STUDY: RENEWABLE ENERGY POTENTIAL AND RE PROJECT DEVELOPMENT WITHIN BIHAC MUNICIPALITY Bihać Municipality Bosnia and Herzegovina GTZ Office Sarajevo Splitska.

Slides:



Advertisements
Similar presentations
NONRENEWABLE AND RENEWABLE RESOURCES
Advertisements

Wind farm project “Pakline – Ljubusa – Kupres” Sarajevo, 15 March 2011.
Donors’ Conference on Sustainable Energy for Kosovo
ISA April 23rd, Reducing Site Energy Costs with Combined Heat and Power Generation.
„We can together use the power of water”. 73,000 Gorazde, Žilići bb, Bosnia and Herzegovina Goražde Sarajevo 55 km.
CODE Project WP3 – Modelling support for cogeneration across the EU27.
100% renewable electricity … 50% renewable energy … … two ambitious aims in Lower Austria? Josef FISCHER Lower Austrian Regional Government Department.
Libor Krkoska Head of office EBRD Bosnia & Herzegovina 18 April 2013 © European Bank for Reconstruction and Development | EBRD – Your partner.
Corrected for Discount Rate.
Feasibility of Solar Technology Adoption: A Case Study on Tennessee’s Poultry Industry Ernest F. Bazen & Matthew A. Brown Presented by Yao Yin.
Clean Energy Project Analysis Course Financial and Risk Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo Credit:
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Future role of renewable energy in Germany against the background of climate change mitigation and liberalisation Dipl.-Ing. Uwe Remme Institute of Energy.
BDF Summit /BASREC GSEO Stockholm 5-6 October 2009 Anders Kofoed-Wiuff, Ea Energy Analyses.
AETS/March 2006 Dominica Geothermal Project and Interconnection with Neighbouring Islands Assessment and Cost-Benefit Analysis March 2006 A E T S Application.
Sources of Energy Renewable and Non- renewable. What is Energy? Energy is the ability to do work.
Renewable Energies and Climate Protection Policy in Freiburg Dr. Dieter Wörner Director, Environmental Protection Agency City of Freiburg - Germany.
The Komi Republic (KR)is the subject of the Russian Federation, a part of the North-West Federal District. Area thousand sq. km. Population -
Hollis Energy Committee Presentation To Local Energy Solutions Conference Hollis, NH March 21,, 2015 Venu Rao Chair, HEC.
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 24 Discounted Cash Flow Analysis and Special Applications in Income Capitalization.
April 29, 2015 Lucinda Smith Climate Action Plan Process.
Status: Karsten Brinkmann PowerMex-CHP_CO2 bensheim engineers CHP – one Possibility to reduce CO 2 Karsten Brinkmann Promotion for CHP Berlin.
Vision 2050 The Change to a Sustainable Energy Path By Gunnar Boye Olesen, Emil Bedi & Ann Vikkelsoe INFORSE-Europe Article on Vision 2050 at
IFC Advisory Services Energy Efficiency and Renewable Energy Sources Programme - Introduction - Nebojša Aresnijević, Energy Efficiency Programme Manager.
PROJECT: Construction of a tourist hotel and recreation center on the river Una Sarajevo Business Forum April god. Pension SARAJ Kulen Vakuf Bihac,
2013 Energy and Economy Summit Progressive 15 June 26, June 2013Energy and the Economy Summit | L. M. Baer | Economic Opportunity in EE & RE1.
Event Location Event Date and Location ADC WINTER FORUM | PAGE 2 Development Issues Energy Project Siting Considerations Tom Graves, Burns & McDonnell.
2009 Bidders Workshop Attachment D August 3, 2009.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Claudia Tighe, CHP Deployment Program Manager, Sept. 16,2014 CHP Deployment.
Economic Evaluation of PV systems in Jordan
Lidzbark Warmiński heating plant in RETScreen Software Justyna Pawilonis 28 March 2007 Lidzbark Warmiński.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
1 © 2013 Farm Energy Centre Welcome. 2 © 2013 Farm Energy Centre Today’s programme 10:00 amRegistration 10:30 am Welcome and introduction Heating system.
ClickSuper Guide for funds using the ClickSuper eRollover calculator.
Estonian energy scenarios 2030, 2050 Mikael Togeby Anders Larsen.
課程四 : 風險分析 Application: The replacement decision Public utilities and annual cost Risk Analysis Sensitivity analysis Scenario analysis Mote Carlo simulation.
Energy Projects in Serbia – Opportunities for German Companies 28. May 2013 Dr. Jürgen Welschof Director KfW Office Belgrade.
Renewable Energy and Building Exhibitions in Cities of enlarged Europe Sofia Energy Agency - SOFENA REBECEE, Cluster Meeting, 4-6 February 2009, The Hague.
2008 Bidders Workshop Attachment D April 11, 2008.
100% energy supply by renewable energy sources: A German case study Andreas Gursch Director Environmental Science & Technology European Chamber of Commerce.
Health resort project “Bosna - AS” Sarajevo, 2015.
World energy production by source in 2004: Oil 40% coal 23.3% natural gas 22.5% hydroelectric 7.0% nuclear 6.5% biomass and other 0.7%.
11/4/02 NW Energy Coalition Clean Electricity Options for the Pacific Northwest: An Assessment of Efficiency and Renewable Potentials through the year.
Renewable Combined Heat and Power (CHP) Information from factsheet: Technology basics – page 1 What types of fuel can be used – page1 Different types CHP.
CONCERTO Premium Performance indicators of energy supply units Michael Kleber 23 October Brussels.
APART HOTEL “BORIK” – MOUNTAIN IGMAN. LOCATION OF THE HOTEL - Olympic Mountain Igman - Near the Olympic Mountain Bjelašnica - Distance from the International.
Geothermal Workshop – Glenwood Springs Francisco Flores, RE Program Associate Glenwood Springs, CO.
Sustainable Energy Technologies MSE Introduction Eduard Latõšov.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Jyväskylä’s energy use in 2012 ● The consumption of energy was 12 % lower than in 2010 ● Energy was mainly used in traffic and district heating ● The main.
11 Measures to support high- efficiency district heating and cogeneration Anders Hasselager Senior Policy Advisor Kiev, 19 May 2016.
Seite 1 Seite Seite 1 Renewable Energy & Efficiency Energy open the pathway to affordable sustainable energy Presentation by Dr.
HOW IS COAL MADE ???. HOW ARE OIL AND GAS MADE ???
Energy Year 2016 Electricity
ENERGY EFFICIENCY IN PUBLIC SECTOR IN B&H
Sarajevo Business Forum
Dominik Franjo Dominković. , I. Bačeković, D. Sveinbjörnsson, A. S
Sustainable Energy Technologies MSE0290
Energy Year 2017 Electricity
NET-ZERO-ENERGY (NZE) WASTEWATER TREATMENT PLANTS (WWTPs)
Dipl. –Ing. Nikola Kibritev Regional Energy Agency - Ruse
Energy Efficiency investments European Investment Bank
CITY OF BIHAĆ BOSNIA AND HERZEGOVINA PROJECT: BUSINESS - TOURIST AIRPORT BIHAĆ International conference on regional market, statistics development.
District heating in Finland 2017
Example Exercise 2 Cash Payback Method Cash Payback Method
Energy Year 2018 Electricity
Renewable and Non-renewable
Payback and NPV By Sahar Hussein
Who Benefits? Building Owners
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

STUDY: RENEWABLE ENERGY POTENTIAL AND RE PROJECT DEVELOPMENT WITHIN BIHAC MUNICIPALITY Bihać Municipality Bosnia and Herzegovina GTZ Office Sarajevo Splitska Sarajevo Bosnia and Herzegovina ENOVA Sarajevo Franca Lehara Sarajevo Bosnia and Herzegovina Sarajevo Business Forum May 14-15, 2014

RELATION: EXPERTS - INVESTORS Investors

HEAT CONSUMPTION AND ENERGY SAVINGS Estimated heat consumption in the municipality of Bihac by months Energy savings potential in the municipality of Bihac

PRELIMINARY COST BENEFIT ANALYSIS *NPV value is calculated with 8% discount rate and 20 year period MeasureInvestmentPayback periodIRR (20 years)NPV (8%) District Heating system Revitalisation of existing DHS 600,000 KM %-405,374 KM Replacement of Biomass 22,400,000 KM %-9,529,871 KM Replacemnet of Biomass with extension network 24,400,000 KM %-3,345,387 KM Combination biomass – heavy oil 16,000,000 KM %-4,294,852 KM Combination biomass – heavy oil with extension network 18,000,000 KM9.78.2%216,911 KM CHP with extension network & EE measures in buildings 21,000,000 KM %5,075,470 KM Combined CHP with ext. network and EE measures 32,100,000 KM9.48.6%1,288,578 KM Public buildings EE measures for PB (Sc 1) 870,000 KM annual savings 8,700,000 KM %3,308,041 KM EE measures for PB (Sc 2) 500,000 KM annual savings 8,700,000 KM ,854 KM EE measures for PB (Sc 3) 270,000 KM annual savings 8,700,000 KM %-3,510,117 KM Geothermal energy for “Gata” medical center 150,000 KM %433,836 KM

COST BENEFIT ANALYSIS Payback sensitivity by energy price for different scenarios (District Heating System)

WIND ENERGY Payback sensitivity by assumed working load for potential wind projects Payback sensitivity by assumed feed-in tariff for potential wind power projects

Payback sensitivity by assumed working load for potential hydro projects HYDRO POWER Payback sensitivity by assumed feed-in tariff for potential hydro power projects

MOST FEASIBLE SOLUTIONS

FURTHER STEPS Position of circles is defined by Payback period (x-axes) and Investment (y-axes), while the size of the circle is proportional to the Net Present Value (NPV) Best options are large circles, close to the coordinate system origin Most feasible options are: CHP with extension network and EE measures in buildings and EE measures for public buildings (Scenario 1) INTERPRETATION OF GRAPH RESULTS

Contact Contact Person: MSc Emdžad Galijašević Mayor of Bihać Address: Bihać Municipality Bosanska 4, Bihać Bosnia and Herzegovina Phone: Fax : web page: