EstatesMaster Case Study 2 Breakfast Briefing Presentation: Setting the Facilities Budget for a large new Corporate HQ Nigel Anderson IFPI Ltd 14th June.

Slides:



Advertisements
Similar presentations
Facilities Capital Planning and Management A program management overview prepared for Ferndale School Districts Facilities Planning Committee.
Advertisements

High-level benchmarking Scientific Research Organisation – 150,000sq.m Jo Harris.
The Mellieha Local Council. General Information  Population:  9,000  Size of Territory:  22 sq. km  Local Council: 7 Councilors including the Mayor.
Facilities Management Review William Kenealy Facilities Management Review.
Emergency Operations Activation Levels
Management Structure Proposals
Annual Development & Training Event 2015 CIPFA NW AUDIT, RISK & GOVERNANCE GROUP Commercial Services Lynn Anders, Knowsley MBC.
Laboratory Accreditation – An Assessors Perspective Dr Jonathan berg City Hospital, Birmingham.
Inventory Control, Cost & Deterministic models Unit-III Revised version.
Federal Organizational-Level EMS Workgroup Overview and Status James Wozniak (DLA) Steve Woodbury (DOE) Federal Environmental Symposium East & West June.
Facility Management. The International Facility Management Association defines facility management as a profession that encompasses multiple disciplines.
Controlling Cost & Quality of Facilities Across Large Estates.
Hazard Analysis Ensuring Safe food. Hazard Analysis.
Institute of Municipal Finance Officers & Related Professions
Meeting the requirements of IAS 16 - Componentisation
INDUSTRIAL & SYSTEMS ENGINEERING
Facilities Management and Planning Horace Bomar, Director November 1, 2011.
Introduction to Facilities Management (FM). Facilities Management Benefits of FM for BSF Maximum benefits can be achieved by transferring all FM services.
13 th February  A company called Property Tectonics were commissioned to carry out a condition survey of the campus according to RICS criteria.
Operations Management Maintenance and Reliability 保養維護與可靠程度 Chapter 17
PRESENTATION OF FLEET AND FUEL CONSOLIDATION BUDGET AND FISCAL AFFAIRS COMMITTEE AUGUST 31, 2010.
Hancock Maintenance Services LTD. Client Benefits NO escalation fees for first 3 Years (Full contracts only) Average 2-10 % annual scheduled maintenance.
CONDUCT A NIGHT AUDIT D1.HFO.CL2.06
Office of Facilities Deferred Maintenance UTSA Strategic Resource Planning Council Deferred Maintenance UTSA Strategic Resource Planning Council March.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Immovable Assets Unbundling. Purpose The Fixed Asset Register does not function independently of the other financial and management systems. A comprehensive.
FEC Full Economic Costing of Research (and Teaching and Administrative) Facilities.
High School Task Force DECATUR PUBLIC SCHOOLS 02/03/2009.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Funding.
Annual seminar in Berlin – 27 th May Should EU corporate governance measures take into account the size of listed companies ? How ? Should a.
TRANSPARENCY IN LEASEHOLDERS SERVICE CHARGE Presented By: Anita Shields Anita Shields K & A Management Services Ltd Tel ,
Facilities Management and Design
Engin Ali ARTAN Industrial Engineering
INTERNAL AUDIT AND INVESTIGATION SERVICES PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE UNIT’S ACTIVITIES FOR THE YEAR ENDING 31 MARCH 2006 Z MXUNYELWA,
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Benchmarking groups what they can and cannot do for an organisation….. Jo Harris Tracey Tilbry.
1 Bridge Inspection Program Department of Transportation Legislative Audit Bureau September 2007.
(2.) Space – a State perspective  The Planning Process  Current Environment  Existing Assets  Asset Utilisation  Space Guidelines for TAFE Accommodation.
1 Integrated Risk Management: A Provincial Perspective Presentation by the Public Service Commission to the Portfolio Committee on Public Service and Administration.
Chapter 13 Food Safety Regulations and Standards.
Overall results Energy Audit Ukraine Higher Education TA UA EST Financed by EPTATF Ekodoma, Ltd 3-3 Noliktavas Street LV-1010 Riga Latvia Tel
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Management Approaches. Construction Management Customer appoints Design team and Management team.
Briefing to the portfolio committee: Social Development Audit outcomes of the Social Development portfolio for the financial year October 2015.
Estates across STFC This presentation is to give PPD the opportunity to respond to proposals for the future management of Estates across STFC The proposals.
Business Continuity Disaster Planning
June 2007Office of Federal Environmental Executive Symposium a data standard for use with construction specifications Bill Brodt Facilities Engineering.
SCHEDULE E RENTALS 437 Laverne ● Clovis, CA Ofc: (559) ● Fax: (559)
FACILITIES SERVICES NEW EMPLOYEE ORIENTATION. FUNCTION OF FACILITIES SERVICES  Facilities Services has 55 full time employees who are responsible for.
SCHOOL OF HOUSING, BUILDING AND PLANNING RBS 306 BUILDING SURVEYING STUDIO IV PROJECT 3: BUILDING FACILITIES MANAGEMENT PREPARED BY: YONG CHIN YEE
Briefing on Outline Proposals for Property Division Tim Gregory 28 June 2010 Nottinghamshire County Council.
Trading Services Briefing Welcome Nottinghamshire County Council One Council – One Business – One Plan.
Presentation of Findings Town of Hull, Massachusetts
Facility and Equipment Maintenance
Fire Safety update Mike Kay, CEO &
CR1 & CR2 07/08/08 OSFC SMPA Webinar.
Audit of predetermined objectives
MAINTENANCE ENGINEERING
Performance indicators Unplanned unavailability
Clinical Engineering Lecture (3).
Construction (Design and Management) Regulations (CDM) 2015
“Prepare, Prevent, Respond”
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
West Sussex County Council May 2018 Property Services review
Forecasting for budget and execution
Click to buy Frequency of Inspection/Test Low risk: Offices, Shops, Hotels, Nursing Homes Type Class I Class II insp. test insp. test Stationary 24.
Resource and Funding Workshop Funding for Heritage Projects
Operations Management
Restricted Building Work (RBW) Training For Trainers
Presentation transcript:

EstatesMaster Case Study 2 Breakfast Briefing Presentation: Setting the Facilities Budget for a large new Corporate HQ Nigel Anderson IFPI Ltd 14th June 2013

The Brief Borough Council Consolidation of facilities to new corporate style head office building Benchmarking required to establish facilities budget Carried out as part of strategic review of FM services

Benchmarking Process Workshop –Building specialists –Service area specialists Service level questions discussed and answered by the group Effects on benchmark cost monitored real time Audit trail recorded

Process – nudging the drivers Fabric Maintenance: Building Fabric Maintenance 1. What is the annual expenditure on maintenance of the building fabric? 0 2. What is the gross internal area of the building? How many floors are there in the building? 5 4. What is the average depth of the building? What is the floor area of any atrium? How many occupants are there in the building? 1700 External walls, windows, doors and cladding 7. What is the specification? Minimum Maintenance 8. What is the normal routine for maintenance? Casual inspect and repair 9. What was the extent of planned maintenance/ repairs/ minor alterations? Minimum 10. What was the extent of emergency repairs? Minimum 11. What restrictions were there on the time of executing the work? Minimum restrictions 12. What physical restrictions were there on gaining access to the areas? Fairly low restrictions

Process – nudging the drivers Results Total Actual Cost 0.00 Total Benchmarked Cost 54,689 Actual Cost per m Benchmarked Cost per m2 2.60

Service Definition and Costs

Service Level - Cleaning Recommended (medium) Alternative 1 (higher) Alternative 2 (lower) £411,000£585,000£375,000 The levels of service indicated are typical of a provincial or city centre back office building, e.g. as occupied by a Central Government Department or a large professional firm. This higher level would entail a very thorough cleaning regime, e.g. vacuuming carpets every day, emptying waste bins at regular pre-set intervals, cleaning worktops daily etc. Such a regime would be typical of a Headquarters building for a major corporate commercial organisation. This lower level would typically be found in the back offices of industrial estates.

Maintenance of Services Recommended (medium) Alternative 1 (higher) Alternative 2 (lower) £631,000£682,000£510,000 The maintenance regime for the major services like air- conditioning and electrical services is set at ‘preventive’ i.e. regular inspection of components and replacement before they begin to put their systems at risk. This is the normal level for offices where occupiers need non- interrupted services but without relying upon full planned maintenance – see Alt’ 1. The costs reflect the wear-and-tear of a 24/7 occupancy regime. This is for a ‘planned maintenance’ regime involving automatic replacement of theoretically life-expired components. Such a regime is really only warranted in very high risk buildings where occupiers are engaged in critical activities e.g. air traffic control, trading floors etc. This is for mainly ‘condition-based’ maintenance where there is no scheduled inspection regime but the engineers report components which require maintenance or replacement. Such a regime is typical of industrial back offices or other buildings occupied by lower-paid staff not involved in critical activities.

Thank you for your interest Any questions?