NAESB Time and Inadvertent Management Business Practice (TIMBP) February 3, 2009 Terry Bilke.

Slides:



Advertisements
Similar presentations
NERC Policies Introduction
Advertisements

Business Practices Subcommittee Update August 17, 2010.
Business Practices Subcommittee Update October 26, 2010.
Business Practices Subcommittee Update February 1, 2011.
Business Practices Subcommittee Update February 3, 2009.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Frequency Responsive Reserve Process Update
WECC Reliability Based Control Field Trial
SIS Report Jerry Smith Albuquerque, NM March 7, 2008.
BAL-002-WECC-1 Contingency Reserves
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
FERC Order minute Scheduling.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
ISAS Update August 2, 2011 Market Issues Subcommittee.
NERC Operating Committee Activities Update September 16-17, 2014 Meeting.
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Control Performance Frequency Analysis Control Standards Surveys Inadvertent Interchange Time Error Frequency Bias Settings Control Area Assistance Automatic.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
2013 Calendar Year Customer Survey Results
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Business Practices Subcommittee Update May 4, 2010.
Standards Review Subcommittee Update November 2007 – January 2008 February 5, 2008.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Draft 2015 WECC Budget Standing Committee Meetings March 25-27, 2014.
Date 05/01/2012 MIT Manual TEC Analysis Sandip Sharma ERCOT.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Retail Market Subcommittee Visibility into OGRR219.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
NERC Field Trial ERCOT Time Error Correction. Balancing Authority Control Standards Drafting Team (BACSDT) Pursuing the option to eliminate Time Error.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
© 2011 Fannie Mae. Trademarks of Fannie Mae.© 2016 Fannie Mae. Trademarks of Fannie Mae.1 Desktop Underwriter ® (DU ® ) Version 10.0 Overview February.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. ISAS Meeting April 20, 2016 Salt Lake City, UT W ESTERN E LECTRICITY C OORDINATING.
Neighbourhood Services Scrutiny Committee 27 March 2008 Pilot Project on Assistive Technology Keith Hannah, Head of Directorate Support.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. MIC Meeting March 23, 2016 La Jolla, CA W ESTERN E LECTRICITY C OORDINATING.
Standards Review Subcommittee Update August 18, 2015 Chair Rebecca Berdahl, BPA.
WECC – NERC Standards Update
WECC Regional Standards Update
Business Practices Subcommittee Update
Kenneth Silver Los Angeles Department of Water & Power
MAC Board Effectiveness Survey
Manual Time Error Correction Discussion
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
MIC Committee Discussion
Background (history, process to date) Status of CANs
Western Electricity Coordinating Council
James Wells – PWG Chair May 25, 2018
Coordinate Operations Standard
James Wells – PWG Chair May 25, 2018
Western Electricity Coordinating Council
North America Energy Standards Board
North America Energy Standards Board
Steve Rueckert – Director of Standards
MAC Board Effectiveness Survey
Kenneth Silver Los Angeles Department of Water & Power
MIC Committee Discussion
Document Categorization Policy
Standards Review Subcommittee Update
Presentation transcript:

NAESB Time and Inadvertent Management Business Practice (TIMBP) February 3, 2009 Terry Bilke

Introduction Targeted business practice to address multiple concerns in Order No. 693 Originally submitted to NERC, NERC Staff and Standards Committee rejected the SAR saying Time Error Corrections (TEC) and Inadvertent Payback are NAESB’s purview Relies on proven Time and Inadvertent management practices, comparable to the WECC automatic TEC No ERCOT/WECC impact unless they so choose

FERC’s Order No. 693 Concerns Address number and efficiency of TECs Concerned with frequency excursions (nearly half of reported frequency excursions occurred during TEC even though the East is in TEC 15% of the time) Wants NERC to reduce and penalize large Inadvertent balances Asks NERC to investigate alternatives to present TEC practices

Targeted Business Practice Draw on past practice –Allow unilateral payback (greater of 5MW or 20% of bias) when Inadvertent balance has same sign as Time Error, –Financial Settlement (MWs disclosed to NERC, terms left to BAs) Uses Europe’s clock-day approach to TEC –Wider window (30 seconds) will further reduce the # of corrections and therefore excursions –Better participation/effectiveness due to improved awareness of TEC starts/stops

Option 2 Unilateral Payback is the Cornerstone Unilateral Payback Option 2 > Average Frequency closer to 60 Hz > Less Inadvertent passing around > Smaller Inadvertent Balances Average Frequency closer to 60 Hz > Fewer TECs> Fewer Frequency Excursions

NERC BAC Drafting Team Concern Identical Comments (potential small change in calculated CPS1) were filed with WECC WATEC The FERC dismissed these concerns in Docket No. RM and agreed with WECC When balancing the slight loss of precision in CPS1 scores with the benefit of fewer manual time error corrections, WECC does not believe the ultimate impact of using the ATEC procedure is a threat to reliability.

Key Points Under NERC’s old payback approach, 93 TECs / year Under current NERC payback method (since 1997) 223 TECs/year NERC BAC proposed alternative actually reduces today’s payback ability by about 75% for a typical balancing authority

TIMTF Recommendation Coordinated 6 month field trial Include a provision that only Balancing Authorities with CPS1>120% may participate in method 2 payback Field trial immediately stopped on any reliability issues Report published by NERC Resources Subcommittee

Month 1/2 –Training Month 3 –Allow financial settlement & unilateral payback (method 2) –Widen window to 20 seconds Month 4 –Widen window to 30 seconds –Longer corrections Month 5 –Clock-day Corrections Month 6 –Draft Report Proposed Implementation Plan *NERC BAC team may want to test smaller offset