OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.

Slides:



Advertisements
Similar presentations
4 pm, July 22 nd (high tide = 6pm) 12 th Street19 th Street.
Advertisements

MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.
CORPS OF ENGINEERS DREDGING INFORMATION n Corps of Engineers Dredging Information System (DIS) n Tracks Corps Performed and Contracted Dredging n Pre-bid.
Florida Inland Navigation District: Permitting and Construction of the M-5 Island Offloading & Crossroads Maintenance Dredging and the NA-1 Upland DMMA.
UMR = Balance of Environment and Transportation 1. Pool # 8 - Environmental Management Project 2. Transportation Route – human habitation & settlement.
INFRA DREDGE SERVICES PVT. LTD. 1-35, 3 rd Floor, Shroff Bhavan, Next to Yellow Gate Police Station, Carnac Bunder. PD Mello Road. Masjid Bunder (East),
US Army Corps of Engineers BUILDING STRONG ® Craney Island Dredged Material Management Area AIWA Conference Thomas C. Friberg, P.E. Chief, Operations Support.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
St. Joseph Harbor FY 2014 Dredging. St. Joseph Harbor Entrance to the Channel (Prior to Dredging) Areas to be dredged 53,000 Cubic Yards to be removed.
US Army Corps of Engineers Portland District West Coast Regional Hopper Contract.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
MOBILE DISTRICT DREDGING PROGRAM MOBILE DISTRICT DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army.
US Army Corps of Engineers BUILDING STRONG ® SAME Tampa Post - JOINT TRAINING and EDUCATION DAY Alan M. Dodd District Commander US Army Corps of Engineers,
Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.
U. S. Army Corps Of Engineers Memphis District November 16, 2007.
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
Atlantic Intracoastal Waterway (AIWW)
South Atlantic Regional Biological Assessment Update on Status of Re-initation of Consultation under Section 7 of the Endangered Species Act Terri Jordan.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD.
DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.
PHILADELPHIA DISTRICT 2008 – 2012 DREDGING PROGRAM.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
BUILDING STRONG ® 1 Savannah District AIWA Meeting November 2011.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation 1-Dimensional Modeling CWPPRA Technical Committee and.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
Savannah Harbor Expansion Project
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
Period 3 Kiana Brayton Lyle Swallows
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
Dredging Engineering: Building & Maintaining Underwater Highways
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
JACKSONVILLE ODMDS DESIGNATION M. Rau, J. Seitz, C. Smith, N. Lombardero – ANAMAR Environmental Consulting, Inc. Chris McArthur – USEPA Region 4 P. Griffin,
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
Wilmington Harbor Project - 96 Act Brannon Quel. Port of Wilmington The Cape Fear River serves as the shipping channel to the State Port in Wilmington,
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
US Army Corps of Engineers BUILDING STRONG ® Savannah District Overview Presentation.
US Army Corps of Engineers BUILDING STRONG ® Dredging with Turbidity Tests and the EPA in Green Bay Harbor Michael Staal, E.I.T. Civil Engineer U.S. Army.
Valerie A. Cappola, Ph.D. Kenneth M. Levitt USACE New England District.
Dredged Material Separation Plan Execution in New York Harbor Deepening Projects Jeff Snyder SeaVision Underwater Solutions.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
US Army Corps of Engineers BUILDING STRONG ® Rock Arch Rapids Fish Passage Cape Fear River Lock and Dam No.1 Bladen County, NC US Army Corps of Engineers.
Department of Army Permitting Process: Dredging
Threatened and Endangered Species Issues on the Kennebec River, Maine
Sand Dollars Federal Shore Protection Appropriations
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
BUILDING STRONG ® St. Louis District Low Water Operations Russell Errett Water Control St. Louis District November 29 th, 2012.
BUILDING STRONG ® SAME Savannah 2016 Annual Program Review Donna Walton Deputy for Small Business June 15, 2016.
1 US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Pool 2 Channel Management Study.
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
R. E. Randall Center for Dredging Studies
Strategic shoreline placement from coast to coast
The Florida Inland Navigation District:
Louisville District IDIQ Forecast
Beneficial Use of Dredged Material
U. S. Army Corps of Engineers,
Southern Maine Dredge Purchase Feasibility Study
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District

OP-Navigation.ppt2 SC GA ATLANTIC OCEAN Savannah R. St. Mary’s R. Savannah Harbor Savannah Harbor Brunswick Harbor AIWW Civil Works & Navigation Boundaries Boundaries

OP-Navigation.ppt3 u Sav’h Harbor 32.5 Miles u AIWW 161 Miles u Brunswick 24 Miles Total Miles Total Miles Navigation Projects

OP-Navigation.ppt4 Scheduled FY08 Dredging Work in Savannah District South Atlantic Division Savannah & Brunswick Inner Harbor FY08 Savannah & Brunswick Entrance Chl OCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEP Sea Turtles-screens & observers Striped bass spawning Hopper Dredge Maintenance Dredging Hydraulic Pipeline Dredge Maintenance Dredging Est. 6,000K CY BO10/15 Est. 2,000K CY BO23 BO15

OP-Navigation.ppt5 Savannah District FY 07 Hopper Dredge Program

OP-Navigation.ppt6 Scheduled FY08 Dredging Work in Savannah District South Atlantic Division FY08 Savannah & Brunswick Entrance Chl OCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEP Sea Turtles-screens & observers Hopper Dredge Maintenance Dredging BO10/15 Est. 2,000K CY BO23

OP-Navigation.ppt7 Savannah District u Project: Savannah Entrance Channel u Type of work: Maintenance u Depth: 42/44 ft u Width: 600 ft u Length: 11.4 miles u Quantity: 1.0 MCY u Type of Material: sand/silt/clay u Placement Areas: EPA approved ocean site and near shore sites u Distance to Placement Area: up to 11.5 miles u Type of Equipment: Hopper u Small Business Set Aside: No u Last Dredged: FY06 u Environmental Window: Dec 15- March 31 u Reason for Window: Right Whales and Sea Turtles

OP-Navigation.ppt8 Savannah District u Project: Brunswick Entrance Channel u Type Work: Maintenance u Depth: 36/38 feet u Width: 500 feet u Length: 16.8 miles u Quantity: 1.0 MCY u Type of Material: Sand/silt/clay u Placement Areas: EPA approved ocean site and near shore sites u Distance to Placement Area: up to 19 miles u Type of Equipment: Hopper u Small Business Set Aside: No u Last Dredged: FY07 u Environmental Window: 15 Dec-13 March u Reason for Window: Right Whales and Sea Turtles

OP-Navigation.ppt9 Savannah District FY07 Hydraulic Cutter Head Dredge Program

OP-Navigation.ppt10 Scheduled FY08 Dredging Work in Savannah District South Atlantic Division Savannah & Brunswick Inner Harbor OCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEP Striped bass spawning Hydraulic Pipeline Dredge Maintenance Dredging Est. 6,000K CY BO15

OP-Navigation.ppt11 Savannah District u Project: Savannah & Brunswick Inner Harbors u Type of work: Maintenance u Depth: (SH)40/46 ft, (BH)36 ft u Width: (SH)500 ft, (BH)400 ft u Length: (SH)21.3 miles, (BH)3 miles u Quantity: 6.0 mcy u Type of Material: sand/silt/mud u Placement Area: Upland placement sites u Distance to Placement Area: up to 2 miles u Type of Equipment: Hydraulic cutterhead pipeline u Small Business Set Aside: Yes u Last Dredged: FY07 u Environmental Window: (SH) March 15-May 30 (above Station ) (BH)April 1-August 1 u Reason for Window: (SH)Striped Bass Spawning (BH) Least tern nesting

OP-Navigation.ppt12 SAVANNAH DISTRICT NEW WORK DREDGING PROGRAM SAVANNAH DISTRICT NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING MEETING/WEDA US Army Corps of Engineers Savannah District US Army Corps of Engineers Savannah District

OP-Navigation.ppt13 Savannah District FY09FY10FY11FY12 ProjectDredgeQuantity Disposal Area 1st Qtr 2nd Qtr 3rd Qtr4th Qtr1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr Savannah Harbor Expansion Entrance Channel Hopper Pipeline 11.4 M Beach Ocean Littoral Savannah Harbor Expansion Inner Harbor Pipeline14.3 MUpland

OP-Navigation.ppt14 Type of Work: New Work Depth: 47‘ Width: varies Length: 36+ Miles Quantity: 25.7 Mcy Type of Material: Hard Sand, Silts and Clay Placement Area: Upland & Open water Distance to Placement Area: upto 15Miles Type of Equipment: Hopper/Pipeline Small Business Set Aside: No Last Dredged: 2007 Schedule: Bid Opening November 2008 POC: T. Alan Garrett Savannah Harbor Expansion