To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout.

Slides:



Advertisements
Similar presentations
MANAGERIAL ACCOUNTING
Advertisements

John Wiley & Sons, Inc. © 2005 Prepared by Alice B. Sineath Forsyth Technical Community College Managerial Accounting Weygandt Kieso Kimmel CHAPTER 12.
Capital Investment Analysis
Capital Investments Chapter 12. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the purchase.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Average.
ICS 442 Software Project Management
Chapter 4: Project Integration Management
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Systems Analysis & Design 7 th Edition Systems Analysis & Design 7 th Edition Toolkit 3.
Capital Investment Analysis 28. The Capital Investment Process OBJECTIVE 1: Define capital investment analysis, state the purpose of the minimum rate.
F28SD2 Software Design Monica Farrow EM G30 Material available on Vision Cost/benefit analysis Accounting methods.
Lesson-23 Feasibility Analysis and the System Proposal
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
System Analysis and Design
Requirements Modeling
D-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Extended Learning Module.
Project Concept Formation Feasibility Studies & Reports
SYS364 Feasibility and Cost Analysis. Today’s Agenda  Feasibility and Cost Analysis Tools  Understanding Costs and Benefits  Payback Analysis  Return.
Moving from Analysis to Design
CIS101 Introduction to Computing Review of Charts Excel Project Two.
Chapter 2.
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
Chapter 9 Net Present Value and Other Investment Criteria
Chapter 9 Net Present Value and Other Investment Criteria
Chapter Extension 21 Financing and Accounting for IT Projects © 2008 Pearson Prentice Hall, Experiencing MIS, David Kroenke.
Systems Analysis & Design Sixth Edition Systems Analysis & Design Sixth Edition Toolkit Part 3.
The Analyst as a Project Manager
Feasibility Analysis Chapter 3
PROJECT EVALUATION. Introduction Evaluation  comparing a proposed project with alternatives and deciding whether to proceed with it Normally carried.
System Planning Analyzing the Business Case
Switch off your Mobiles Phones or Change Profile to Silent Mode
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Feasibility and Cost/Benefit Analysis. Cost considerations u Cost classifications –Tangible / Intangible –Direct / Indirect –Fixed / Variable –Developmental.
University of Sunderland CIFM02 Unit 3 COMM02 Project Evaluation Unit 3.
The Systems Analysis Toolkit
Systems Analysis – ITEC 3155 Feasibility Analysis
Considering the Costs of MUS Interventions. Direct Costs v. Opportunity Costs Direct Costs Expenditures and investments to achieve a particular outcome.
Project Feasibility Feasibility is the measure of how beneficial or practical the development of an information system will be to an organisation.
Chapter 26 Capital Investment Decisions
To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout.
Acquiring Information Systems and Applications
BUSINESS DRIVEN TECHNOLOGY Plug-In T7 Valuing Technology.
Systems Analysis and Design Fourth Edition Introduction  A project is economically feasible if the future benefits outweigh the costs  The Systems Analyst’s.
1 Chapter 3: Project Management and the Inception Phase + Project Management UP and Inception Phase Feasibility Analysis.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Moving from Analysis to Design.
Component 4: Introduction to Information and Computer Science Unit 9/Part f: Components and Development of Large Scale Systems.
CHAPTER 13 Acquiring Information Systems and Applications.
To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Project Planning Activities Project Schedule Risks Management and Project Feasibility Financial Calculations Tangible.
Feasibility Study and Feasibility Analysis. Feasibility Study: Describes and evaluates the candidate systems and helps in the selection of best system.
Irwin/McGraw-Hill Copyright © 2004 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS6th Edition.
T9.1 Chapter Outline Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization 9.1Net Present Value 9.2The Payback Rule 9.3The Discounted.
1 Systems Analysis and Design in a Changing World, Thursday, January 25, 2007.
CS211 Slide 10-1 ADCS 21 Feasibility and Cost Analysis Tools Project Management Tools Alternative System Development Methodologies (Chapter 10) Tools for.
F – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Financial Analysis F For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Software Project Management
Feasibility Analysis for a Software Project Dr. Pedro Mejia Alvarez Seccion de Computacion, CINVESTAV-IPN.
PART 2 Information Systems Development. LEARNING OBJECTIVES Systems Development Life Cycle Application Development Methodologies Project Management Systems.
Lecture 51 Project Costing Lecture 52 Objectives Define economic feasibility Identify the cost considerations that analysts consider throughout the SDLC.
Needles Powers Crosson Financial and Managerial Accounting 10e Capital Investment Analysis 24 C H A P T E R © human/iStockphoto ©2014 Cengage Learning.
Systems Analysis & Design 7 th Edition Chapter 2.
Investment Appraisal - AS “Investment appraisal means evaluating the profitability or desirability of an investment project”
C Learning Objectives Power Notes 1.Nature of Capital Investment Analysis 2.Methods of Evaluating Capital Investment Proposals 3.Factors That Complicate.
Cost Benefit Evaluation Techniques
Systems Analysis and Design in a Changing World, 4th Edition
Lecture # 4 Software Development Project Management
PLANNING FOR CAPITAL INVESTMENTS
Power Notes Chapter M9 Capital Investment Analysis Learning Objectives
Presentation transcript:

To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout the presentation to see a definition. Click to view reference figures. For further exploration, links to selected Web sites are included. Click under this banner throughout the presentation. Toolkit 3 Home Page – Welcome!

2 Toolkit Objectives  Define economic feasibility  Classify costs and benefits into various categories, including tangible or intangible, direct or indirect, fixed or variable, and developmental or operational  Understand chargeback methods and how they are used

3 Toolkit Objectives  Use payback analysis to calculate the length of time that it takes for a project to pay for itself  Use return on investment analysis to measure a project’s profitability  Use present value analysis to determine the value of a future project measured in current dollars

4 Introduction  You need to know how to calculate costs and benefits when you conduct preliminary investigations, evaluate IT projects, and make recommendations to management  Financial analysis tools are important throughout the systems development life cycle

5 Describing Costs and Benefits  You must review a project’s costs and benefits at the end of each SDLC phase so management can decide whether or not to continue the project  Economic feasibility Economic feasibility  Total cost of ownership (TCO) Total cost of ownership (TCO) Figure TK 3-2 Figure TK 3-3 Figure TK 3-4

6 Describing Costs and Benefits  Cost Classifications – Tangible costs Tangible costs – Intangible costs Intangible costs – Direct costs Direct costs – Indirect costs or overhead expenses Indirect costsoverhead expenses

7 Describing Costs and Benefits  Cost Classifications – Fixed costs Fixed costs – Variable costs Variable costs – Developmental costs Developmental costs – Operational costs Operational costs

8 Describing Costs and Benefits  Managing Information Systems Costs and Changes – Chargeback method Chargeback method 1.No charge methodNo charge method Cost center 2.Fixed charge methodFixed charge method Profit center

9 Describing Costs and Benefits  Managing Information Systems Costs and Changes 3.Variable charge method based on resource usageVariable charge method based on resource usage Resource allocation Connect time Server processing time 4.Variable charge method based on volumeVariable charge method based on volume

10 Describing Costs and Benefits  Benefit Classification – You must classify the benefits that the company expects from a project – Like costs, benefits can be classified as tangible or intangible, fixed or variable, and direct or indirect – Positive benefits Positive benefits – Cost-avoidance benefits Cost-avoidance benefits

11 Cost-Benefit Analysis  Cost-benefit analysis Cost-benefit analysis  Many cost-benefit analysis techniques exist  Three most common methods: payback analysis, return on investment analysis, and present value analysis  The objective is the same: to provide reliable information for making decisions

12 Cost-Benefit Analysis  Payback Analysis Payback Analysis – Payback period Payback period – Carry out the following steps 1.Determine the initial development cost of the system 2.Estimate annual benefits 3.Determine annual operating costs 4.Find the payback period For more information about Payback Analysis, visit scsite.com/sad7e/more, scsite.com/sad7e/more locate Toolkit Part 3 and then the Payback Analysis link.

13 Cost-Benefit Analysis  Payback Analysis – Economically useful life Economically useful life – You calculate the time it takes for the accumulated benefits of an information system to equal the accumulated costs of developing and operating the system Figure TK 3-5 Figure TK 3-6

14 Cost-Benefit Analysis  Payback Analysis – Some managers are critical of it because it places all the emphasis on early costs and benefits and ignores the benefits received after the payback period – Even with its drawbacks, payback analysis is a widely used tool Figure TK 3-7

15 Cost-Benefit Analysis  Using a Spreadsheet to Compute Payback Analysis – First step is to design the worksheet and label the rows and columns – After entering the cost and benefit data for each year, you enter the formulas – You will need a formula to display cumulative totals, year by year Figure TK 3-8 Figure TK 3-9

16 Cost-Benefit Analysis  Return on Investment Analysis Return on Investment Analysis ROI = (total benefits – total costs)/ total costs – Projects must meet or exceed a minimum ROI – You can also use ROI for ranking projects – Measures the overall rate of return for the total period, and annual return rates can vary considerably – Ignores the timing of costs and benefits Figure TK 3-10 For more information about Return on Investment Analysis, visit scsite.com/sad7e/more,scsite.com/sad7e/more locate Toolkit Part 3 and then the Return on Investment Analysis link.

17 Cost-Benefit Analysis  Using a Spreadsheet to Compute ROI – Use cumulative columns but you also will need two overall totals (one for costs and one for benefits) – The last step is to add a formula to calculate the ROI percentage rate – If your data changes, you can modify your worksheet and calculate a new result instantly Figure TK 3-11

18 Cost-Benefit Analysis  Present Value Analysis – Time value of money Time value of money – Present value analysis Present value analysis – Present value Present value – Present value tables Present value tables – Net present value (NPV) Net present value (NPV) Figure TK 3-12 Figure TK 3-13 For more information about Present Value Analysis, visit scsite.com/sad7e/more, scsite.com/sad7e/more locate Toolkit Part 3 and then the Present Value Analysis link.

19 Cost-Benefit Analysis  Present Value Analysis – In theory, any project with a positive NPV is economically feasible – Can also be used to compare and rank projects – Provides solutions to the shortcomings of payback analysis and return on investment analysis Figure TK 3-14 For more information about Time Value, visit scsite.com/sad7e/more, scsite.com/sad7e/more locate Toolkit Part 3 and then the Time Value link.

20 Cost-Benefit Analysis  Using a Spreadsheet to Calculate Present Value – There is one more way to use a worksheet in present value analysis – Most spreadsheet programs include a built-in present value function that calculates present value and other time-adjusted variable factors Figure TK 3-15

21 Toolkit Summary  Must be concerned with economic feasibility throughout the SDLC  Must classify project costs as tangible or intangible, direct or indirect, fixed or variable, and developmental or operational  Every company must decide how to charge or allocate information systems costs and the chargeback method

22 Toolkit Summary  You must also classify system benefits  Present value analysis adjusts the value of future costs and benefits to account for the time value of money  Many companies use present value analysis to evaluate and rank projects

Systems Analysis & Design 7 th Edition End Toolkit 3