City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.

Slides:



Advertisements
Similar presentations
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Advertisements

A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
Coronado Transportation Commission Status Report to City Council February 21, 2012 Presented by Mike Giorgione, Commission Chairman.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
D2 Roadway Discussion Sound Transit Board September 22, 2011.
Workshop Presentation for Homedale, Owyhee County & Homedale Highway District for Homedale, Owyhee County & Homedale Highway District Corridor Management.
US 52 Corridor Study Public Meeting November 15, 2010.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Newport South Beach Peninsula Refinement Plan. Newport South Beach Peninsula Located on the south side of the mouth of the Yaquina Bay and the crossing.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Slide 1. Slide 2 Introduction How did you get to school as a child?
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Workshop Presentation for Canyon County Jurisdictions for Canyon County Jurisdictions Corridor Management Plan.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Walking and Biking the Busiest Roads Around Atlanta: a Bike/Ped Plan that establishes non-motorized transportation among regional-scale priorities Regan.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Southern Bridge Project Brown County Executive
Outdoor Learning Area School Parking School Playground Existing Recreation. Facilities School Parking Neighborhood Tree Buffer Basketball Courts Abandoned.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Traffic Flow Parameters Surface Street Application.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Rainier Avenue South Pilot Project Update Seattle Bicycle Advisory Board Project Manager Jim Curtin September 2, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
MED SR 18 Corridor Project MED PID October 13, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
SPEED TABLES FOR CORONADO ROAD BETWEEN 7 TH STREET AND 10 TH STREEET.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
2040 LONG RANGE PLAN UPDATE Congestion Management Process Plan (CMPP) Major Update February 24, 2016.
SANDY SPRINGS CITY COUNCIL MEETING
Downtown Valdosta Truck Traffic Mitigation Study
Comprehensive Transportation Plan
Southern Bridge Project Brown County Executive
M14A/D Select Bus Service
Alex Henry FDOT District Seven Safety Office
Presentation transcript:

City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos

Bridge Background The Central Avenue Bridge, completed in 1924, is known to the WSDOT as Bridge 155/111SP. The Bridge, part of SR 155, connects Main Street (SR 215) to SR 97 in East Omak. There has been a 500% increase in population since the bridge was constructed The bridge is: essential to the community for transportation circulation only pedestrian access across the Okanogan River between west and east Omak. traveled by school children attending East Elementary school and those students in east Omak who attend middle school and high school on the west side Omak School District buses travel across the bridge an average 70 times per day carrying over 12, 600 students per school year. The City’s Eastside Park, just at the east end of the Bridge, is a major recreation site providing baseball, soccer, swimming, tennis, skate boarding, rodeo and other equestrian events and other recreational activities.

Current Bridge Details Location: State Route 155 Spur-Omak crossing the Okanogan River in the City of Omak. State Route: Rural Minor Arterial Classification Posted Speed: 25 MPH Construction: 443 ft. long concrete arch bridge completed – 10 ft. wide lanes, with 5 ft. sidewalks on each side (In an effort to protect pedestrians, steel posts and rails were installed 1960 on the north sidewalk narrowing the walk to 3 ft. 2 in. wide) West Approach: Central Avenue is 223 ft. long from the signalized intersection with SR 215 – Main Street – to an angle point at the west end of the bridge. Central Avenue is 54 ft. wide between Main Street and the west bridge end, with two 13.5 ft. lanes, an 11 ft. left turn, and 8 ft. parking lanes both sides. At the angle point on the west end of the bridge, two 13.5 ft. lanes, and the 11 ft. left turn lane, narrow to two 10 ft. wide bridge lanes. East Approach: Omak Avenue transitions in 321 ft. from the same 54 ft. wide roadway width as Central Avenue to the two 10 ft. bridge lanes, with an angle point in the middle of the transition.

Traffic Details Information provided in the 1998 SR 215 Corridor Study states that the intersection of Main Street and Central Avenue had the first, and for many years, the only traffic signal in Okanogan County. This intersection at the heart of Omak’s downtown is one of the busiest intersections the County. Recent turn counts for the Central Avenue Intersection provided by Okanogan County show that approximately 5,464 vehicles use the intersection during the afternoon peak period from 3:30 pm to 5:30 pm. During this period well over 1,500 vehicles use the Central Avenue Bridge (SR155/111SP).

Identified Problems The bridge is a transportation bottleneck – too narrow for today’s safety standards. It is an accident risk for vehicles and pedestrians. A recent Rural Transportation study sited lack of pedestrian access to the bridge, is too narrow for large trucks, motor homes, school buses, and emergency vehicles; and adds to downtown congestion.

Identified Problems A Corp of Engineer Exit Report stated that the bridge will not structurally survive another high water event. Flooding will create severe erosion to the riverbank and threaten local businesses south of the bridge.

Identified Problems The City of Omak urges that the Central Avenue Bridge not only be evaluated for safety for pedestrians and vehicles using the bridge but also for stability of the structure.

Transportation Studies The Greater Omak Area Comprehensive Plan Update (2008) recommends widening or replacing the Central Avenue Bridge. The City of Omak’s Capital Facilities Plan (2004 – presently being updated) includes the Central Avenue Bridge project in it’s prioritized list of capital projects. The City, in cooperation with the Central Okanogan Valley Transportation Team, completed a study of the SR 215 corridor in 1998 that included analysis of a new bridge at Fourth Avenue and use Central Avenue Bridge for pedestrians only. Under the Subprogram I1 Mobility 20-year Strategies, in the Washington State Highway System Plan (HSP), the present Central Avenue bridge is identified as needing replacement.

Transportation Studies In the mid 1990’s the City completed a study of the SR 215 corridor that included analysis of a new bridge at Fourth Ave rather than replacement of the Central Ave Bridge. A new Fourth Avenue Bridge has the greatest potential for removing through traffic from Main Street, however it is also the most expensive of the options for addressing traffic in downtown Omak. Any rerouting of traffic to a new bridge on Fourth Avenue would also entail significant changes to traffic patterns between SR-97 through East Omak to downtown.

Budget The City has been working in both Olympia and Washington DC on securing funding for a new bridge. Funding for the project was cut from the 2006/07 Transportation Budget at the last minute; it would have provided funding for a bridge by Total Project Budget current estimate $ 22 Million

Request for Assistance The City would like to have a better understanding of the costs and transportation implications. The City, working with the Colville Tribes as the lead, will soon be undertaking a feasibility study that will hopefully address some of the following: Options and alternative locations for new bridge Cost estimates and visual design development (Fourth Ave to SR 97, straight Central Bridge) Community costs (if Central Bridge is removed and replaced) ROW needs and costs The City would like WSDOT cooperation as the feasibility process moves along and the Commission’s endorsement of the critical need for a new bridge.