Chapter 8 Capital Budgeting Techniques © 2005 Thomson/South-Western.

Slides:



Advertisements
Similar presentations
Chapter 9 Capital Budgeting Techniques
Advertisements

11-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
Chapter 11: Capital Budgeting: Decision Criteria Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability Index.
Should we build this plant? Lecture Twelve Capital Budgeting The Basics.
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
CapitalBudgeting Payback Net present value (NPV)
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
CHAPTER 10 The Basics of Capital Budgeting 1. Payback Period 2. Discounted Payback 3. Net Present Value (NPV) 4. Internal Rate of Return (IRR) 5. Modified.
1 Chapter 12 Capital Budgeting: Decision Criteria.
Software Project Management
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
1 Chapter 12 The Basics of Capital Budgeting: Evaluating Cash Flows.
9 - 1 Copyright © 2001 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
Copyright © 2002 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
GBUS502 Vicentiu Covrig 1 The basics of capital budgeting (chapter 11) Should we build this plant?
8-1 Chapter 8: Capital Budgeting Techniques. 8-2 n The process of planning and evaluating expenditures on assets whose cash flows are expected to extend.
1 Chapter 11 The Basics of Capital Budgeting: Evaluating Cash Flows.
Should we build this plant? The Basics of Capital Budgeting.
Chapter 6 Capital Budgeting Techniques © 2005 Thomson/South-Western.
1 Chapter 13 Capital Budgeting: Decision Criteria.
1 Chapter 10: The Basics of Capital Budgeting: Evaluating Cash Flows Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability.
10-1 CHAPTER 10 The Basics of Capital Budgeting Should we build this plant?
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 9 Net Present Value and Other Investment Criteria.
Capital Budgeting MBA Fellows Corporate Finance Learning Module Part I.
UNIT 8 Project Valuation
Project Ka Bazigaar 1. Cost-Benefit Analysis By-Rahul Jain.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
10-1 The Basics of Capital Budgeting What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions; involve large.
Copyright © 2001 by Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
1 What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions; involve large expenditures. Very important to firm’s.
Copyright © 2002 Harcourt, Inc.All rights reserved. Should we build this plant? CHAPTER 13 The Basics of Capital Budgeting: Evaluating Cash Flows.
Chapter 10: The Basics Of Capital Budgeting. 2 The Basics Of Capital Budgeting :
Copyright © 2002 Harcourt College Publishers.All rights reserved. Should we build this plant? CHAPTER 11 C apital Budgeting: Decision Criteria.
11-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
8-1 Copyright (C) 2000 by Harcourt, Inc. All rights reserved. Chapter 8: Capital Budgeting Techniques Copyright © 2000 by Harcourt, Inc. All rights reserved.
1 Chapter 10 The Basics of Capital Budgeting. 2 Topics Overview and “vocabulary” Methods NPV IRR, MIRR Profitability Index Payback, discounted payback.
1 Chapter 10 The Basics of Capital Budgeting: Evaluating Cash Flows.
1 Chapter 12 Capital Budgeting: Decision Criteria.
CHAPTER 11 The Basics of Capital Budgeting
Chapter 6 Capital Budgeting Techniques Sept 2010 Dr. B. Asiri © 2005 Thomson/South-Western.
10-1 CHAPTER 11 The Basics of Capital Budgeting Should we build this plant?
CHAPTER 11 The Basics of Capital Budgeting
Should we build this plant? CHAPTER 11 The Basics of Capital Budgeting.
What is capital budgeting? Analysis of potential projects. Long-term decisions; involve large expenditures. Very important to firm’s future.
The Basics of Capital Budgeting: Investment Criteria and
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
U8-1 UNIT 8 Project Valuation Should we build this plant?
ALL RIGHTS RESERVED No part of this document may be reproduced without written approval from Limkokwing University of Creative Technology 1-1 Chapter 8.
1 Chapter 10 Capital Budgeting. 2 Topics Overview and “vocabulary” Methods NPV IRR, MIRR Profitability Index Payback, discounted payback Unequal lives.
10-1 CHAPTER 10 The Basics of Capital Budgeting What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions;
1 Capital Budgeting Techniques © 2007 Thomson/South-Western.
CHAPTER 10 The Basics of Capital Budgeting
Chapter 10: The Basics of Capital Budgeting: Evaluating Cash Flows
The Basics of Capital Budgeting
The Basics of Capital Budgeting
Capital Budgeting Techniques
Capital Budgeting Techniques
The Basics of Capital Budgeting
CHAPTER 11 Capital Budgeting: Decision Criteria
CHAPTER 10 The Basics of Capital Budgeting.
CHAPTER 10 The Basics of Capital Budgeting
The Basics of Capital Budgeting
The Basics of Capital Budgeting
Capital Budgeting Techniques
Chapter 11: Capital Budgeting: Decision Criteria Overview and “vocabulary” Methods Payback, discounted payback NPV IRR, MIRR Profitability Index.
CHAPTER 10 The Basics of Capital Budgeting
The Basics of Capital Budgeting
The Basics of Capital Budgeting
Presentation transcript:

Chapter 8 Capital Budgeting Techniques © 2005 Thomson/South-Western

2 What is Capital Budgeting?  The process of planning and evaluating expenditures on assets whose cash flows are expected to extend beyond one year  Analysis of potential additions to fixed assets  Long-term decisions; involve large expenditures  Very important to firm’s future

3 Generating Ideas for Capital Projects  A firm’s growth and its ability to remain competitive depend on a constant flow of ideas for new products, ways to make existing products better, and ways to produce output at a lower cost.  Procedures must be established for evaluating the worth of such projects.

4 Project Classifications  Replacement Decisions:  Replacement Decisions: whether to purchase capital assets to take the place of existing assets to maintain or improve existing operations  Expansion Decisions:  Expansion Decisions: whether to purchase capital projects and add them to existing assets to increase existing operations  Independent Projects:  Independent Projects: Projects whose cash flows are not affected by decisions made about other projects  Mutually Exclusive Projects:  Mutually Exclusive Projects: A set of projects where the acceptance of one project means the others cannot be accepted

5 Similarities between Capital Budgeting and Asset Valuation Uses same steps as in general asset valuation 1. Determine the cost, or purchase price, of the asset. 2. Estimate the cash flows expected from the project. 3. Assess the riskiness of cash flows. [Note that we will explicitly address the risk issue in the next chapter. For now, risk is taken as given.] 4. Compute the present value of the expected cash flows to obtain as estimate of the asset’s value to the firm. 5. Compare the present value of the future expected cash flows with the initial investment.

6 Net Cash Flows for Project S and Project L 1,500 1, ,300 1,500 ^ Net CashFlows, CF t r edpAExctefte-Tax Year(T)ProjectSPro tL 0 a $(3,000)$( 0)

7 What is the Payback Period? The length of time before the original cost of an investment is recovered from the expected cash flows or... How long it takes to get our money back.

8 Payback Period for Project S = Payback S /800 = years Net Cash Flow Cumulative Net CF 1,500 -1, , , PB S 01234

9 = Payback L /1,500 = 3.3 years Net Cash Flow Cumulative Net CF ,600 1, , ,000 1,500 1,100 PB L Payback Period for Project L

10 Strengths of Payback: Provides an indication of a project’s risk and liquidity Easy to calculate and understand Weaknesses of Payback: Ignores TVM Ignores CFs occurring after the payback period Strengths and Weaknesses of Payback:

11 Net Present Value: Sum of the PVs of Inflows and Outflows Cost is CF 0 and is generally negative. ^ ^ ^

12 What is Project S’s NPV? k = 10% 1, ,200(3,000) 1, NPV S =

13 What is Project L’s NPV? k = 10% (3,000) NPV L =

14 Calculator Solution, NPV for L : NPV L = = NPV L Enter in CF for L: I -3, ,300 1,500 10% CF 0 CF 1 CF 2 CF 3 CF 4

15 Rationale for the NPV method: NPV= PV inflows - Cost = Net gain in wealth. Accept project if NPV > 0. Choose between mutually exclusive projects on basis of higher NPV. Which adds most value?

16 Using NPV method, which project(s) should be accepted?  If Projects S and L are mutually exclusive,accept S because NPV S > NPV L.  If S & L are independent, accept both; NPV > 0.

17 Internal Rate of Return: IRR 0123 CF 0 CF 1 CF 2 CF 3 CostInflows IRR is the discount rate that forces PV inflows = cost. This is the same as forcing NPV = 0.

18 NPV: Enter k, solve for NPV. IRR: Enter NPV = 0, solve for IRR. Calculating IRR

19 What is Project S’s IRR? NPV S = IRR S = 13.1% Enter CFs in CF register, then press IRR: 0 (3,000) IRR = ? Sum of PVs for CF 1-4 = 3,000 1, ,200300

20 What is Project L’s IRR? NPV L = Enter CFs in CF register, then press IRR: IRR L = 11.4% 0 IRR = ? Sum of PVs for CF 1-4 = 3,000 (3,000)

21 How is a Project’s IRR Related to a Bond’s YTM? They are the same thing. A bond’s YTM is the IRR if you invest in the bond IRR = ? IRR = 7.08% (use TVM or CF register)

22 Rationale for the IRR Method: If IRR (project’s rate of return) > the firm’s required rate of return, k, then some return is left over to boost stockholders’ returns. Example: k = 10%, IRR = 15%. Profitable.

23 IRR acceptance criteria:  If IRR > k, accept project.  If IRR < k, reject project.

24 Decisions on Projects S and L per IRR  If S and L are independent, accept both. IRRs > k = 10%.  If S and L are mutually exclusive, accept S because IRR S > IRR L.

25 Construct NPV Profiles Enter CFs in your calculator and find NPV L and NPV S at several discount rates (k): k NPV L 1, (259) (566) NPV S ( 91) (309)

26 IRR L = 11.4% IRR S = 13.1% Crossover Point = 8.1% k NPV L 1, (259) (566) NPV S ( 91) (309) NPV Profiles for Project S and Project L Project L Project S

27 NPV and IRR always lead to the same accept/reject decision for independent projects: IRR < k and NPV < 0. Reject. NPV ($) k (%) IRR IRR > k and NPV > 0 Accept.

28 Mutually Exclusive Projects k NPV S, IRR L < IRR S CONFLICT k> 8.1: NPV S > NPV L, IRR S > IRR L NO CONFLICT 8.1 NPV % IRR s IRR L S L

29 To Find the Crossover Rate: 1. Find cash flow differences between the projects. See data at beginning of the case. 2. Enter these differences in CF register, then press IRR. Crossover rate = 8.11, rounded to 8.1%. 3. Can subtract S from L or vice versa. 4. If profiles don’t cross, one project dominates the other.

30 Two Reasons NPV Profiles Cross: 1) Size (scale) differences. 1) Size (scale) differences. Smaller project frees up funds at t = 0 for investment. The higher the opportunity cost, the more valuable these funds, so high k favors small projects. 2) Timing differences. 2) Timing differences. Project with faster payback provides more CF in early years for reinvestment. If k is high, early CF especially good, NPV S > NPV L.

31 Reinvestment Rate Assumptions  NPV assumes reinvest at k.  IRR assumes reinvest at IRR.  Reinvest at opportunity cost, k, is more realistic, so NPV method is best. NPV should be used to choose between mutually exclusive projects.

32 End of Chapter 6 Capital Budgeting Techniques