time and financialy demanding  Contribution for distribution companies?  Contribution for society?

Měřící Energetické Aparáty, a.s. Measurement of energy quantity and quality  Energy meters are set gauges, measuring functions are stable and consistent  The meter is perceived by society as an unchanging, certified device and even technically well-meaning development can lead to discussion and consequently to distrust  Power Quality Measurement currently goes through a dynamic development  Implementation in the new networks and in already constructed and operated networks  Unification of standards  Time factor: price + performance ↔ time

Měřící Energetické Aparáty, a.s. parameterquantity measurementquality measurement evaluation methodsdeterministicstatistic evaluation periodcontinuous10 periods / 1 week number of values3 × 6 registers91 values measurementV, I, PFV, (in future I) precision requirementscomparable analog circuitsequal comm. requirementscomparable comm. securityrequirednot for now computing power / consumtion normalhigh

Měřící Energetické Aparáty, a.s. Questions for decision about joint measurement of electric energy quantity and quality  Delivery point for measurement of quality of electric energy is point in public distribution network, where energy is exchanged between contracting parties. This point may vary from point of measurement of electric energy quantity  Class A – for contracting relationships  Class S – for statistical evaluation (two tendencies of measuring methods)

Měřící Energetické Aparáty, a.s.  Linearity range of voltage measurement circuits: 1.75 U NOM class S – 3 rd testing state 1.52U NOM, 20% harmonics, 0.723% flicker, 1% interharmonics  Evaluation period: energy quantity / 15min quality / 10min aggregation  Data transfer security: energy quantity / billing quality / informative

Měřící Energetické Aparáty, a.s. Continuous phenomena (flagged 10 minute evaluations)  Frequency evaluation, 10s average value of harmonics basic component  Flicker evaluation, for changes ∆U/U from 1 change/min. upto 4000 ch./min.  Voltage unbalance  Harmonic analysis, frequency of calculation (10 periods/1s, without gaps) Voltage phenomena (U RMS1 or U RMS1/2, hysteresis, clustering algorithms)  For flagging  Secured power supply (measurement uncertainity 1% U nom and 20ms during 1 minute)

Měřící Energetické Aparáty, a.s. Expected development in votage quality measurement  Changes of indicative values ​​for voltage and continuous phenomena  Rapid voltage changes Record of RMS values Oscilographic record Phase angle during inception of rapid change Short change of voltage unbalance Phase shift caused by rapid change  Measurement of harmonics and interharmonics (40. H, 50.H, 100.H)  Transient voltage

Měřící Energetické Aparáty, a.s. Conclusions  Intended association of operational measurements and the measurement of quantity and quality of el. energy is in place  The solution can only be assessed on the basis of operational experience  Verification of measurement in substations which is easily accessible is offering  It is needed to respect different meanings of measurement in substation and on interface between distribution and custommer  Other solutions in case of already constructed and operated networks and another in new networks or in networks with a refurbished power equipment